Municipal Corporation Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GWMC Tender

Works
Civil And Construction
Drainage Work
Opening Date28 Mar 2025
Closing Date7 Apr 2025
Tender Amount₹ 75,99,129 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Filling with Stone dust in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work

10.5

686

7209.51

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Carting of the Exavated earth upto a lead upto 4-5 km beyond the initial lead of 1 Km from site including loadingand unloading as per the engineer in charge

31.5

72

2293.2

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work Manual

63

297

18726.75

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Supply of 25 mm thick high performance expansion joint filler board confirming to IS -1838, placing the same 25mm below top of the pavement slab sealing with hot sealing compound(Grade -A, ISI ) polysulphide at 5.00mts intervals in C.C Pavement including cost and conveyance of materials, labour charges for placing in position for expansion joints conforming to MORTH Specificatio No.602

22.63

1347

30493.25

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;RBR-CCPV-5- Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 53 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including curing of concrete slabs for 14- days, and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.-for roads

162

6907

1118950.2

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Supplying and placing of Separation Membrane of impermeable plastic sheeting 125 microns thick under pavement slab including cost and conveyance of etc., complete

1092

21

23576.28

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH

18

2513

45241.56

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Construction of Gravel base including cost, and conveyance of all materials to work site and spreading in uniform layers by approved means, on prepared surface and compacting with three wheel 80-100 kN static roller / Vibratory Roller 80-100 kN to achieve the desired density at OMC etc., complete for finished item of work as per MoRT&H Specification 401& 408 (5th revision) and as directed by the Engineer-in-charge.

24

714

17142

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Laing of CC road from Inthala Raghu Reddy (H) to Mattela Sharadha (H) and Construction of CC drain from Kodithala Uppalamma (H) to E. Mariyamma (H) at Gharib Nagar in W.No. 16, GWMC

1

-

-

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Supply and delivery & Lowering of 450 mm dia plain ended, Lowering the RCC plain ended pipes carefully into the trench laying them true to alignment and gradient, jointing RCC pipes with cement joints including curing, the cost of jointing materials i.e., Cement Mortar (1:1.5), hemp yarn etc., and testing including filling with water with a water lead upto 500 metres as per BIS No.783/85 including conveyance etc.,complete

7.5

2340

17554.2

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Plain Cement concrete M15 (1:2.5:5) using ,20,10 mm metal with concrete mixture. Walls

68.7

5509

378508.15

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Plain Cement concrete M15 (1:2.5:5) using ,20,10 mm metal with concrete mixture

33.21

5297

175935.62

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Filling with Stone dust in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work

27.48

686

18868.32

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Carting of the Exavated earth upto a lead upto 4-5 km beyond the initial lead of 1 Km from site including loadingand unloading as per the engineer in charge

109.92

72

8002.18

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work Manual

219.84

297

65347.44

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Supply of 25 mm thick high performance expansion joint filler board confirming to IS -1838, placing the same 25mm below top of the pavement slab sealing with hot sealing compound(Grade -A, ISI ) polysulphide at 5.00mts intervals in C.C Pavement including cost and conveyance of materials, labour charges for placing in position for expansion joints conforming to MORTH Specificatio No.602

13.5

1347

18190.85

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;RBR-CCPV-5- Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 53 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including curing of concrete slabs for 14- days, and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.-for roads

92.4

6907

638216.04

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Supplying and placing of Separation Membrane of impermeable plastic sheeting 125 microns thick under pavement slab including cost and conveyance of etc., complete.

662.2

21

14296.9

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Laying of CC road and Construction of CC drain from Mulaparthy Bhagya (H) to Shivarathri Ilaiah (H) at Gharib Nagar in W.No. 16, GWMC

1

-

-

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Supply and delivery & Lowering of 450 mm dia plain ended, Lowering the RCC plain ended pipes carefully into the trench laying them true to alignment and gradient, jointing RCC pipes with cement joints including curing, the cost of jointing materials i.e., Cement Mortar (1:1.5), hemp yarn etc., and testing including filling with water with a water lead upto 500 metres as per BIS No.783/85 including conveyance etc.,complete

10

2340

23405.6

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Plain Cement concrete M15 (1:2.5:5) using ,20,10 mm metal with concrete mixture. Walls

178.06

5509

981035.81

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Plain Cement concrete M15 (1:2.5:5) using ,20,10 mm metal with concrete mixture

69.38

5297

367552.34

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Filling with Stone dust in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work

69.38

686

47637.7

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Carting of the Exavated earth upto a lead upto 4-5 km beyond the initial lead of 1 Km from site including loadingand unloading as per the engineer in charge

392.06

72

28541.97

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work Manual

477.48

297

141930.93

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Renovation of old damaged drains at internal lanes and Construction of Box Drain from Ramalayam to K. Venkat Rao (H) at Reddypalem in W.No. 15, GWMC

1

-

-

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Plain Cement concrete M15 (1:2.5:5) using ,20,10 mm metal with concrete mixture Walls

176.4

5509

971889.91

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Plain Cement concrete M15 (1:2.5:5) using ,20,10 mm metal with concrete mixture Drain , Vent Portion

119.7

5297

634131.1

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Filling with Stone dust in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work

88.2

686

60559.88

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Carting of the Exavated earth upto a lead upto 4-5 km beyond the initial lead of 1 Km from site including loadingand unloading as per the engineer in charge.

338.1

72

24613.68

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work Manual

529.2

297

157304.7

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Construction of CC drains at Gopal Reddy Nagar in W.No. 15, GWMC

1

-

-

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Making Inter connection to the existing pipe line including all labour charges etc complete 110 mm dia rate adopted vide EE GWMC I DBNo.62/23 on 30/8/2023

5

2000

10000

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Bailing out of water with 5 HP Diesel Dewatering pump Motor including cost and conveyance of all materials, all labour charges and site etc.complete

60

308

18498

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Supply and Fixing in position of MS steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows etc, including cost and conveyance of all material , labour charges for fabrication and fixing in postion etc,. Complete

200

134

26984

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Laying and Jointing of HDPE Pipe by Buily-up-Fusion Welding as per IS 7634-part -II /1975 as ammended from timeto time to the alignment and gradient and testing the pipeline to the required pressure etc complete. For 160 mm dia

1690

80

135791.5

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Manufacture, supply and delivery of HDPE 110 mm dai TEE including cost of transportation and all Labour charges etc.,complete. {SoR Page No.491, Rate 305.00 and 13.615% }

8

346

2772.24

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;150 mm dia PN 16

8

22242

177939.28

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;100 mm dia PN 16

4

14126

56507.56

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG-40/ SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per requirement of the dept

1

-

-

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Manufacture supply and Delivery of 110 MM Dia HDPE pipe PE 100 grade conforming to IS 4984-1995 including transportation to any where in Telengana sale Tax excess duty VAT and cost of specials etc complete length of 6.00 mtrs for 6 Kg/cm.sq etc complete. {Rate : 375.00, Part - IV. (Page No.488 and Add 13.615%}

1690

426

720024.5

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Earthwork in excavation for as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated including all charges etc., complete

684.45

297

203452.76

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 MORD / MORTH Bituminous Courses manual

0.84

1494

1255.77

... More
Package 1)Laying of 110 mm dia HDPE pipe line from Ex. BT Road to Ex ELSR at church, Ex.BT Road to S;Laying of 110 mm dia HDPE Pipe line from Ex-BT road to ELSR at Church, Ex-BT road to SC Colony and internal lanes of reddy Palem in W.No.15,GWMC

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.