Municipal Corporation Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Building Construction
Opening Date1 Mar 2025
Closing Date10 Mar 2025
Tender Amount₹ 10,20,191 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of balance work;S&F 25mm dia CPVC bend

8

32

256

... More
Construction of balance work;Supply, installation, testing and commissioning of 25mm dia Gate valve ELEC-10.7.37

2

1100

2200

... More
Construction of balance work;Supply of digital / polished glazed full body porcelain vitrified tiles with any type of design texture such as marble finish, wooden, samboo, stone finishes etc., scratch less, stain free and of size 800 x 800 mm and thickness between 9-11 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs TBSC-C.II-08

9

683

6147

... More
Construction of balance work;Supply of Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs TBSC-C.I-01

4.5

315

1418

... More
Construction of balance work;S&F of 15 mm brass body CP finish bib tap of not lessthan 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 TBSP-F.I-01

3

275

825

... More
Construction of balance work;4" (101.6 mm ) Nahany Trap ( Without Jali with inlet)UPVC/SWR Pipe fittings TBSP-H.II-69

2

134

268

... More
Construction of balance work;Supplying & fixing approved make Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-2004 with "P" or "S" trap: 580 mm x 440 mm TBSP-E.I-03

1

2207

2207

... More
Construction of balance work;Supply of 48" (1200mm) Sweep Ceiling Fan without Regulator.of makes Crompton / Bajaj / Orient /Usha with 5 Star rating. ELEC-5.1.9

15

2000

30000

... More
Construction of balance work;Supply and transportation of 22W +/ 10% , >/ 2300 lumens, 1200 mm (+/- 10%) length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS Certification with BIS Certification.LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix / HPL / Eveready / Surya / Keselec / Arraystorm / GM / Goldmedal / Goldwyn / Fortune Arrt / Lighting Technologies LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. ELEC-3.3.16

15

615

9225

... More
Construction of balance work;Supply of 63A DP Isolator of make L & T / Legrand / GE / Siemens / Schneider/ABB. ELEC-2.14.1

1

785

785

... More
Construction of balance work;Supply of 6-32A 10KA SP MCB ISI Mark of make Legrand / L & T / GE / Siemens / Schneider/ ABB. ELEC-2.13.1

4

325

1300

... More
Construction of balance work;Supply of 12 Modular Vertical Cover Frame of Crabtree / Feno Swtch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale. ELEC-1.3.3

3

285

855

... More
Construction of balance work;Supply of Mini Modular Stepped type Electronic Regulator with Cover Frame. ELEC-1.8.1

8

261

2088

... More
Construction of balance work;Supply of 10A 3/2 Pin Modular Socket of Crabtree / Feno Swtch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale.

8

195

1560

... More
Construction of balance work;Supply of 10A 1 Way Modular Switch of Crabtree / Feno Swtch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale. ELEC-1.9.1

25

130

3250

... More
Construction of balance work;Supply of 36/0.3mm (2.5 Sqmm) FR / FRLS PVC insulated ISI Copper cable of makes Pawancab / Star / Milltec / Fine Cab / Payal / Sunlight / Bentec / Gemscab. ELEC-1.5.3

150

26

3945

... More
Construction of balance work;Supply of 14/0.3mm (1.5 Sqmm) FR / FRLS PVC insulated 1100V for ISI Copper cable of makes Pawancab / Star / Milltec / Fine Cab / Payal / Sunlight / Bentec / Gemscab. ELEC-1.5.1

270

24

6507

... More
Construction of balance work;Supply of ISI 20mm outer dia heavy grade, FRLS with IS:9537 part 3 regid PVC pipe. Makes : Sudhakar / Goldmedal / Modi / AKG / VIP / Million Plast / Precision ELEC-1.2.1

90

35

3150

... More
Construction of balance work;Supply and fixing of MS grills including cost and coveyance of all materials labour charges etc., complete

560

142

79783

... More
Construction of balance work;S&F premium make CPVC Pipes of 22.20mm OD Pipe - SDR 13.5

30

178

5340

... More
Construction of balance work;S&F premium make CPVC Pipes of 28.60mm OD Pipe- SDR 13.5 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-incharge TBSC-J.IV-03

10

382

3820

... More
Construction of balance work;Providing and fixing of Three shutter Sliding Windows made of Galvanized Steel as per IS 513, D quality, galvanized as per IS 277 powder coated with Pure polyester powder and thickness of 0.8 mm for Outer Frame and 0.58 mm thickness for Sliding Shutter Section, with two integrated guide tracks of 12mm width and 24mm deep for provision to slide the Shutter / sash frame and facilitates with a water drain outlet component made of PVC and the shutter frame fitted with 5mm thick plain float glass of reputed make and fixed with EPDM weathering seal resistant accessories and handle made of Aluminium 1 No. per each shutter and including installation of window system at site using anchor fasteners, Silicon sealant applied at the Outer frame corners inclusive of conveyance of all materials accessories, labour charges, and erection at site with complete finished item of work for Window with 3 shutters (Centre fixed shutter / Centre sliding shutter / centre Fly mesh shutter) and without Grill Window made of Outer Frame of size 90mm x 50mm. i) Centre Shutter Fixed: centre shutter frame made of section with size 20mm x 47mm of 0.58mm thick should be fitted with 5mm thick plain float glass of reputed make, EPDM gasket all around the glass and fixed to the Outer Frame with the supporting section of size 29mm x 20mmof 0.58mm thick fixed horizontally on top and bottom of the shutter frame.

15.84

5942

94121

... More
Construction of balance work;Painting to walls with two coats of snowcem paint of superior quality of approved brand and shade over base coat of cement primer grade I making three coats in all to give even shade after throughly brushing the surface to remove all loose powdered materials includig cost and conveyance of all materials costs labour charges etc., complete for finished item of work as per APSS No. 912

78

1763

13757

... More
Construction of balance work;Providing skirting to internal walls to 15 cm height/risers of steps with 15 to 18 mm thick polished Shahabad stone /Tandur stone Slab (0.457 x0.304) or any other shade length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Shahabad stone, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work.

7.14

9642

6885

... More
Construction of balance work;Supply of digital / polished glazed full body porcelain vitrified tiles with any type of design texture such as marble finish, wooden, samboo, stone finishes etc., scratch less, stain free and of size 800 x 800 mm and thickness between 9-11 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs TBSC-C.II-08

116.2

1380

160423

... More
Construction of balance work;Flooring with 15 to 18 mm thick polished shabad stones set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

242.5

8846

214536

... More
Construction of balance work;Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponge finishing including cost and conveyance of all materials to site, Cost of seigniorage charges on all materials, all taxes, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903.) per 10 Sqm.

78

631

49294

... More
Construction of balance work;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded

256.5

65

16708

... More
Construction of balance work;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering. (350 Kgs Cement) for columns

1.22

15922

19345

... More
Construction of balance work;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering. (350 Kgs Cement) for footings

1.35

11507

15536

... More
Construction of balance work;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site Cost of Seigniorage Charges on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. (S.S. No. 504), per 1 Cum.

8.97

8541

76616

... More
Construction of balance work;Plain Cement concrete 1:4:8 prop (Cement : fine aggregate: coarse aggregate ) for foundation and under flooring bed using 40mm size (SS 5) Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , cost of seigniorage charges on all materials, all taxes, labour charges , for mixing , laying, concrete in foundation ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work as per (S.S. No. 402) per 1 Cum.

18.15

5459

99099

... More
Construction of balance work;Construction of RR Masonary in C.M (1:6) prop. Using hard granite stone including cost and conveyance of all materials like cement, sand, water, Granite stone etc. including cost of seigniorage charges on all materials, all taxes including labour for cutting stones to required size and shape, mixing of cement mortar construction, Scaffolding charges etc. complete for finished item of work.

14.04

5225

73369

... More
Construction of balance work;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

11.7

297

3482



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.