Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 8,016Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
562001Tender No
13/03/CC Road/Div No 16/2024, Dt.12.12.2024. (14th FC Fund)Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://nizamabadcorporation.telangana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Laying of CC Road in Div No 16;Plain Cement concrete (1:3:6) using 20 mm HBG graded metal machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in under bed, compacted by vibration including curing for 14 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.. RBR-FNDN-4
9.36
5304
49652.83
... More
Laying of CC Road in Div No 16;BLD-CSTN-9-2-(100) : Flooring with 50 mm thick Rough Cuddapah/ Shahbad stones, set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, charges, labour charges for dressing of flooring stones etc., complete for finished item of work,including the cost and conveyance of all materials.
23.4
744
17416.85
... More
Laying of CC Road in Div No 16;BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, Sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
5.85
4354
25473.36
... More
Laying of CC Road in Div No 16;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).
107.84
297
32055.44
... More
Laying of CC Road in Div No 16;Cutting open C.C. road surface including stacking of excavated materials including all labour charges / Dismantling of CC Ramps
3.94
2664
10490.56
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements