Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Building Construction
Opening Date25 Jan 2024
Closing Date1 Feb 2024
Tender Amount₹ 59,22,503 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Community Hall;RCC M-20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering. For Raft FoundationFor Columns

11.72

16438

192621.19

... More
Construction of Community Hall;RCC M-20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering. For Plinth Beams

11.11

15507

172368.53

... More
Construction of Community Hall;RCC M-20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering.For Roof Beams

11.11

14354

159549.38

... More
Construction of Community Hall;RCC M-20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering. For Slab ( 150mm thick)

192.8

1911

368510.21

... More
Construction of Community Hall;RCC M-20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering. For Stair case Waist Slab

1.15

12742

14679.21

... More
Construction of Community Hall;RCC M-20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering.Landing Beam

0.17

14354

2377.09

... More
Construction of Community Hall;RCC M-20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering.For Steps

1.3

12742

16514.11

... More
Construction of Community Hall;Supplying, fitting and placing of HYSD fe 500 bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded. For columns,Beams and Slab @100Kg/Cum

13734.3

70

961675.69

... More
Construction of Community Hall;Filling with Earth filling (ordinary soil) useful excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

161.35

59

9624.5

... More
Construction of Community Hall;Filling with Good Gravel soil, including supply and delivery of good gravel for filling, including cost of gravel, seinourage charges and conveyance to site, filling charges, watering, tamping and rammming and all labour charges and operational charges complete as directed by the Departmental officers.

159.5

452

72105.16

... More
Construction of Community Hall;Plain Cement Concrete (1:2:4) prop (cement : fine aggregate: Coarse aggregate) using 20mm size hard granite m/c metal including cost and conveyance of all materials like cement, sand,coarse aggregate water etc., to site seigniorage charges on all materials. and labours charges, for mixing laying concrete ramming in 15 CM layers, finishing top surface to the required level curing etc., Complete for finished item of work as per (SS .402). (Hand Mixing)

9.31

6777

63102.94

... More
Construction of Community Hall;Construction of RR Masonary in C.M (1:6) prop. Using hard granite stone including cost and conveyance of all materials like cement, sand, water, Granite stone etc. including cost of seigniorage charges on all materials, all taxes including labour for cutting stones to required size and shape, mixing of cement mortar construction, Scaffolding charges etc. complete for finished item of work.

134.16

5215

699715.73

... More
Construction of Community Hall;Brick masonry in C.M (1:6) prop. Using IInd class traditional size bricks of locally available size of 23x11x7 CM having a crushing strength of not less than 35 Kg/CM² including cost and conveyance of materials to site, seigniorage fee, mixing of cement mortar and laying of bricks and mortar to specified thickness, watering, curing, including all scaffolding, hire and operational charges of machinery, all labour charges and all water lead charges etc., complete for finished item of work. Ground Floor

31.7

8649

274231.67

... More
Construction of Community Hall;Brick masonry in C.M (1:6) prop. Using IInd class traditional size bricks of locally available size of 23x11x7 CM having a crushing strength of not less than 35 Kg/CM² including cost and conveyance of materials to site, seigniorage fee, mixing of cement mortar and laying of bricks and mortar to specified thickness, watering, curing, including all scaffolding, hire and operational charges of machinery, all labour charges and all water lead charges etc., complete for finished item of work for Compound wall

14.8

8649

128020.62

... More
Construction of Community Hall;Plastering 20mm thick to masonry walls to external side with 16mm in C.M(1:6) prop.as Ist coat and 4mm in C.M (1:4) prop. as II nd coat with dubara sponge finishing and curing etc., seignourage and all operational incidental labour charges such as scaffolding mixing mortar,curing etc.complete as per specification and drawings for finished item of work.-Ground Floor

160.12

620

99335.3

... More
Construction of Community Hall;Plastering 20mm thick to masonry walls to external side with 16mm in C.M(1:6) prop.as Ist coat and 4mm in C.M (1:4) prop. as II nd coat with dubara sponge finishing and curing etc., seignourage and all operational incidental labour charges such as scaffolding mixing mortar,curing etc.complete as per specification and drawings for finished item of work for gate columns

105.15

620

65234.01

... More
Construction of Community Hall;Plastering 12mm thick in two coats, first with 8mm thick in cement mortar (1:5) prop and second with 4mm thick in cement mortar (1:3) prop including cost and conveyance of all materials to site seignorage fee , Screening and mixing, laying finishing with sponge finish and watering, curing including all labour charges ,hire and operational charges,scaffolding etc., complete for finished item of work.

308.62

600

185275.43

... More
Construction of Community Hall;Flooring with vitrified tiles 1st quality of size -600x600, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

179.13

1326

237617.74

... More
Construction of Community Hall;Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0")) depth and refilling with watering and tamping. (TBSP-A.I-04)

25

763

19075

... More
Construction of Community Hall;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg (TBSP-B.II-02)

2

4610

9220

... More
Construction of Community Hall;Supply of glazed red or white full body ceramic tiles for external cladding purposes of any size and thickness between 7-8 mm 1st quality conforming to IS:13711,IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs (TBSC-C.I-01)Ground Floor Toilet Long Walls

35.28

357

12626.26

... More
Construction of Community Hall;Providing and fixing wall dado with cement based adhesive in specified thick and pointing with specified colour epoxy grout excluding cost of tiles (TBSC-C.IV-10) -Ground Floor Toilet Long Walls

35.28

192

6773.76

... More
Construction of Community Hall;Flooring with ceramic tiles 600 X 600 mm, thicknes 8-10 mm (non-skid), set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.Ground Floor Toilet flooring

5.76

1241

7150.18

... More
Construction of Community Hall;Painting to walls with 2 coats over a primary coat (all colours) of Snowcem or other equal and approved Water Proof Cement Paint all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls.

573.88

296

170202.81

... More
Construction of Community Hall;Painting with Synthetic Enamel paints - Two Coats - For New Iron Work

38.52

131

5047.28

... More
Construction of Community Hall;S&F ofFullyPanneled Doors double shutter of 1000x2000mm (2 Sqm) External or Internal moulded pannels SS 290 including cost of Medium Class Teak wood, wrought and putup, labour charges for making, necessaryfixtures and fittings and fixing in positon etc., complete with size Frame and size planks, 3 Nos.250mm long Aluminum tower Bolts, 6 Nos. 150mm long But Hinges Aluminum, 2 Nos. 300mm long Aluminum aldrops, 2 Nos. 150mm long Door handles of aluminum

7.19

6536

46963.53

... More
Construction of Community Hall;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 2 Track?2 Panel Sliding windows duly manufactured using UPVC reinforced profiles(Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (62 mm x 60 mm)/(60 mm x 45 mm) x 2.20 mm for outer frames, (66 mm x 38 mm)/(58 mm x 39 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work. (TBSC-M.11-09)

5.76

6818

39271.68

... More
Construction of Community Hall;Supply and placing of mild steel flats, angles, channels Isections including its all necessary fittings & fixtures etc., complete For window grills

400

127

50808

... More
Construction of Community Hall;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

161.5

667

107767.33

... More
Construction of Community Hall;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

3000

10

30000

... More
Construction of Community Hall;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 630 x 450 mm - Single C.P. Pillar cock Each (TBSP-E.VI-02 )

3

2893

8679

... More
Construction of Community Hall;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with 'S' trap ( TBSP-E.II-02 )

6

2081

12486

... More
Construction of Community Hall;Supply & fixing of PVC low level system with internal components & short bend: 10 Litres capacity Single Flush (TBSP-H.II07)

6

1740

10440

... More
Construction of Community Hall;S&F premium make CPVC Pipes of 15.90mm OD Pipe - SDR 13.5 ( TBSP-J.III-01 )

390

155

60450

... More
Construction of Community Hall;S&F premium make CPVC Pipes of 22.20mm OD Pipe - SDR 13.5 ( TBSP-J.III-02 )

252

178

44856

... More
Construction of Community Hall;S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 13.5 ( TBSP-J.III-03 )

336

235

78960

... More
Construction of Community Hall;Supply of 20mm PPR Socket conforming to DIN Standards 8077/8084 TBSP-J.III-40

39

13

507

... More
Construction of Community Hall;Supply of 25mm PPR Socket conforming to DIN Standards 8077/8084

24

18

432

... More
Construction of Community Hall;Supply of 32mm PPR Socket conforming to DIN Standards 8077/8084

18

23

414

... More
Construction of Community Hall;Supply of 20mm PPR Elbow conforming to DIN Standards 8077/8084(TBSP-J.III- 56)

30

21

630

... More
Construction of Community Hall;Supply of 25mm PPR Elbow conforming to DIN Standards 8077/8084(TBSP-J.III- 57)

24

24

576

... More
Construction of Community Hall;Supply of 32mm PPR Elbow conforming to DIN Standards 8077/8084(TBSP-J.III- 58)

24

47

1128

... More
Construction of Community Hall;Supply of 20mm PPR Tee conforming to DINStandards8077/8084(TBSP-J.III- 65)

36

19

684

... More
Construction of Community Hall;Supply of 25mm PPR Tee conforming to DINStandards8077/8084

30

33

990

... More
Construction of Community Hall;Supply of 32mm PPR Tee conforming to DINStandards8077/8084

30

56

1680

... More
Construction of Community Hall;110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm(TBSP-H.I03)

24

569

13656

... More
Construction of Community Hall;75 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm(TBSP-H.I01 )

36

301

10836

... More
Construction of Community Hall;S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931(TBSP-F.IV07)

12

669

8028

... More
Construction of Community Hall;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 8931. SSR- TBSP-F.I-02

12

657

7884

... More
Construction of Community Hall;S&F of 15 mm brass body Premium variety Chromium plated finish Swan neck tap with right/left hand operating knob with aerator of not less than 500 grams weight quarter turn spindle conforming to IS 8931 and with a warranty of 10 years(TBSP-F.III03)

6

1756

10536

... More
Construction of Community Hall;Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 590 x 375 x 390 mm(TBSP-E.VII03)

3

3947

11841

... More
Construction of Community Hall;Supplying and Fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS2548-1996(TBSP-E.V01)

3

1280

3840

... More
Construction of Community Hall;Supply and Transportation of 1.00 HP (25x25mm). Single phase ISI Mono block CI body motor pumpset Makes: Texmo / CRI / KSB / Aryan Varsha / Lubi(ELEC-5.9.3)

1

12519

12519

... More
Construction of Community Hall;Supply of ISI 25mm outer dia medium grade with IS:9537 part 3 rrgid PVC pipe of makes Sudhakar(ELEC-1.2.2)

750

31

23250

... More
Construction of Community Hall;Supply of ISI 20mm outer dia medium grade with IS:9537 part 3 regid PVC pipe of makes Sudhakar(ELEC-1.2.1)

480

23

11040

... More
Construction of Community Hall;Supply of PVC Junction Boxes Deep size 25mm(ELEC-1.2.7)

24

33

792

... More
Construction of Community Hall;Supply of 1 or 2 Module box(ELEC-1.3.1)

9

71

639

... More
Construction of Community Hall;Supply of 3 Module box(ELEC-1.3.1)

18

101

1818

... More
Construction of Community Hall;Supply of 4 Module box(ELEC-1.3.1)

24

120

2880

... More
Construction of Community Hall;Supply of 6 Module box(ELEC-1.3.1)

6

164

984

... More
Construction of Community Hall;Supply of 8 or 9 Module box Horizontal/Vertical(ELEC-1.3.1)

12

213

2556

... More
Construction of Community Hall;Supply of 12 Module box vertical.

6

258

1548

... More
Construction of Community Hall;Supply of Decolam Board of Size 4" x 4"(ELEC-1.4.2)

30

16

480

... More
Construction of Community Hall;Supply of Decolam Board of Size 4" x 7"(ELEC-1.4.2)

30

27

810

... More
Construction of Community Hall;Supply of Decolam Board of Size 6" x 6"(ELEC-1.4.2)

18

37

666

... More
Construction of Community Hall;Supply of PVC insulated 2 core 1.5 Sqmm sheathed flexible copper cable for voltage up to 1100V as per IS 694/1990 of makes Finolex / RR Kable / KEI.(ELEC-1.5.6)

600

59

35400

... More
Construction of Community Hall;Supply of 6A 1 Way flush type Swich of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega(ELEC-1.7.1)

56

20

1120

... More
Construction of Community Hall;Supply of 16A flush type Socket with shutter of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega(ELEC-1.7.1i)

36

72

2592

... More
Construction of Community Hall;Supply of 16A Triangle Plug Top of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega(k)

36

56

2016

... More
Construction of Community Hall;Supply of 16A flush type Swich of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega(ELEC-1.7.1 h)

9

72

648

... More
Construction of Community Hall;Supply of stepped type Electronic Regulator of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega(ELEC-1.7.1 l)

16

242

3872

... More
Construction of Community Hall;Supply of 3 Plate Jumbo Ceiling Rose of makes Anchor / Gold Medal Olive / Million Zoom.(ELEC-1.7.1 m)

16

23

368

... More
Construction of Community Hall;Supply of Pendent Holder / Adopter of makes Anchor / Gold Medal Olive / Million Zoom

24

20

480

... More
Construction of Community Hall;Supply of 63A FP Isolator.Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora / Cabtree / Indo Asian / BCH .(ELEC-2.15.1) (g)

3

1369

4107

... More
Construction of Community Hall;Supply and transportation of 20W +/-10%, >/ 2000 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc complete with 5 years warranty with BIS Certification.LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec/ FIEM / Arraystorm / GM / Goldmedal - 0 ELEC-3.5.10

8

560

4480

... More
Construction of Community Hall;Supply of 48" (1200mm) 5 star rated Sweep Ceiling Fan with all accessories etc., complete. Makes : Crompton High Speed Decora / Havells Spark Deco / Orient Summer Crown / Panasonic Sprint Deco / Halonix Erbon Energy Star. (ELEC- 5.1.1)

6

3084

18504

... More
Construction of Community Hall;S& F 50 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete TBSP-G.I-12

30

547

16410



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.