Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GWMC Tender

Works
Civil And Construction
Building Construction
Opening Date17 Oct 2024
Closing Date2 Nov 2024
Tender Amount₹ 1,15,56,354 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply and run of 2 of 14/0.3mm (1.0 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete

100

42

4274

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply and transportation of 20W +/-10%,1900 lumens, 1200mm length LED retro tubelight, housing made with aluminum anodisedbody, wide operating voltage, double sideconnection, with PF=0.9, Surge protection: >2KV, THD<10%, with inbuilt driver and frostedcover CCT: 3000K - 6500K as desired by the department and as per IS specifications,minimum CRI=80,.etc.complete with 5 yearswarranty.LUMINAIRE MAKE: Fortune Arrt / Capart /Kashyap BLU / Million / Trinic / Sieger / Stanjo/ Promptec / Lighting Technologies / Renesola /C&S / Luker / RR Electric / Rhino

30

647

19428.17

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply, Transportation of energy efficient decorative fan, 1200 mm sweep, luminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMM/W) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%, remote or compatible to lectronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise = 75 degree C (max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., complete. 1 No 3000.00Makes : Atomberg (Efficio + ) / Havells / Orient /RR / Halonix

20

3749

74985.9

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

100

548

54847

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply and Fixing of 20mm dia 1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete

210

80

16968

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete

300

98

29595

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

154.8

76

11783.38

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal angles horizontal supports at 0.50m c/c, 2.00mm MS sheet at bottom 0.30m height and 16mm MS square bars Vertically at 100mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and including cost and conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work. for 3.00m & above 3m span gates

200

134

26984

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Interior Gr- 1 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work

8.4

99

831.94

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr 2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work

116.05

93

10861.12

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903)

116.41

231

26924.32

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Using Concrete mixture up to Plinth Level: Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement

2.28

6264

14272.85

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Brick Masonry 2nd Class Ground moulded or traditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

12.8

8544

109357.89

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Construction of Coursed Rubble Stone Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work

9.72

5519

53649.7

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work

17.28

5016

86682.17

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply and Placing of M20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted

0.73

13997

10288.15

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply and placing of M20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted

1.01

10020

10100.81

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Using Concrete mixture all works up to Plinth Level: Plain Cement concrete M10 using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed

0.65

5564

3599.06

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

29.77

297

8849.13

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

6.46

646

4176.23

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Manufacture,supply and delivery and Fixing of encapsulated plastic steps including cost of materials packing ,loading, transportation, unloading and stacking at site of work etc, complete. Pg-50 of PH SoR- 2024-25

6

221

1329.24

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

894

76

68051.28

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames anywhere in TS., F.O.R. destination including, loading, un-loading & stacking at site as applicable Pg-517,table 28.c of PH SoR- 2023-24

2

2257

4515.06

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.

18.9

220

4174.82

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply and placing of M20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering with steel scaffolding, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for RCC SLABS, BEAMS. Note : 1) The cement content is adopted as 400Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 400 Kgs/ Cum the difference in cost shall be deducted

4.2

1721

7230.73

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site cluding all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for

3.78

6094

23035.89

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;R.C.C grade M 20 using Concrete mixer (Nominal Mix) using 20 mm & 10 mm Graded Metal (MORD) Raft

1.5

5859

8789.64

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Using Concrete mixture all works up to Plinth Level: Plain Cement concrete M10 using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed

1.5

5422

8134.07

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Earth work excavation in ordinary rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

2.5

921

2303.29

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

22.5

297

6688.12

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Erection charges for electric motor

1

3000

3000

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;supply and delivery of 1.5 Sq.mm Copprer cable

70

57

3990

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;supply and delivery of GI bends incuding all labour charges etc., complete

4

550

2200

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;supply and delivery of Non return valve incuding all labour charges etc., complete

1

2500

2500

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;supply and delivery of support rope incuding all labour charges etc., complete

10

250

2500

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;supply and delivery of Clamp Set incuding cost and conveyance of all materials to site and all labour charges etc., complete

1

350

350

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;supply and delivery of 32 mm Dia SS neppal incuding all labour charges etc., complete

2

250

500

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;supply and delivery of 32 mm Dia HDPE pipe incuding cost and conveyance of all materials to site and all labour charges etc., complete

60

95

5700

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Manufacturing supply delivery and fixing of Panel Box incuding cost and conveyance of all materials to site and all labour charges etc., complete

1

6500

6500

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Manufacturing supply and delivery of 1HP submerisible Pumpset incuding cost and conveyance of all materials to site and all labour charges etc., complete

1

25102

25102.1

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Manufacture supply and Delivery of PVC casing pipe suitable for 180mm dia borewell conforming to is 49 85/89 to withstand 6 kg /cm square pressure transportation etc complete

30

649

19470

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Drilling of 6 1/2" Dia borewell with power drill D tuhunder a sustained presurre of 100psi in all soils including lowering of casing pipe etc complete

60

475

28500

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

2000

11

22720

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply,fixing and testing of PVC SWR 4 KG/Sq.cm on wall surface pipe with necessary special like shoe and bends including providing holder clamps etc., complete as required by the engineer-in-charge for Rain Water Down Comer pipes - 110mm Dia

60

368

22086.76

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part- 1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification

10

9870

98708.71

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supplying and fixing of AC cowls of approved make of 88.9 mm dia complete etc

10

89

897.56

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Boxing of Nahany traps in RCC floors including cost and conveyance of all material like Bricks, Cement, Sand etc., to site, all labour charges, , etc., complete

18

318

5726.2

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply and fixing of PVC Nahani trap 1st quality ISI marked conforming to IS:1729-1979 with C.P grating fixing with white cement as per site requirements with standard practice for 100mm dia inlet - 75mm (3") out let pippe 4kgs make with aluminium grating in cement concrete including cost and conveyance of all material to site, all labour charges, , etc., complete

18

138

2494.99

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;75 mm dia - Door Bend

43

92

3957.21

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;110 mm dia - Door Bend

35

145

5089.95

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Sanitary PVC Fittings - 87.5 Degree Door Bends

1

-

-

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;110 mm dia 3 M Single Socket PVC/SWR pipe

90

383

34531.01

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;75 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm

120

192

23132.4

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply and fixing PVC pipes of confirming to IS Standareds with fittigs, including , offsets, doorbends, junctions, cowls, etc., laid on walls with necessary clamps, including wall bores & rendering the same in cement morter etc., and complete

1

-

-

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;50mm Dia

4

1934

7739.44

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;25mm Dia

6

529

3176.76

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;S&F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type, the following valves with SS Ball and SS Spindle of approved brand of manufacature,having rubber lining, including companion flanges, unions, bolts, nuts,rubber gasket , ctc., complete for finished item of work

1

-

-

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;54 mm Dia

100

1361

136100

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;28.60 mm Dia

35

382

13370

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;22.20 mm Dia

51

303

15453

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;15.90 mm Dia

51

229

11679

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supplying,laying,jointing and testing of medium quality CPVC pipes with specials such as tees, elbows, checknuts, reducing tees etc., including threading,cutting and fixing in wall ceiling, floors, etc., The rate shall include the rate for necessary excavation in trenches, chasing the walls etc., refilling, consoldation with the excavated earth and making bores in foundation, walls, ceiling etc., and making good of the chased surface in cement mortor including etc.,complete for finished item of work

1

-

-

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal /external threaded connection conforming to IS 8931,including cost and conveyance of all materials and labour charges complete for finished item of work

17

312

5311.5

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;S&F of 15 mm CP finish brass stop valve of not less than 400 grams weight quarter turn spindle with internal threaded conforming to IS 8931 with 7 years warranty: including cost and conveyance of all materials to the site, all labour charges, etc., complete for finished item of work and as directed by the Engineer/ In-Charge

17

986

16765.03

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock

10

2658

26585.91

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 590 x 375 x 390 mm (Parry/Nicer) including Waste Plug, 32mm dia PVC waste pipe etc, complete for finished item

1

4498

4498.02

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supplying and Fixing best Indian make soft plastic closing seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 equivalent from approved manufacturers with all internal components, necessary length of pipe with all accessories including etc., complete for finished item of work

7

1945

13615.62

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supplying & fixing of white European type W.C pan 570mm x 340mm x 400mm of approved colour of parryware/Nycer/Hindware of approved make P trap etc., and heay duty PVC seat and cover of matching colour owith desired shade etc., complete

7

2130

14914.2

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat complete for finished item of work as per Idia Gypsum Ltd specification.

150

887

133099.5

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Providing and applying wall putty of white cement or polymer or cement based of avvg 1 to 2mm thickness over plastered surface to prepare the surface even and smooth after throughly brushing the surface to remove all dirt and and remains of loose powdered materiels applying emery paper sand the surface clean wipe off loose dust applying knifing paste filer by putty knife /muslin pad air dry for 2 to 3 hrs etc complete

253.32

284

72158.2

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply and fixing of partitions made of seccolor pre-painted steel (base steel as per IS 513 of 0.58 mm thick ?D? quality, galvanized as per IS 277 with Zinc of 120 GSM). Primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick alkyd backer. Section for outer frame should be 46x52mm, section for shutter should be 46x46mm, section for mullion should be 46x70mm, section for beading should be 18x25mm and section for middle and bottom rail (Lock Rail and Kick Rail) of size should be 23x130mm. The partition should be paneled with 9mm pre-laminated particle board to a height of 0.91m from the bottom, and remaining height with 5mm thick plain glass With Ethyl Propylene Diametermine Monomer (EPDM) Gaskets. The sections are to be cut to length; mitre joined with corner bracket Centre mullions are to be fixed using mullion cap. Gaskets made of Ethyl Propylene Diametermine Monomer (EPDM). Corner brackets made of CRCA with zinc phosphate. Mullion caps made of Glass filled nylon. The above frames should be fixed to the concrete/masonry wall by means of self expanding screws, and complete for finished item of work Fixed Partition with Door: Outer frame section size of 46x52mm, mullion section should be of 46x70mm, fixed beading should be of 18x25mm, section for shutter should be of 46x46mm and section for middle & bottom should be of size 23x130mm

139.44

6188

862939.65

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, , including conveyance charges of materials and all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

168.55

696

117341.43

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;BLD-CSTN-9-6-(104) : Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7 8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and design, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand water and tiles etc., complete for finished item of work.

15.97

997

15918.41

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;BLD-CSTN-9-18-(116) see Ref:9-23-(121-b): Dadooing to walls with glazed red or white full body ceramic wall tiles of size 200 x 300 / 245 x 325 mm and thickness between 6 mm 1st quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM(1:3) Prop. 12mm thick and neat Gray cement slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One Square Meter and jointed wiyh neat White cement paste mixed with pigmant of matching shade including cost and conveyance of all materials like cement, sand, water, flooring Tiles etc. to site, all operational, incidental and labour charges such as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.

59.29

603

35775.5

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Providing skirting to internal walls to 15 cm height/risers of steps with 8 mm thick mirror polished granite tiles length equal to flooringstones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles,cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, (BLD-CSTN-9-21)

7.52

603

4535.29

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;BLD-CSTN-9-20 - (118) : Providing skirting to internal walls to 15 cm height/risers of steps with soluble salt porcelain vitrified tiles screen printed and polised length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete etc., complete for finished item of work,

7.09

722

5120.84

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Flooring with high polished granite 16 to 18 mm thick slabs other than black set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete, including labour charges for dressing of tiles etc., complete for finished item of work, including the cost of conveyance of all materials BLD-CSTN-9-7 (105)

64.95

5304

344488.98

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Plastic Emulsion paints - Two Coats with Supply of acrylic emulsion paint weather proof water-based, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/Lit.

84.26

152

12866.62

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;BLD-CSTN-12-17-9 7 Amendment: Painting to new internal walls with 2 coats of Acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over existing base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912.

730.11

228

167136.78

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;BLD-CSTN-12-3-(170) & amendment; Painting to walls with two coats of acrylic emulsion paint exterior grade having VOC (Volatile Organic Compound) content less than 50 grams/ liter and shade over existing base coat of water based primer of exterior grade-2 of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls.

431.11

136

58863.76

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Interior Gr-1 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

730.11

99

72310.09

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work

431.11

93

40347.58

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Manufacturing, supply and errection of Stainless steel hand rails using 60.30mm dia, 2.90mm thick Mirror polished Seamless tubes with top horizontal rails and verticals posts of 33.7 mm dia 2.66 mm thick spaced not more than 0.6 m as directed by departmental officers, including fabrication buffing, polishing, lacquer finishing, welding with stainless steel welding rods and transportation to site, fixing with 100mm dia 8mm thick SS base plate including cost and conveyance of all materials, SS welding rods, fabrication charges, and labour charges for fixing in position and all other incidental and operational charges etc., complete for finished item of work

61

813

49610.69

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;CEILING PLASTERING Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing. For ceiling Head Room

20.16

514

10374.25

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;CEILING PLASTERING Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing. For ceiling

162.73

503

81882.11

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). 1st floor

547.19

246

135113.08

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;External Plastering- Head room

261.7

340

89228.96

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;External Plastering- First Floor

169.41

340

57760.33

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls)

1

-

-

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, but including conveyance charges of materials

86.21

1067

91991.83

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Head Room

23.15

8748

202574.8

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;First Floor

45.83

8691

398346.49

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Brick Masonry 2nd Class Ground moulded or traditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work.

1

-

-

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Head Room

1676.4

77

130490.98

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;First Floor

4513.6

76

343575.23

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

1

-

-

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;150mm thick Stair case waist slab

18.83

1845

34749.68

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Roof slabs of 125 mm thick - Headroom at 11.25m

24.74

1716

42457.58

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Roof slabs of 125 mm thick - First floor at 7.50m

168.55

1670

281599.89

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;For Roof Beams -Headroom floor

10.07

14420

145211.62

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;For Roof Beams -First floor

13.55

14020

189994.79

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply and placing of M20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for RCC SLABS, BEAMS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.For RCC SLAB, BEAMS.

1

-

-

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;For Lintels

0.04

14950

598.01

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;For Lintels

1.16

14612

16950.91

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;For Columns -Headroom

2.19

14904

32640.99

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;For Columns - First Floor

8.37

14429

120776.17

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply and Placing of M20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.

1

-

-

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supplying and fixing aluminium composite cladding with skin material 0.5 mm thick aluminium sheet cover material natural polyethylene aluminium cladding panel fixedwith extruded aluminium basis frame (50x25x1.5mm) angle cleats, weather sealants, rivets, GI brackets all as approved, using suitable bolts on structural steel work luding necessary accessories complete in all respects including all labour charges etc., complete for finished item of work but excluding cost of structural steel abrication, scaffolding charges, if any, ACP Cladding - 4 mm thick

97.9

3885

380431.02

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat complete for finished item of work as per Idia Gypsum Ltd specification.

150

887

133099.5

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Providing and applying wall putty of white cement or polymer or cement based of avvg 1 to 2mm thickness over plastered surface to prepare the surface even and smooth after throughly brushing the surface to remove all dirt and and remains of loose powdered materiels applying emery paper sand the surface clean wipe off loose dust applying knifing paste filer by putty knife /muslin pad air dry for 2 to 3 hrs etc complete

253.32

284

72158.2

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply and fixing of partitions made of seccolor pre-painted steel (base steel as per IS 513 of 0.58 mm thick ?D? quality, galvanized as per IS 277 with Zinc of 120 GSM). Primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick alkyd backer. Section for outer frame should be 46x52mm, section for shutter should be 46x46mm, section for mullion should be 46x70mm, section for beading should be 18x25mm and section for middle and bottom rail (Lock Rail and Kick Rail) of size should be 23x130mm. The partition should be paneled with 9mm pre-laminated particle board to a height of 0.91m from the bottom, and remaining height with 5mm thick plain glass With Ethyl Propylene Diametermine Monomer (EPDM) Gaskets. The sections are to be cut to length; mitre joined with corner bracket Centre mullions are to be fixed using mullion cap. Gaskets made of Ethyl Propylene Diametermine Monomer (EPDM). Corner brackets made of CRCA with zinc phosphate. Mullion caps made of Glass filled nylon. The above frames should be fixed to the concrete/masonry wall by means of self expanding screws, and complete for finished item of work Fixed Partition with Door: Outer frame section size of 46x52mm, mullion section should be of 46x70mm, fixed beading should be of 18x25mm, section for shutter should be of 46x46mm and section for middle & bottom should be of size 23x130mm

139.44

6188

862939.65

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7 8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and design, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand water and tiles etc., complete for finished item of work

18.81

997

18755.07

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Providing skirting to internal walls to 15 cm height/risers of steps with Supply of glazed red or white full body ceramic wall tiles of size 200 x 300 mm / 245 mm x 325 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs of any colour and finish in all shades and design set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including etc., complete for finished item of work

71.09

603

42894.15

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Providing skirting/Dadooing to internal walls with Supply of glazed red or white full body ceramicwall tiles of size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs of any colour and finish in all shades and design set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including etc., complete for finished item of work item of work

5.32

722

3844.6

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Providing skirting to internal walls to 15 cm height/risers of steps with Supply of glazed red or white full body ceramic wall tiles of size 200 x 300 mm / 245 mm x 325 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs of any colour and finish in all shades and design set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including etc., complete for finished item of work

9.35

603

5641.6

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Flooring with high polished granite 16 to 18 mm thick slabs other than black set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete, including labour charges for dressing of tiles etc., complete for finished item of work, including the cost of conveyance of all materials

126.17

5304

669217.04

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Flooring with soluble salt porcelain vitrified tiles screen printed and polised of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete for finished item of work, including the cost and conveyance of all materials

53.61

1160

62229.42

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Plastic Emulsion paints - Two Coats with Supply of acrylic emulsion paint weather proof water-based, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/Lit

663.72

152

101350.04

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Interior Gr-1 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work

663.72

99

65734.83

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work

167.14

93

15642.63

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Providing flush Cement Pointing to CRS Masonary in Cement Mortor (1:3) Prop . for including cost & conveyance of all materials to site, labour charges on all materials, curing etc., Complete for finished item of work

31.12

119

3732.74

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply, fabrication and fixing in position of Stainless Steel including cost and conveyance of all material and all labour chages etc complete

200

813

162658

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;CEILING PLASTERING Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing. For ceiling (for Ceiling)

166.6

500

83414.95

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work. (For Internal walls)

497.11

220

109806.63

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls)

169.14

593

100377.82

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, but including conveyance charges of materials

58.65

1067

62584.83

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Brick Masonry 2nd Class Ground moulded or traditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

62.12

8544

530810.43

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Filling with Gravel with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and rolling with hand roller including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work

205.36

419

86161.49

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors

8914.4

76

678564.13

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;150mm thick Stair case waist slab

18.83

1721

32430.66

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Roof slabs of 125 mm thick - Ground Floor at 3.75m

195.68

1547

302836.32

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Roof beams

13.55

13657

185083.22

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for RCC SLABS, BEAMS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.For RCC SLAB, BEAMS.

1

-

-

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code forColumns . Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted For Lintels

1.14

13504

15438.1

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code forColumns . Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted For Columns Below Plinth Beam

12.3

13997

172169

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Plinth Beams

11.38

13333

151685.11

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Pedastals

4.25

10788

45878.86

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Footings

31.32

10020

313881.52

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted

1

-

-

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work

20.32

4903

99656.48

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Using Concrete mixture all works up to Plinth Level: Plain Cement concrete M10 using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed

39.92

5422

216474.58

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Earth work excavation in Ordinary Soil by Mechcanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

166.59

105

17617.48

... More
Construction of Urban Primary Health Center (UPHC) at Rangashaipet, Warangal under XV FC Health Gran;Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

55.53

297

16506.29



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.