Municipal Corporation Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Agriculture or Forestry Works
Opening Date25 Feb 2025
Closing Soon3 Mar 2025
Tender Amount₹ 12,31,600
Costs
EMD
₹ 30,790Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
578050Tender No
539/UB/2024-25Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Development of Park;Cost of good quality korean / mexican/shade carpet grass turf of 2'X1' or 2'X2' size duly rolled and of atleast once moved, with grass blades not more than 1 cm. height, without pumps and tufts, uniform in colour and texture, devoid of weeds, to be delivered at twin cities (300 x 10.76 = 3228 )
3228
10
33894
... More
Development of Park;Tools and implement & Hose pipes
1
10000
10000
... More
Development of Park;Maintenance of Individual shrubs: i) Trimming of shrubs once in 15 days ii) Watering to shrubs once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously) iii) Formation of basins for each and every plant upto 1 ft away from the plant iv) Application of fertilizers, insecticides, fungicides etc. a) with manual watering (for 12 months)
500
612
36756.6
... More
Development of Park;Maintenance of hedge/ shrub planting 1) Trimming of hedges once in 15 days 2) Watering hedges/shrubs once in a day @ 5 Ltrs per plant/per day ( Sub soil moisture shall be maintained continuously) 3) Formation of basins 1 feet away from the hedge. 4) Application of fertilizers, insecticides, fungicide for one year one labour daily must be present at the site and carry the necessary operations. It is responsible of the contractor to get the work done by the labou
400
2930
140677.92
... More
Development of Park;Maintenance of Lawns: Watering the lawns @ 10-15 ltr/Sqm/day basing on the season and weather conditions (Sub Soil moisture shall be maintained continuously) ii) Lawn moving and edging of the lawn in edging of the lawns in the following frequency, keeping the lawn grass blade not more than 2 cm 1) June to Nov - Once in 15 days. 2) Dec to May - Once in 30 days. 3) edging the lawns in such a way that the lawn grass do penetrate into the plants and in a defined perfect geometric shapes or smooth curves. 4) Keeping the lawns always in lush green & weed free condition. 5) Application of fertilizers, insecticides, fungicide etc., with manual watering for (12) months
300
924
33267.96
... More
Development of Park;Digging the pit of size 0.30x0.30x0.30 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
500
129
64895
... More
Development of Park;Hedge / shrub planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
400
756
302596
... More
Development of Park;Carpet grass laying and ramming
300
58
17430
... More
Development of Park;Bed preparation : Dressing the surface to the desired shape, laying 6" layer of fine red soil, covered with a thin layer of sand watering, rolling with hand roller (4" thickness after rolling), including the cost of red earth, sand and labour charges etc. complete but excluding the cost of fertilizers, chemicals and grass.
300
333
100125
... More
Development of Park;Supply & stacking of gravel at site to the department gauge for premeasurements and it shall be composed of wellgraded coars silicious grains sharp & gritty to touch and free from dirt & other deleterious matter. Further it shall not contain lumps larger, Internal transportation of Gravel and Application of Gravel including spreading . (pathway= 300*0.15= 45 cmt , Lawn =300*0.3=90 cmt, Total= 135 cmt
135
432
58392.9
... More
Development of Park;Cast AAC kerbs pathway supply and fixing of AAC kerbs including cost and conveyence to site and labour charges complete etc,.
600
225
135000
... More
Development of Park;Carting of debris including excavation, loading, unloading and transport upto a lead of 10 km. Complete (1400*0.30= 420 cmt )
420
174
73416
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%