Municipal Corporation Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Agriculture or Forestry Works
Opening Date21 Feb 2025
Closing Date28 Feb 2025
Tender Amount₹ 11,85,700
Costs
EMD
₹ 29,643Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
576959Tender No
1158/UB/2024-25Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Development of Park;Un Skilled Watch and ward of the park protection for (6) months incluing ESI and EPF (Basic-12398/- , EPF-1612/-, ESI-403/-=14413/-)
1
14413
86478
... More
Development of Park;Cost of good quality korean / mexican/shade carpet grass turf of 2'X1' or 2'X2' size duly rolled and of atleast once moved, with grass blades not more than 1 cm. height, without pumps and tufts, uniform in colour and texture, devoid of weeds, to be delivered at twin cities (250 x 10.76 = 2690 )
2690
10
28245
... More
Development of Park;Tools and implement & Hose pipes
-
-
5000
... More
Development of Park;Maintenance of Individual shrubs: i) Trimming of shrubs once in 15 days ii) Watering to shrubs once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously) iii) Formation of basins for each and every plant upto 1 ft away from the plant iv) Application of fertilizers, insecticides, fungicides etc. a) with manual watering (for 6 months)
150
612
5513.49
... More
Development of Park;Maintenance of hedge/ shrub planting 1) Trimming of hedges once in 15 days 2) Watering hedges/shrubs once in a day @ 5 Ltrs per plant/per day ( Sub soil moisture shall be maintained continuously) 3) Formation of basins 1 feet away from the hedge. 4) Application of fertilizers, insecticides, fungicide for (6) months one labour daily must be present at the site and carry the necessary operations. It is responsible of the contractor to get the work done by the labou
200
2930
35169.48
... More
Development of Park;Maintenance of Lawns: Watering the lawns @ 10-15 ltr/Sqm/day basing on the season and weather conditions (Sub Soil moisture shall be maintained continuously) ii) Lawn moving and edging of the lawn in edging of the lawns in the following frequency, keeping the lawn grass blade not more than 2 cm 1) June to Nov - Once in 15 days. 2) Dec to May - Once in 30 days. 3) edging the lawns in such a way that the lawn grass do penetrate into the plants and in a defined perfect geometric shapes or smooth curves. 4) Keeping the lawns always in lush green & weed free condition. 5) Application of fertilizers, insecticides, fungicide etc., with manual watering for (6) months
350
924
19406.31
... More
Development of Park;Digging the pit of size 0.30x0.30x0.30 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
150
129
19468.5
... More
Development of Park;Hedge / shrub planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
200
756
151298
... More
Development of Park;Laying of Shabad Stone pathway with grass including the cost of all required materials, loading and unloading etc,. Complete.
100
743
74342
... More
Development of Park;Carpet grass laying and ramming
250
58
14525
... More
Development of Park;Bed preparation : Dressing the surface to the desired shape, laying 6" layer of fine red soil, covered with a thin layer of sand watering, rolling with hand roller (4" thickness after rolling), including the cost of red earth, sand and labour charges etc. complete but excluding the cost of fertilizers, chemicals and grass.
250
333
83437.5
... More
Development of Park;Supply & stacking of gravel at site to the department gauge for premeasurements and it shall be composed of wellgraded coars silicious grains sharp & gritty to touch and free from dirt & other deleterious matter. Further it shall not contain lumps larger, Internal transportation of Gravel and Application of Gravel including spreading . (800*0.30= 240 cmt )
240
432
103809.6
... More
Development of Park;Cast AAC kerbs pathway supply and fixing of AAC kerbs including cost and conveyence to site and labour charges complete etc,.
150
225
33750
... More
Development of Park;Carting of debris including excavation, loading, unloading and transport upto a lead of 10 km. Complete (1000*0.30= 300 cmt )
300
174
52440
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%