Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Drainage Work
Opening Date23 Dec 2024
Closing Soon30 Dec 2024
Tender Amount₹ 6,23,504 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
NP3 pipe drain;Supply and placing of the Ready Mix Concrete (RMC) M20 grade Standard Design Mix Concretegrade as per IS4926- 2003 with minimum cement content as per IScode456- 2000 using 20mm graded metal, from standard suppliers approved by the department including pumping, laying concrete, centering, shuttering vibrating / screed / pan vibrating, curing etc. complete but excluding cost of steel and its fabrication charges, for finished item of work. (M20-300Kgs) {50% natural river sand + 50% rock sand}

13.82

4827

66712

... More
NP3 pipe drain;Supplying, fitting and placing HYSD Fe 500 Grade steel for RCC works complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, including cost of all materail like HYSD bars, binding wire, chairs, space bars and all labour charges for cutting, bending, placing position, shifting to site, tying etc.. complete where they are not welded

1036.5

62

64304

... More
NP3 pipe drain;Supply and placing of the Ready Mix Concrete (RMC) M30 grade Standard Design Mix Concretegrade as per IS4926- 2003 with minimum cement content as per IScode456- 2000 using 20mm graded metal, from standard suppliers approved by the department including pumping, laying concrete, centering, shuttering vibrating / screed / pan vibrating, curing etc. complete but excluding cost of steel and its fabrication charges, for finished item of work. (M30-350 Kgs) {50% natural river sand + 50% rock sand}

16.88

5094

86003

... More
NP3 pipe drain;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH. (with out paver finisher)

11.25

1986

22353

... More
NP3 pipe drain;Filling with useful available excavated earth (excluding rock) sand/gravel/ stone dust/ chips in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. But excluding cost and conveyance of material. (APSS NO. 309 & 310) Earth/ Sand/ gravel filling (ordinary soil)

37.5

41

1560

... More
NP3 pipe drain;Lowering the RCC S/S for NP3 pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985 For 450 mm dia

50

292

14614

... More
NP3 pipe drain;Lowering the RCC S/S for NP3 pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985 For 600 mm dia

25

388

9710

... More
NP3 pipe drain;Manufacture, Supply and Delivery of RCC NP3 Socket and spigot pipes confirming to BIS 458/2003 including cost and conveyance of all materials For 450 mm dia (SSR item) (10km lead)

50

2319

115978

... More
NP3 pipe drain;Manufacture, Supply and Delivery of RCC NP3 Socket and spigot pipes confirming to BIS 458/2003 including cost and conveyance of all materials For 600 mm dia (SSR item) (10km lead)

25

3712

92806

... More
NP3 pipe drain;Supply and filling with Stone crusher Dust finer than 3mm with not more than 10% passing 0.075 sieve (exluding rock) in trenches sides of foundations and basement with intial lead inlayers not exceeding 15 cms thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges hire charges of T & P etc., coplete for finished tiem of work

11.25

1108

12473

... More
NP3 pipe drain;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m depth

56.25

418

23546

... More
NP3 pipe drain;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth

56.25

293

16482

... More
NP3 pipe drain;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH (cement concrete)

33.75

885

29886



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.