For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Civil And Construction
Water Storage And Supply
Opening Date25 Oct 2024
Closing Date2 Nov 2024
Tender Amount₹ 12,23,419
Costs
EMD
₹ 12,234Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
553612Tender No
NIT No. 28/EE/Div-16/GHMC/ 2024 dt: 24-10-2024 Item No.05Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
water stagnation;Supply and fixing of RCC covers including cost and cnveyance of all material s labour charges etc complete
17
3036
51612
water stagnation;Filling with useful available excavated earth (excluding rock) sand/gravel/ stone dust/ chips in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. But excluding cost and conveyance of material. (APSS NO. 309 & 310) Earth/ Sand/ gravel filling (ordinary soil)
209.75
41
8724
water stagnation;Lowering the RCC S/S for NP3 pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985 For 600 mm dia
115
388
44664
water stagnation;Manufacture, Supply and Delivery of RCC NP3 Socket and spigot pipes confirming to BIS 458/2003 including cost and conveyance of all materials For 600 mm dia (SSR item) (10km lead)
115
3712
426908
water stagnation;Flush Pointing to RR Masonary in Cement Mortor 1:3 Prop . including cost & conveyance of all materials like cement, sand to site, including labour charges on all materials, curing etc., Complete for finished item of work. {50% natural river sand + 50% rock sand}
36
116
4186
water stagnation;Randum Rubble Masonry in Cement Mortor 1:6 Prop using hard granite (CR stone), Rough stone, Bond stones including Cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones,Rough stone, bond stone etc.,including Labour charges for cutting Stones to required size and shape at mixing of Cement Mortor Construction, Scaffolding, lift and curing Charges etc., Complete for Finished item of Work .Per 1 Cum {50% natural river sand + 50% rock sand} Departmental stone
10.37
3783
39231
water stagnation;Randum Rubble Masonry in Cement Mortor 1:6 Prop using hard granite (CR stone), Rough stone, Bond stones including Cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones,Rough stone, bond stone etc.,including Labour charges for cutting Stones to required size and shape at mixing of Cement Mortor Construction, Scaffolding, lift and curing Charges etc., Complete for Finished item of Work .Per 1 Cum {50% natural river sand + 50% rock sand}
15.55
4644
72219
water stagnation;Plain Cement Concrete (1:5:10) using 40mm metal with hand mixing up to plinth level using 129.60kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site and Labour Charges for mixing , laying Concrete tamping, lifting, curing, finishing etc., complete for finished item of Work.1 Cum {50% natural river sand + 50% rock sand}
7.2
4809
34631
water stagnation;Carting of excavated earth with Manually, transportation to an average lead of about 14 KMts, including the tranport vehicles, cost and conveyance of all materials and all labour charges
217.2
241
52382
water stagnation;Removal of wet silt and sludge from sullage drains, with aid of baskets and vessels, etc with initial lift of 3 m and lead of 50 m. with implements
21.6
522
11275
water stagnation;Dismantling of stone masonry/ RR masonry wall including all charges etc., complete TBSC-U.I-01, pg: 186/546, ssr 22-23
21.6
634
13694
water stagnation;Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth
128.25
293
37580
water stagnation;cutting BT road surface including stacking of excavated materials for pipe line trench work.
11.25
1127
12679
water stagnation;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH, Reinforced Cement Concrete and prestressed Concrete
34.5
885
30550