Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Agriculture or Forestry Works
Opening Date21 Aug 2024
Closing Date28 Aug 2024
Tender Amount₹ 3,71,400 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Estimate for the Development and maintenance of;Application of FYM including internal distribution in red soil areas 60 cm pit

237

103

246.3

... More
Estimate for the Development and maintenance of;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (10"x16" / 14" x 15" bag size)

237

861

2042.68

... More
Estimate for the Development and maintenance of;Internal transporation of Bag plants to planting site

237

370

877.71

... More
Estimate for the Development and maintenance of;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (10"x16" / 14" x 15" bag plants)

237

2139

5069.9

... More
Estimate for the Development and maintenance of;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants

237

17

4114.32

... More
Estimate for the Development and maintenance of;Cost of Folidol/Lindane dust (10%) @ 20 gms/pit (@50gms per plant)

1

-

237

... More
Estimate for the Development and maintenance of;Application of Folidol/Lindane dust (10%) @ 20 gms/pit/dose (2 doses)

237

57

135.33

... More
Estimate for the Development and maintenance of;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)

1

-

474

... More
Estimate for the Development and maintenance of;Application of chemicals and fertilizers/Neem Cake etc (2 doses)

237

293

696.59

... More
Estimate for the Development and maintenance of;Replacement of casualities to a maximum of 20% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (8"x12" / 9" x 11" Tall Plants) only after verification by the DUB for survivials replacements shall be taken up in the month of Oct. If any casualities during the year, the Contractor agency has to taken up the gap filling plantation to the extent of dead at his own cost and must show 100% survival

47.4

2261

1071.71

... More
Estimate for the Development and maintenance of;Engaging of water tankers for watering through tankers of 5000 ltrs each trip capacity ( 5 trips per day- 25000 ltrs) 237 x 20ltrs x 43/25000=8.2 tankers (July - November = 2x5 = (10) (December = 3 (Jan - Feb = 4x2 = (8) (March = 5 April-May= 6x2 = (12), June-= 5

8.15

3352

27330.63

... More
Estimate for the Development and maintenance of;(B) SHRUB PLANTATION:Digging of pits of size 0.30x0.30x0.30 mts @ 0.1mtrs apart

656

1072

7038.42

... More
Estimate for the Development and maintenance of;Importation of good quality red earth congenial for plant growth of light textured, crystalline, porous and friable, generally acidic or neutral but not alkaline, fertile, cost, transportation, loading, unloading etc complete 0.30mt pits (0.30 x 0.30 x 0.30 x 656 x 2 / 3 = 11.81)

11.81

1228

14506.13

... More
Estimate for the Development and maintenance of;Application of Red soil 30cmt cube pit

656

30

202.9

... More
Estimate for the Development and maintenance of;Cost of the FYM (0.3x0.3x0.3=0.027 cmt) (1/8th of 0.1cmt)=2558.73/8

656

319

2098.15

... More
Estimate for the Development and maintenance of;Application of FYM 30cmt cube pit (176.76 / 8 = 22.09)

656

30

202.9

... More
Estimate for the Development and maintenance of;Transportation of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided (4"x7" / 6"x8") * If department vehicle is used only loading and unloading allowed (Tecoma gadichaudi / caesalpinia hardy plants)

656

269

1769.3

... More
Estimate for the Development and maintenance of;Internal transport of bag plants to planting site 4x7 bags

656

95

624.38

... More
Estimate for the Development and maintenance of;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)

1

-

656

... More
Estimate for the Development and maintenance of;Planting of bag plants after refilling the pits/support sticks (4"x7" / 6"x8"/5"x9") bags

656

154

1010.31

... More
Estimate for the Development and maintenance of;Cost of preparation of stakes (1.00m length)and transportation to site

656

6

3936

... More
Estimate for the Development and maintenance of;Application of chemicals and fertilizers/Neem Cake etc

656

293

1928.18

... More
Estimate for the Development and maintenance of;Replacement of causalities to a maximum of 10% of the planted, including re-opening of pits, transport of plants internal transport and planting. (4"x7" / 6"x8" Tall plants)

65.6

789

517.66

... More
Estimate for the Development and maintenance of;Cost and supply of water @ 5 Ltrs / plant in each watering on non rainy days, through water tanker of 5000 Ltrs capacity alternate days (5 trips per day - 25000 Ltrs) (656 x 5 x 180 Days / 25000 = 23.62)

23.62

3352

79167.92

... More
Estimate for the Development and maintenance of;C. watch and ward maintenance of the plants:Protection, maintenance, watering, tending the plants, weeding, in entire area, soil working upkeep of fencing and removal of unwanted growth etc (12) months @ One person

1

14675

176100

... More
Estimate for the Development and maintenance of;Add GST 18%

1

-

29785.35

... More
Estimate for the Development and maintenance of;Contingencies

1

-

40.49



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.