Municipal Corporation Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 1,26,424Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
574030Tender No
NIT No.24/03/ SE-M/LBNZ/GHMC/J2&J3/2024-25, date:01.02.2025Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Laying of SWD with RCC S/ S pipeline 600mm;Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5 MORD / 301 MORTH Hard rock (blasting prohibited)-Upto 3 m depth (mechanical means)
532.63
889
473605.94
... More
Laying of SWD with RCC S/ S pipeline 600mm;Manufacture supply and delivery of 600MM dia RCC Socket and Spigot pipes (NP-3) confirming to BIS 458/2003 including transportation up to a lead of 10KMS, including loading, unloading and stacking to work site
1045
3712
3879290.8
... More
Laying of SWD with RCC S/ S pipeline 600mm;Manufacture Supply and Delivery of Rubber Rings to suit 600mm dia RCC Socket and Spigot NP3 pipes confirming to BIS 5382/1985 (Rate per each Rubber Ring) including transportation, central excise duty, sales tax but excluding vat
418
442
184756
... More
Laying of SWD with RCC S/ S pipeline 600mm;Lowering of the 600mm RCC S/S pipes carefully into the trenches laying them true to alignment and Gradient, Joiting with Rubber Rings and Testing including filling with water witrh a water lead up 500m excluding cost for Rubber Rings as per BIS No.783/1985
1045
321
335936.15
... More
Laying of SWD with RCC S/ S pipeline 600mm;Supply of SWG SP-1 pipe conforming to ISI 651 - 12" dia (300 mm)-TBSP-A.II-05
30
1579
47370
... More
Laying of SWD with RCC S/ S pipeline 600mm;Lowering of 300 mm dia SWG pipe as per IS 651 of 1992 carfully in to trenches and laying in readymade trenches true to alignment graqdiant jointing with cemenr mortar ( 1:1) prop: curing and testing of store ware pipes for sewer lines including cost and conveyance of materials incidental charges etc. complete.
30
424
12748.5
... More
Laying of SWD with RCC S/ S pipeline 600mm;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in A.P., F.O.R. destination including, loading, un-loading & stacking at site but excluding central excise duty, sales tax, octroi and other Govt levies etc., as applicable.I.S.I Mark (H.D.-20 with 560mm dia clear opening)
15
2533
37995
... More
Laying of SWD with RCC S/ S pipeline 600mm;Raising manhole 0.10 mt depth Constructon over 0.90 circular sewer man hole of 0.90 mts depth with Cement concrete M20 grade nominal mix including removing and fixing FC/ CI cover and frame but excluding the cost of cover and frame . including the cost and conveyance of all materials at site complete and curing for 21 days complete all taxes as per specification etc complete. and excluding Seigniorage charges
20
685
13706.2
... More
Laying of SWD with RCC S/ S pipeline 600mm;Plain Cement concrete (1:4:8) using 40 mm metal with hand mixing upto Plinth level
35.48
5571
197656.81
... More
Laying of SWD with RCC S/ S pipeline 600mm;Supply and placing of RCC M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design.Bottom Raft
55.3
5668
313423.26
... More
Laying of SWD with RCC S/ S pipeline 600mm;Supply and placing of RCC M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design - Long wall
110.59
9630
1065107.13
... More
Laying of SWD with RCC S/ S pipeline 600mm;Supply and placing of RCC M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design -short wall
69.12
9630
665691.96
... More
Laying of SWD with RCC S/ S pipeline 600mm;Supply and placing of RCC M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design -Top Slab
55.3
8218
454473.4
... More
Laying of SWD with RCC S/ S pipeline 600mm;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded
26127.36
66
1748181.66
... More
Laying of SWD with RCC S/ S pipeline 600mm;Supply & Delivery of 600x600 mm DI Cover with frame - 90kgs
72
12807
922104
... More
Laying of SWD with RCC S/ S pipeline 600mm;Supply and placing of Mild Steel, Structural Steel, i.e. Angles, Channels & I - Sections as per drawings and technical specifications including cost and conveyance of all materials and all labour and operational charges complete as directed by the Departmental officers. (For providing girders on catchpits )
4200
146
614628
... More
Laying of SWD with RCC S/ S pipeline 600mm;Carting of excavated surplus earth to an initial lead of 15.00 km from site of work including loading, unloading & conveyance charges etc., complete
2704.65
291
788405.47
Evaluation Notes How It Works ?
Potential Partner