Municipal Corporation Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Irrigation Work
Opening Date11 Feb 2025
Closing Date18 Feb 2025
Tender Amount₹ 47,33,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development and maintenance of greenery;Phyllodendron xanadu gold (13"X13")

160

230

36800

... More
Development and maintenance of greenery;bird of paradise(13"X13")

160

350

56000

... More
Development and maintenance of greenery;Rader machera (21"X 21")

40

650

26000

... More
Development and maintenance of greenery;Syngonium (7"X8")

2000

28

56000

... More
Development and maintenance of greenery;Eranthemum gold (7"X8")

2000

28

56000

... More
Development and maintenance of greenery;fishtailfern (13"X13")

240

180

43200

... More
Development and maintenance of greenery;pisonia alba(13"X13")

240

100

24000

... More
Development and maintenance of greenery;Ficus reginald ( 21"X21")

90

650

58500

... More
Development and maintenance of greenery;Jacobina (7"X8")

2200

28

61600

... More
Development and maintenance of greenery;pandanus (7"X8")

2200

28

61600

... More
Development and maintenance of greenery;Eranthemum red (7"X8")

2200

28

61600

... More
Development and maintenance of greenery;Costus (7"X8")

2200

28

61600

... More
Development and maintenance of greenery;Dracena mahathma (13"X13")

560

100

56000

... More
Development and maintenance of greenery;ficus panda (13"X13")

560

100

56000

... More
Development and maintenance of greenery;Vitchimeria gold (21"X 21")

70

1820

127400

... More
Development and maintenance of greenery;Areca palm ( 13"X13")

500

150

75000

... More
Development and maintenance of greenery;spiderlilly (7"X8")

2600

28

72800

... More
Development and maintenance of greenery;Eranthemum brown (7"X8")

2600

28

72800

... More
Development and maintenance of greenery;Fish tail fern (13"X13")

320

180

57600

... More
Development and maintenance of greenery;Alpinia varigated ( 13"X13")

320

260

83200

... More
Development and maintenance of greenery;Cost of Plant Material: FILICIUM (21" X21")

120

845

101400

... More
Development and maintenance of greenery;GST 18%

1

-

509396.17

... More
Development and maintenance of greenery;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants

320

28

8960

... More
Development and maintenance of greenery;cost of chemical and fertilizers (for maintainance)

250

50

12500

... More
Development and maintenance of greenery;cost of folidol dust

150

35

5250

... More
Development and maintenance of greenery;Maintenance of Individual: i) Trimming once in 15 days, ii) Watering once in a day @ 5liters / per plant/ per day ( sub soil moisture shall be maintained continuously) iii) Formation of basins for each and avery plant upto 1 ft. away from the plant. iv) Application of fertilizers, insecticides, Fungicides ( @20 gms/pit/sqmt) etc,,

2880

612

211718.02

... More
Development and maintenance of greenery;Planting of individual shrub/rose/ornamental Bamboo: Digging the pit of size 0.60x0.60x0.60 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.(480 rmt = 480 / 2 mtrs spacing X 1 Rows =240Plants)

320

344

110358.4

... More
Development and maintenance of greenery;Planting of individual shrub/rose/ornamental Bamboo: Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.(16 spans X 30 = 480 Rmt / 0.75 mtr spacing X 4 Rows = 2560 Plants.

2560

194

496819.2

... More
Development and maintenance of greenery;Maintenance of hedge/shrub planting i) Trimming of hedges/ shrubs once in 15 days ii) Watering hadges/ shrubs once in a day @ 5 litres/per sqmts / per day / ( sub soil moisture shall be maintained continuously). iii) Formation of basins 1 ft away from the hedge . iv) Application of fertilizers, insecticides, Fungicides @20 gms/pit/sqmt) etc.

1040

2930

365762.59

... More
Development and maintenance of greenery;Hedge/Shrub Planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (20 gms / pit/sqmt) complete but excluding the cost of fertilizers (@20 gms/pit/sqmt) and plant material 16 spans X 30 mtr length X 1.00 width X 2 sides = 960sqmt 20 Sqmts U turn X 4 = 80 Sqmts) Total = 1040Sqmts

1040

756

786749.6

... More
Development and maintenance of greenery;Cost of Gravel including internal transportation, application and spreading complete (30 mtrs Length X 4.8 mtr width X 0.80 depth X 16 Spancs= 1843.2 Cum) ( U turn pillar side areas 20 cum X 4 Nos = 80 cum) total 1923.2cum

1923.2

432

831860.93



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.