Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Civil And Construction
Civil Works Others
Opening Date24 Dec 2024
Closing Soon31 Dec 2024
Tender Amount₹ 54,10,435
Costs
EMD
₹ 54,104Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
564269Tender No
NIT No.22/03/ SE-M/LBNZ/GHMC/J2&J3/2024-25, date:23.12.2024Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Balance work of Theme Park;GAZEBO- Plain Cement concrete (1:5:10) using 40 mm metal hand mixing including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site, labour charges, for mixing, laying , concrete ramming in 15 cm layers, finishing top surface to the required level curing etc., Complete for finished item of work as per .
2.7
5424
14644.8
... More
Balance work of Theme Park;GAZEBO- Construction of RR Masonary in C.M (1.6) prop. Using hard granite stone including cost and conveyance of all materials like cement, sand, water, Granite stone etc. including cost of seigniorage charges on all materials, all taxes including labour for cutting stones to required size and shape, mixing of cement mortar construction, Scaffolding charges etc. complete for finished item of work.
2.16
5367
11593.58
... More
Balance work of Theme Park;GAZEBO- Filling with Good Gravel soil, including supply and delivery of good gravel for filling, including cost of gravel, seinourage charges and conveyance to site, filling charges, watering, tamping and rammming and all labour charges and operational charges complete as directed by the Departmental officers.
16.2
506
8203.68
... More
Balance work of Theme Park;GAZEBO - Plain Cement Concrete (1:2:4) nominal mix using 20mm metal with hand mixing using 324kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, Cost of Seigniorage Charges on all materials, all taxes and Labour Charges for mixing , laying Concrete tamping, lifting, curing, finishing Etc., Complete for finished item of Work.1 Cum. Plain Cement concrete (1:2:4) using 20 mm metal with hand mixing
5.4
6868
37088.06
... More
Balance work of Theme Park;GAZEBO Flooring with high polished granite 16 to 18 mm mm thick slabs other than black set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tilesetc., complete, including seigniorage charges, labour charges for dressing of tilesetc., complete for finished item of work, but excluding the cost of conveyance of all materials
42
4771
200395.02
... More
Balance work of Theme Park;GAZEBO - Roofing will be provided with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self-tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti-capillary grove.
63
842
53046
... More
Balance work of Theme Park;GAZEBO - Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site Cost of Seigniorage Charges on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. (S.S. No. 504)
2.48
8773
21792.18
... More
Balance work of Theme Park;CYCLING TRACK & WALKING TRACK- Earthwork in excavation for structures(manual means) as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
6
332
1997.46
... More
Balance work of Theme Park;CYCLING TRACK & WALKING TRACK- Supply and Fixing of Precast Kerb blocks of M-30 grade fixing in true to alignment line and plumb and pointing with CM (1:3) to full depth of slabs including all labour charges etc complete as per IRC-67
650
241
156650
... More
Balance work of Theme Park;CYCLING TRACK & WALKING TRACK - Filling with Good Gravel soil, including supply and delivery of good gravel for filling, including cost of gravel, seinourage charges and conveyance to site, filling charges, watering, tamping and rammming and all labour charges and operational charges complete as directed by the Departmental officers.
54
506
27345.6
... More
Balance work of Theme Park;CYCLING TRACK & WALKING TRACK - Supply and placing of Ready Mix Concrete M 10 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading , curing for 14 days, centering, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design (M10-220 Kgs) . including formwork @ 4.00 % of cost of concrete i.e. cost of material, labour and machinery. )
27
4934
133231.5
... More
Balance work of Theme Park;CYCLING TRACK & WALKING TRACK Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished item of work,
360
1009
363477.6
... More
Balance work of Theme Park;CYCLING TRACK & WALKING TRACK - Painting two coats with synthetic enamel paint of approved quality colour and grade-I over a primary coat to new welded surface including cost of primary coat and cost and conveyance of all materials ,labourcharges etc.as per SS and directed by the departmental authorities for finished item of work.
350
259
90954.5
... More
Balance work of Theme Park;SKATING RINK- Flooring with high polished granite 16 to 18 mm mm thick slabs other than black set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tilesetc., complete, including seigniorage charges, labour charges for dressing of tilesetc., complete for finished item of work, but excluding the cost of conveyance of all materials
278.8
4771
1330241.23
... More
Balance work of Theme Park;SKATING RINK Painting to new walls with 2 coats of water proof cement paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls
37.8
310
11744.46
... More
Balance work of Theme Park;SENIOR CITIZEN AREA - Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished item of work
227.2
1009
229394.75
... More
Balance work of Theme Park;SENIOR CITIZEN AREA - Painting to new walls with 2 coats of water proof cement paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls
37.7
310
11713.39
... More
Balance work of Theme Park;SENIOR CITIZEN AREA Flooring with high polished granite 16 to 18 mm mm thick slabs other than black set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tilesetc., complete, including seigniorage charges, labour charges for dressing of tilesetc., complete for finished item of work, but excluding the cost of conveyance of all materials(wall cladding)
52.2
4771
249062.38
... More
Balance work of Theme Park;GATHERING SPACE- Artistic Painting with Acrylic Exterior or higher grade paint including cost, conveyance of all materials to the work site, and all operational, incidental, labour charges, Hire charges for scaffolding with required materials as per the site condition, etc complete for finished item of work as per the design approved by the Enginee-in-Charge (< 6m wall)
5593.46
110
615280.47
... More
Balance work of Theme Park;GATHERING SPACE - Painting to new walls with 2 coats of water proof cement paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls
231.48
310
71920.84
... More
Balance work of Theme Park;GATHERING SPACE -Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished item of work
620
1009
625989.2
... More
Balance work of Theme Park;PLAY COURT- Filling with Good Gravel soil, including supply and delivery of good gravel for filling, including cost of gravel, seinourage charges and conveyance to site, filling charges, watering, tamping and rammming and all labour charges and operational charges complete as directed by the Departmental officers.
129.6
506
65629.44
... More
Balance work of Theme Park;PLAY COURT - Earthwork in excavation for structures(manual means) as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
6.48
332
2157.26
... More
Balance work of Theme Park;PLAY COURT -Plain Cement Concrete (1:2:4) nominal mix using 20mm metal with hand mixing using 324kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, Cost of Seigniorage Charges on all materials, all taxes and Labour Charges for mixing , laying Concrete tamping, lifting, curing, finishing Etc., Complete for finished item of Work.1 Cum. Plain Cement concrete (1:2:4) using 20 mm metal with hand mixing
11.52
6868
79121.2
... More
Balance work of Theme Park;PLAY COURT- S& F 50 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete
96
547
52512
... More
Balance work of Theme Park;PLAY COURT- Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 2"x2" (50 mm x 50 mm) - 8 Gauge- PVC Coated
192
727
139584
... More
Balance work of Theme Park;PLAY COURT - Supply and fixing of MS Z Hold fasts - 300 mm long of 40 x 40 x 5mm , MS flats of size 100mm length 4mm thick including cost and conveyance of all materials welding etc complete
350
146
51219
... More
Balance work of Theme Park;PLAY COURT - Drilling of 16No's through holes of 12mm dia to GI pipes
480
7
3360
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%