Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
532641Tender No
04/EEC-2/UPL/GHMC/12/2024-25, Dated : 04-07-2024 (Reserved for SC community Individuals and Societies)Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Community Hall;Construction of RR Masonary in C.M (1:6) prop. Using hard granite stone including cost and conveyance of all materials like cement, sand, water, Granite stone etc. including cost of seigniorage charges on all materials, all taxes including labour for cutting stones to required size and shape, mixing of cement mortar construction, Scaffolding charges etc. complete for finished item of work.
23.67
4587
108576
... More
Construction of Community Hall;Filling with Gravel in basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
28.25
442
12489
... More
Construction of Community Hall;Providing brick work \ in CM (1:6) prop., using common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size , including cost & conveyance of all material and labour charges, centering & scafolding charges, and overhead charges & Contractors profit etc., complete as per APSS No.501 for Super structure Ground Floor.
15.34
7613
116777
... More
Construction of Community Hall;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded
400
61
24652
... More
Construction of Community Hall;Plastering 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including c/c of all materials like cement, sand,water etc., to site, other taxes on all materials, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, etc., complete for for finished item of work. (APSS 1001,1003 & 1004) (CSSR) Ground floor
162.21
528
85712
... More
Construction of Community Hall;Flooring with full body heavy duty industrial variety porcelain vitrified tile of size 300 x 300 / 200 x 100 mm and thickness between 18-20 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick and filling the joints with white cement mixed with pigment of matching shade to match the shade of granite over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, granite slabs, white cement etc., to site (excluding cost of C.C. bed)cost of excluding seigniorage on all materials cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete for finished item of work. (APSS No.707 & 701)
35
1167
40864
... More
Construction of Community Hall;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering. - Lintals
0.08
13721
1136
... More
Construction of Community Hall;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering. - Sun Shades
1.44
1070
1542
... More
Construction of Community Hall;Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item
162.21
261
42343
... More
Construction of Community Hall;Providing and fixing 2 Track 2 glass shutter sliding Windows fabricated from roll formed sections made of Galvanized Steel Colour Coated/ Powder Coated (Base Steel as per IS 513 ?D? quality, Galvanized as per IS 277 with Zinc of 120 GM/Sq.mtr) with total coated thickness of 0.58mm. Primer coat with epoxy primer of 5?7 micron thick, finish painted with polyester paint of 12-16 microns thick and back coated with alkyd backerof 5-7 microns or Powder Coated with pure Polyester Powder up to 50-60 microns thick. Section for external frame should be of 44 x59mm, Section for glass shutter should be of 35 x49 mm Section for euro groove should be 25 x24mm( Aluminium/Plastic)and Lap Strip should be of 30 x 41mm(Aluminium/Plastic).shutter should be provided with a glass of 5mm PlainFloat Glass. Corner bracket for External frame made of Steel/Polypropylene, Corner Bracket forInternal frame made of Steel/Polypropylene,Touch Lock, Rollers, wool pile for lap strip & euro groove, Bump Stop Base & Rubber for shutterstopper. Ethyl Propylene Diamine Monomer(EPDM) Gasket should be used all around glass inshutter. The Frame Section should be cut to length and mitre joined with Corner brackets & Shutter Sections should be cut to length and mitre joined with Corner Bracket. Window Frame should be fixed to brick/ concrete masonry by using Nylon self-expanding caps and driving MS electroplated 80mm long screws into the caps through frames.10mm square guard bars with 6? pitch (152.4mm) max to be fixed wall to wall and all taxes complete for finished item of work
3.6
8097
29149
... More
Construction of Community Hall;Supply and fixing of sal wood Door double shutter Flush shutter to a frame of size 1.50 x 2.10m withFlush door shutters, solid bond wood block board type with teak ply on both faces.: 35 mm thick conforming to IS:2202 - TBSC-L.II-03, door of size 1.50 x 2.10 m with frame made of well seasoned sal Wood scantlings of size 100 x 75mm and shutter side rails 100mm X 32mm, top rail 100 mmX32 mm, bottom rail 100mmX 32 mm and intermediate rails of 100mm x 32 mm and planks s - 10 nos. of 25mm thick as per approved design with fixtures of 6 nos of 9" ' z" holdfasts, 300 mm long bross aldrop-1 no, 125mm long bross butt hinges 6 No's, bross Door stoppers-2 no, 250mm bross tower bolt - 2nos, 150mm long brass Tower bolts 1- no, brass fancy handles 150 mm -2nos with necessary screws complete including cost and conveyance of all materials and labour charges etc. complete
2
15411
30823
... More
Construction of Community Hall;Painting two coats with synthetic enamel paint of approved quality colour and grade-I over a primary coat to new welded surface including cost of primary coat and cost and conveyance of all materials and labour chages etc., complete.
11.61
218
2539
... More
Construction of Community Hall;S/F of MS Grill including cost and conveyance of all materials and labour charges etc., complete.
295
111
32981
... More
Construction of Community Hall;Supply and fixing of 50mm dia norminal bore G.I pipe medium grade properties & weight as per IS 12:39 ISI mark with GI fittings including ost of pipe and it is fittings and labour charges etc., complete (TBSP-G.I-12)
52
547
28444
... More
Construction of Community Hall;Providing and fixiing with 0.5mm thick galvanised/prepainted GI polished sheets fixed to the purling with 14 size self drilling screws with neeprene washesr side laps are stiched with self tapping/drilling screws. End laps eve to be sealed with 25x3mm Butyl tape the sheets are provided with antic capillary grove etc for finished item work.(TBSC-R.I-41)
40.6
842
34187
... More
Construction of Community Hall;Provision for nuts bolts and required fixtures cost and conveyance of all materials and labour chages etc., complete.
25
89
2225
... More
Construction of Community Hall;S/F of 25mm dia PVC Pips for electricalfittings ELEC-1.2.1
77.4
43
3328
... More
Construction of Community Hall;S&F of 25mm PVC Junction boxes ELEC-1.2.6
16
26
416
... More
Construction of Community Hall;S&F of 25mm PVCbends ELEC-1.2.8
22
10
220
... More
Construction of Community Hall;S&F of PVC 6 module boxes ELEC-1.3.1d
6
164
984
... More
Construction of Community Hall;S&F of PVC 12 module boxes ELEC-1.3.1f
4
258
1032
... More
Construction of Community Hall;Supplying & fixing approved make Indian pattern white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-2004 with "P" or "S" trap: 580 mm Long TBSP-E.I-01
1
1628
1628
... More
Construction of Community Hall;110mm dia pvc pipes 6.0 Kgs/cm2
4.5
245
1103
... More
Construction of Community Hall;22.2mm dia cpvc pipe TBSP-J.III-01
12.5
178
2225
... More
Construction of Community Hall;Supply of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable. Makes : Finolex / RR kabel / Havells
1235
22
28356
... More
Construction of Community Hall;Supply of 36/0.3mm (2.5 Sqmm) FR / FRLS PVC insulated ISI Copper cable of makes Pawancab / Star / Milltec / Fine Cab / Payal / Sunlight / Bentec / Gemscab.
265
37
9837
... More
Construction of Community Hall;Supply of 6/ 10A 1 Way 1 module Modular Switch ofLegrand Myrius / GM Four Five / Million mway / Goldmedal Curve / Anchor Roma Plus / Havells Fabio / Panasonic Vision / Hager Insista / Benlo Vesta / C&S Primo / CPL Vysma / Polycab Levana / Salzar / Infinity
22
79
1738
... More
Construction of Community Hall;Supply and fixing of 10A 3/2 Pin 2 Module Modular Socket with shutter. including wire leads, earth connections along with all labour charges etc., complete..and as per 2.1.4 of Sta revised data of
22
39
858
... More
Construction of Community Hall;Supply of 48" (1200mm) Sweep decorative Ceiling Fan 1 Star Rated with all accessories etc., complete.Makes : Crompton / Havells / Orient
12
2000
24000
... More
Construction of Community Hall;S&F Stepped type Electronic Regulator.
12
242
2904
... More
Construction of Community Hall;S&F of 12 model vertical Modular Cover Frame.
6
207
1242
... More
Construction of Community Hall;S&F of 6 model vertical Modular Cover Frame.
9
138
1242
... More
Construction of Community Hall;Supply of 6-32A 10KA SP MCB ISI Mark of make Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora / Cabtree / Indo Asian / BCH
6
309
1854
... More
Construction of Community Hall;Supply of 32A DP Isolator. Makes : ABB / GM / Havells / HPL(Techno) / Hager / C&S/ Honeywell sentry / Salzar
4
468
1872
... More
Construction of Community Hall;Supply of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter. Makes : Legrand Myrius / Cabtree Thames Platinum / Million Logus / Gold Medal Curve / Anchor Roma viola / CPL.
29
178
5162
... More
Construction of Community Hall;Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 40W bulb (for new installation).
65
23
1495
... More
Construction of Community Hall;S/D of 7/20 service wire with ISI mark
95
16
1520
... More
Construction of Community Hall;Supply and fixing of RCC perforated square cover of size with 0.7*0.7*0.125 & base frame with size 0.9*0.9*0.2 including cost and conveyance of material etc., complete
6
3225
19350