Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Building Construction
Opening Date17 Jan 2025
Closing Date24 Jan 2025
Tender Amount₹ 23,93,426 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of 2nd floor to Community Hall;Supply of 56/0.3mm (4.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR). including Cost and Conveyance of all materials,labour complete etc. ( SSR 2019-20 : ELEC-1.5.1 )

30

59

1785

... More
Construction of 2nd floor to Community Hall;Supply of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR) including Cost and Conveyance of all materials,labour complete etc. ( SSR 2019-20 : ELEC-1.5.1 )

30

39

1170

... More
Construction of 2nd floor to Community Hall;Supply of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR). including Cost and Conveyance of all materials,labour complete etc SSR 2019-20 : ELEC-1.5.1 .

30

24

720

... More
Construction of 2nd floor to Community Hall;Supply of 63A FP Isolator. Makes : ABB / Havells / HPL(Techno) / Hager / Indo Asian (Gold Plus) / C&S / Honeywell sentry. including Cost and Conveyance of all materials,labour complete etc.

3

1440

4320

... More
Construction of 2nd floor to Community Hall;Supply of Pendent Holder / Adopter of makes Anchor / Gold Medal Olive / Million Zoom including Cost and Conveyance of all materials,labour complete etc.

5

20

100

... More
Construction of 2nd floor to Community Hall;Supply of 3 Plate Jumbo Ceiling Rose of makes Anchor / Gold Medal Olive / Million Zoom. including Cost and Conveyance of all materials,labour complete etc.

5

25

125

... More
Construction of 2nd floor to Community Hall;Supply of stepped type Electronic Regulator of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega including Cost and Conveyance of all materials,labour complete etc.

5

242

1210

... More
Construction of 2nd floor to Community Hall;Supply of 16A flush type Swich of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega including Cost and Conveyance of all materials,labour complete etc.

5

72

360

... More
Construction of 2nd floor to Community Hall;Supply of 16A Triangle Plug Top of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega including Cost and Conveyance of all materials,labour complete etc.

5

56

280

... More
Construction of 2nd floor to Community Hall;Supply of 16A flush type Socket with shutter of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega including Cost and Conveyance of all materials,labour complete etc.

5

72

360

... More
Construction of 2nd floor to Community Hall;Supply of 6A 1 Way flush type Swich of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega including Cost and Conveyance of all materials,labour complete etc.

5

20

100

... More
Construction of 2nd floor to Community Hall;Supply of PVC insulated 2 core 1.5 Sqmm sheathed flexible copper cable for voltage up to 1100V as per IS 694/1990 of makes Finolex / RR Kable / KEI. including Cost and Conveyance of all materials,labour complete etc.

5

59

295

... More
Construction of 2nd floor to Community Hall;Supply of Decolam Board of Size 6" x 6" including Cost and Conveyance of all materials,labour complete etc.

5

37

185

... More
Construction of 2nd floor to Community Hall;Supply of Decolam Board of Size 4" x 7" including Cost and Conveyance of all materials,labour complete etc.

5

27

135

... More
Construction of 2nd floor to Community Hall;Supply of Decolam Board of Size 4" x 4" including Cost and Conveyance of all materials,labour complete etc.

5

16

80

... More
Construction of 2nd floor to Community Hall;Supply of 12 Module box vertical. including Cost and Conveyance of all materials,labour complete etc.

5

285

1425

... More
Construction of 2nd floor to Community Hall;Supply of 8 or 9 Module box Horizontal/Vertical including Cost and Conveyance of all materials,labour complete etc.

5

235

1175

... More
Construction of 2nd floor to Community Hall;Supply of 6 Module box including Cost and Conveyance of all materials,labour complete etc.

5

180

900

... More
Construction of 2nd floor to Community Hall;Supply of 4 Module box including Cost and Conveyance of all materials,labour complete etc.

5

130

650

... More
Construction of 2nd floor to Community Hall;Supply of 3 Module box including Cost and Conveyance of all materials,labour complete etc.

5

110

550

... More
Construction of 2nd floor to Community Hall;Supply of 1 or 2 Module box including Cost and Conveyance of all materials,labour complete etc.

5

80

400

... More
Construction of 2nd floor to Community Hall;Supply of PVC Junction Boxes Deep size 25mm including Cost and Conveyance of all materials,labour complete etc.

1

35

35

... More
Construction of 2nd floor to Community Hall;Supply of ISI 20mm outer dia medium (1.55mm thickness) grade with IS:9537 part 3 regid PVC pipe of makes Sudhakar including Cost and Conveyance of all materials,labour complete etc. ELEC-1.2.2

100

25

2500

... More
Construction of 2nd floor to Community Hall;Supply of ISI 25mm outer dia medium (1.80mm thickness) grade with IS:9537 part 3 regid PVC pipe of makes Sudhakar including Cost and Conveyance of all materials,labour complete etc. ELEC-1.2.2

100

32

3200

... More
Construction of 2nd floor to Community Hall;Supply and Transportation of 1.00 HP (25x25mm). Single phase ISI Mono block CI body motor pumpset Makes: Texmo / CRI / KSB / Aryan Varsha / Lubi including Cost and Conveyance of all materials,labour complete etc. ELEC-5.9.3

1

11900

11900

... More
Construction of 2nd floor to Community Hall;Supplying and Fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS2548-1996 including Cost and Conveyance of all materials,labour complete etc. TBSP-E.V-01

2

1286

2572

... More
Construction of 2nd floor to Community Hall;Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 590 x 375 x 390 mm including Cost and Conveyance of all materials,labour complete etcTBSP-E.VII-03.

2

3959

7918

... More
Construction of 2nd floor to Community Hall;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 8931 including Cost and Conveyance of all materials,labour complete etc.SSR- TBSP-F.I-02 .

5

661

3305

... More
Construction of 2nd floor to Community Hall;S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 including Cost and Conveyance of all materials,labour complete etc. .TBSP-F.IV-07

10

676

6760

... More
Construction of 2nd floor to Community Hall;75 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm including Cost and Conveyance of all materials,labour complete etc. TBSP-H.I-01

20

301

6020

... More
Construction of 2nd floor to Community Hall;110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm including Cost and Conveyance of all materials,labour complete etc. TBSP-H.I-03

15

569

8535

... More
Construction of 2nd floor to Community Hall;Supply of 32mm PPR Tee conforming to DIN Standards8077/8084 including Cost and Conveyance of all materials,labour complete etc.TBSP-J.III-67

5

56

280

... More
Construction of 2nd floor to Community Hall;Supply of 25mm PPR Tee conforming to DIN Standards8077/8084 including Cost and Conveyance of all materials,labour complete etc.TBSP-J.III-66

5

33

165

... More
Construction of 2nd floor to Community Hall;Supply of 20mm PPR Tee conforming to DINStandards8077/8084 including Cost and Conveyance of all materials,labour complete etcTBSP-J.III-65.

5

19

95

... More
Construction of 2nd floor to Community Hall;Supply of 32mm PPR Elbow conforming to DIN Standards 8077/8084 including Cost and Conveyance of all materials,labour complete etc.TBSP-J.III-58

5

47

235

... More
Construction of 2nd floor to Community Hall;Supply of 25mm PPR Elbow conforming to DIN Standards 8077/8084 including Cost and Conveyance of all materials,labour complete etc.TBSP-J.III-57

5

24

120

... More
Construction of 2nd floor to Community Hall;Supply of 20mm PPR Elbow conforming to DIN Standards 8077/8084 including Cost and Conveyance of all materials,labour complete etc. TBSP-J.III-56

5

21

105

... More
Construction of 2nd floor to Community Hall;Supply of 32mm PPR Socket conforming to DIN Standards 8077/8084 including Cost and Conveyance of all materials,labour complete etc. (TBSP-J.III-42)

5

23

115

... More
Construction of 2nd floor to Community Hall;Supply of 25mm PPR Socket conforming to DIN Standards 8077/8084 including Cost and Conveyance of all materials,labour complete etc. (TBSP-J.III-41)

5

18

90

... More
Construction of 2nd floor to Community Hall;Supply of 20mm PPR Socket conforming to DIN Standards 8077/8084 including Cost and Conveyance of all materials,labour complete etc. (TBSP-J.III-40)

5

13

65

... More
Construction of 2nd floor to Community Hall;S&F premium make CPVC Pipes of 22.20mm OD Pipe - SDR 13.5 including Cost and Conveyance of all materials,labour complete etc. (tbsp-j.III-02)

20

178

3560

... More
Construction of 2nd floor to Community Hall;S&F premium make CPVC Pipes of 15.90mm OD Pipe - SDR 13.5 including Cost and Conveyance of all materials,labour complete etc.

50

155

7750

... More
Construction of 2nd floor to Community Hall;Supply & fixing of PVC low level system with internal components & short bend: 10 Litres capacity Single Flush including Cost and Conveyance of all materials,labour complete etc.

2

2045

4090

... More
Construction of 2nd floor to Community Hall;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with 'S' trap including Cost and Conveyance of all materials,labour complete etc. (TBSP-E.II-020)

2

2102

4204

... More
Construction of 2nd floor to Community Hall;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 630 x 450 mm - Single C.P. Pillar cock

1

2929

2929

... More
Construction of 2nd floor to Community Hall;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

2000

10

20000

... More
Construction of 2nd floor to Community Hall;Pre Laminated Cement Bonded Particle Board WINDOWS ? Double shutter 3?0? x 3?0? outer frame section size of 50mm x 60mm shutter frame section size of 48mm x 25mm Mullion section size of 50mm x 60mm for outer frame.

7.2

8024

57773

... More
Construction of 2nd floor to Community Hall;Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, 2 Coats (All Colours) including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work(Qty as per Plastering)

916

159

146047

... More
Construction of 2nd floor to Community Hall;Painting with synthetic enamel paint in all shades Grade-I two coats including cost and conveyance of Synthatic enamel paint ( at 20Sqm /Lr as per British paints(I) Ltd.,) , labour charges, etc., complete for new iron work

200

120

24144

... More
Construction of 2nd floor to Community Hall;Supply and fixing of MS gate/ Window grills, Iron doors/ Iron windows as approved by the dept officers including cost and conveyance of metarials, fabrication charges, cost of welding rods, power charges, labour charges for fixing of gate in position etc complete (SSR item)

280

110

30800

... More
Construction of 2nd floor to Community Hall;Flooring with Vetrified tiles of1st quality set over base coat of cement mortar (1:8) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete for finished item of work,

130

1273

165550

... More
Construction of 2nd floor to Community Hall;Flooring with 25mm thick Polished Shabad Stones / Thandur rough stone slab set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of floorings tones etc., complete for finished item of work, but excluding the cost of conveyance of all materials for finished item of work

30

799

23994

... More
Construction of 2nd floor to Community Hall;Supply and filling with good gravel (exluding rock) in trenches sides of foundations and basement with intial lead inlayers not exceeding 15 cms thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges hire charges of T & P etc., coplete for finished tiem of work

13.5

445

6017

... More
Construction of 2nd floor to Community Hall;Supply, Delivery and Fixing of 160mm dia PVC pipes for potable water supplies conforming to IS:4985/2000 with bell ends(Socket) as per specification in casing pipe 4Kg/Sqcm etc., complete including cost and conveyance of all materials for finished item of work(SSR-13-14,PGNO;59)

50

385

19250

... More
Construction of 2nd floor to Community Hall;Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials. {50% natural river sand + 50% rock sand}

60

1119

67166

... More
Construction of 2nd floor to Community Hall;Powder Coated Mild Steel Hallow single rebate door frames manufactured using cold roll formed process steel sheet of 1.25 mm thick bright (Cold Rolled Close Annealed (CRCA) and profile size of 105 x 60 mm conforming to IS 4351 - 2003 including pre-treatment, Galvanized as per IS:277, zinc phosphating finished with hermosetting Polyurethane paint of Aliphatic Grade providing high levels of scratch resistance and durability/Epoxy polyester powder for powdercoating paint thickness 60 ? 65 microns(Dry filmthickness)Stainless Steel Ball Bearing Butt Hinges3 mm thick fixed flush to the frame with Hinges, Base Ties, Holdfast Lugs, Mortar Guards, shock absorbers and provision for Tower Bolts, Aldrops, Lock & Strike plates etc. for both single and dou ble shutter doors.

19.2

732

14054

... More
Construction of 2nd floor to Community Hall;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost and conveyance of all materials, seigniorage charges, including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

120

612

73524

... More
Construction of 2nd floor to Community Hall;Flush door shutters, solid bond wood block board type with teak ply on both faces.: 35 mm thick conforming to IS:2202 .including Cost and Conveyance of all materials,labour complete etc.

11.52

2300

26496

... More
Construction of 2nd floor to Community Hall;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, including cost of all materail like HYSD bars, binding wire and labour charges for cutting, bending, shifting to site, tying etc.. where they are not welded.

3531.4

58

207964

... More
Construction of 2nd floor to Community Hall;Plastering 12mm thick in two coats with base coat of 8mm thick in C.M. (1:6) and topcoat of 4mm thick in C.M (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand,. Water, etc., to site, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls {50% natural river sand + 50% rock sand}

388

554

215057

... More
Construction of 2nd floor to Community Hall;Plastering 20mm thick in two coats with base coat of 16mm thick in C.M. (1:6) and topcoat of 4mm thick in C.M (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand,. Water, etc., to site, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls {50% natural river sand + 50% rock sand}

528

573

302956

... More
Construction of 2nd floor to Community Hall;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site Cost of Seigniorage Charges on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. , per 1 Cum.

61.68

7789

480466

... More
Construction of 2nd floor to Community Hall;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal ----------Roof slab of 150mm thick WAITING HALL

100

1831

183191

... More
Construction of 2nd floor to Community Hall;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal ----------Lintels for windows

0.58

14574

8453

... More
Construction of 2nd floor to Community Hall;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal ---------Roof Beams( WAITING HALL )

6.21

13840

85948

... More
Construction of 2nd floor to Community Hall;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal------- Columns

3.65

14870

54205

... More
Construction of 2nd floor to Community Hall;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrating, centring curing etc.,complete but excluding cost of steel and its fabrication charges and shuttering charges for finished item of work. - Stair 150mm thick

28.2

1831

51660

... More
Construction of 2nd floor to Community Hall;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth

72

293

21097

... More
Construction of 2nd floor to Community Hall;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH

12

885

10626

... More
Construction of 2nd floor to Community Hall;Item Detailed Specification Description

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.