Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Civil And Construction
Building Construction
Opening Date17 Jan 2025
Closing Date24 Jan 2025
Tender Amount₹ 23,93,426
Costs
EMD
₹ 23,934Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
568627Tender No
19/EEC-2/UPL/GHMC/72/2024-25, Dated : 10-01-2025Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of 2nd floor to Community Hall;Supply of 56/0.3mm (4.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR). including Cost and Conveyance of all materials,labour complete etc. ( SSR 2019-20 : ELEC-1.5.1 )
30
59
1785
... More
Construction of 2nd floor to Community Hall;Supply of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR) including Cost and Conveyance of all materials,labour complete etc. ( SSR 2019-20 : ELEC-1.5.1 )
30
39
1170
... More
Construction of 2nd floor to Community Hall;Supply of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR). including Cost and Conveyance of all materials,labour complete etc SSR 2019-20 : ELEC-1.5.1 .
30
24
720
... More
Construction of 2nd floor to Community Hall;Supply of 63A FP Isolator. Makes : ABB / Havells / HPL(Techno) / Hager / Indo Asian (Gold Plus) / C&S / Honeywell sentry. including Cost and Conveyance of all materials,labour complete etc.
3
1440
4320
... More
Construction of 2nd floor to Community Hall;Supply of Pendent Holder / Adopter of makes Anchor / Gold Medal Olive / Million Zoom including Cost and Conveyance of all materials,labour complete etc.
5
20
100
... More
Construction of 2nd floor to Community Hall;Supply of 3 Plate Jumbo Ceiling Rose of makes Anchor / Gold Medal Olive / Million Zoom. including Cost and Conveyance of all materials,labour complete etc.
5
25
125
... More
Construction of 2nd floor to Community Hall;Supply of stepped type Electronic Regulator of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega including Cost and Conveyance of all materials,labour complete etc.
5
242
1210
... More
Construction of 2nd floor to Community Hall;Supply of 16A flush type Swich of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega including Cost and Conveyance of all materials,labour complete etc.
5
72
360
... More
Construction of 2nd floor to Community Hall;Supply of 16A Triangle Plug Top of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega including Cost and Conveyance of all materials,labour complete etc.
5
56
280
... More
Construction of 2nd floor to Community Hall;Supply of 16A flush type Socket with shutter of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega including Cost and Conveyance of all materials,labour complete etc.
5
72
360
... More
Construction of 2nd floor to Community Hall;Supply of 6A 1 Way flush type Swich of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega including Cost and Conveyance of all materials,labour complete etc.
5
20
100
... More
Construction of 2nd floor to Community Hall;Supply of PVC insulated 2 core 1.5 Sqmm sheathed flexible copper cable for voltage up to 1100V as per IS 694/1990 of makes Finolex / RR Kable / KEI. including Cost and Conveyance of all materials,labour complete etc.
5
59
295
... More
Construction of 2nd floor to Community Hall;Supply of Decolam Board of Size 6" x 6" including Cost and Conveyance of all materials,labour complete etc.
5
37
185
... More
Construction of 2nd floor to Community Hall;Supply of Decolam Board of Size 4" x 7" including Cost and Conveyance of all materials,labour complete etc.
5
27
135
... More
Construction of 2nd floor to Community Hall;Supply of Decolam Board of Size 4" x 4" including Cost and Conveyance of all materials,labour complete etc.
5
16
80
... More
Construction of 2nd floor to Community Hall;Supply of 12 Module box vertical. including Cost and Conveyance of all materials,labour complete etc.
5
285
1425
... More
Construction of 2nd floor to Community Hall;Supply of 8 or 9 Module box Horizontal/Vertical including Cost and Conveyance of all materials,labour complete etc.
5
235
1175
... More
Construction of 2nd floor to Community Hall;Supply of 6 Module box including Cost and Conveyance of all materials,labour complete etc.
5
180
900
... More
Construction of 2nd floor to Community Hall;Supply of 4 Module box including Cost and Conveyance of all materials,labour complete etc.
5
130
650
... More
Construction of 2nd floor to Community Hall;Supply of 3 Module box including Cost and Conveyance of all materials,labour complete etc.
5
110
550
... More
Construction of 2nd floor to Community Hall;Supply of 1 or 2 Module box including Cost and Conveyance of all materials,labour complete etc.
5
80
400
... More
Construction of 2nd floor to Community Hall;Supply of PVC Junction Boxes Deep size 25mm including Cost and Conveyance of all materials,labour complete etc.
1
35
35
... More
Construction of 2nd floor to Community Hall;Supply of ISI 20mm outer dia medium (1.55mm thickness) grade with IS:9537 part 3 regid PVC pipe of makes Sudhakar including Cost and Conveyance of all materials,labour complete etc. ELEC-1.2.2
100
25
2500
... More
Construction of 2nd floor to Community Hall;Supply of ISI 25mm outer dia medium (1.80mm thickness) grade with IS:9537 part 3 regid PVC pipe of makes Sudhakar including Cost and Conveyance of all materials,labour complete etc. ELEC-1.2.2
100
32
3200
... More
Construction of 2nd floor to Community Hall;Supply and Transportation of 1.00 HP (25x25mm). Single phase ISI Mono block CI body motor pumpset Makes: Texmo / CRI / KSB / Aryan Varsha / Lubi including Cost and Conveyance of all materials,labour complete etc. ELEC-5.9.3
1
11900
11900
... More
Construction of 2nd floor to Community Hall;Supplying and Fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS2548-1996 including Cost and Conveyance of all materials,labour complete etc. TBSP-E.V-01
2
1286
2572
... More
Construction of 2nd floor to Community Hall;Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 590 x 375 x 390 mm including Cost and Conveyance of all materials,labour complete etcTBSP-E.VII-03.
2
3959
7918
... More
Construction of 2nd floor to Community Hall;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 8931 including Cost and Conveyance of all materials,labour complete etc.SSR- TBSP-F.I-02 .
5
661
3305
... More
Construction of 2nd floor to Community Hall;S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 including Cost and Conveyance of all materials,labour complete etc. .TBSP-F.IV-07
10
676
6760
... More
Construction of 2nd floor to Community Hall;75 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm including Cost and Conveyance of all materials,labour complete etc. TBSP-H.I-01
20
301
6020
... More
Construction of 2nd floor to Community Hall;110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm including Cost and Conveyance of all materials,labour complete etc. TBSP-H.I-03
15
569
8535
... More
Construction of 2nd floor to Community Hall;Supply of 32mm PPR Tee conforming to DIN Standards8077/8084 including Cost and Conveyance of all materials,labour complete etc.TBSP-J.III-67
5
56
280
... More
Construction of 2nd floor to Community Hall;Supply of 25mm PPR Tee conforming to DIN Standards8077/8084 including Cost and Conveyance of all materials,labour complete etc.TBSP-J.III-66
5
33
165
... More
Construction of 2nd floor to Community Hall;Supply of 20mm PPR Tee conforming to DINStandards8077/8084 including Cost and Conveyance of all materials,labour complete etcTBSP-J.III-65.
5
19
95
... More
Construction of 2nd floor to Community Hall;Supply of 32mm PPR Elbow conforming to DIN Standards 8077/8084 including Cost and Conveyance of all materials,labour complete etc.TBSP-J.III-58
5
47
235
... More
Construction of 2nd floor to Community Hall;Supply of 25mm PPR Elbow conforming to DIN Standards 8077/8084 including Cost and Conveyance of all materials,labour complete etc.TBSP-J.III-57
5
24
120
... More
Construction of 2nd floor to Community Hall;Supply of 20mm PPR Elbow conforming to DIN Standards 8077/8084 including Cost and Conveyance of all materials,labour complete etc. TBSP-J.III-56
5
21
105
... More
Construction of 2nd floor to Community Hall;Supply of 32mm PPR Socket conforming to DIN Standards 8077/8084 including Cost and Conveyance of all materials,labour complete etc. (TBSP-J.III-42)
5
23
115
... More
Construction of 2nd floor to Community Hall;Supply of 25mm PPR Socket conforming to DIN Standards 8077/8084 including Cost and Conveyance of all materials,labour complete etc. (TBSP-J.III-41)
5
18
90
... More
Construction of 2nd floor to Community Hall;Supply of 20mm PPR Socket conforming to DIN Standards 8077/8084 including Cost and Conveyance of all materials,labour complete etc. (TBSP-J.III-40)
5
13
65
... More
Construction of 2nd floor to Community Hall;S&F premium make CPVC Pipes of 22.20mm OD Pipe - SDR 13.5 including Cost and Conveyance of all materials,labour complete etc. (tbsp-j.III-02)
20
178
3560
... More
Construction of 2nd floor to Community Hall;S&F premium make CPVC Pipes of 15.90mm OD Pipe - SDR 13.5 including Cost and Conveyance of all materials,labour complete etc.
50
155
7750
... More
Construction of 2nd floor to Community Hall;Supply & fixing of PVC low level system with internal components & short bend: 10 Litres capacity Single Flush including Cost and Conveyance of all materials,labour complete etc.
2
2045
4090
... More
Construction of 2nd floor to Community Hall;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with 'S' trap including Cost and Conveyance of all materials,labour complete etc. (TBSP-E.II-020)
2
2102
4204
... More
Construction of 2nd floor to Community Hall;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 630 x 450 mm - Single C.P. Pillar cock
1
2929
2929
... More
Construction of 2nd floor to Community Hall;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks
2000
10
20000
... More
Construction of 2nd floor to Community Hall;Pre Laminated Cement Bonded Particle Board WINDOWS ? Double shutter 3?0? x 3?0? outer frame section size of 50mm x 60mm shutter frame section size of 48mm x 25mm Mullion section size of 50mm x 60mm for outer frame.
7.2
8024
57773
... More
Construction of 2nd floor to Community Hall;Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, 2 Coats (All Colours) including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work(Qty as per Plastering)
916
159
146047
... More
Construction of 2nd floor to Community Hall;Painting with synthetic enamel paint in all shades Grade-I two coats including cost and conveyance of Synthatic enamel paint ( at 20Sqm /Lr as per British paints(I) Ltd.,) , labour charges, etc., complete for new iron work
200
120
24144
... More
Construction of 2nd floor to Community Hall;Supply and fixing of MS gate/ Window grills, Iron doors/ Iron windows as approved by the dept officers including cost and conveyance of metarials, fabrication charges, cost of welding rods, power charges, labour charges for fixing of gate in position etc complete (SSR item)
280
110
30800
... More
Construction of 2nd floor to Community Hall;Flooring with Vetrified tiles of1st quality set over base coat of cement mortar (1:8) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete for finished item of work,
130
1273
165550
... More
Construction of 2nd floor to Community Hall;Flooring with 25mm thick Polished Shabad Stones / Thandur rough stone slab set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of floorings tones etc., complete for finished item of work, but excluding the cost of conveyance of all materials for finished item of work
30
799
23994
... More
Construction of 2nd floor to Community Hall;Supply and filling with good gravel (exluding rock) in trenches sides of foundations and basement with intial lead inlayers not exceeding 15 cms thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges hire charges of T & P etc., coplete for finished tiem of work
13.5
445
6017
... More
Construction of 2nd floor to Community Hall;Supply, Delivery and Fixing of 160mm dia PVC pipes for potable water supplies conforming to IS:4985/2000 with bell ends(Socket) as per specification in casing pipe 4Kg/Sqcm etc., complete including cost and conveyance of all materials for finished item of work(SSR-13-14,PGNO;59)
50
385
19250
... More
Construction of 2nd floor to Community Hall;Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials. {50% natural river sand + 50% rock sand}
60
1119
67166
... More
Construction of 2nd floor to Community Hall;Powder Coated Mild Steel Hallow single rebate door frames manufactured using cold roll formed process steel sheet of 1.25 mm thick bright (Cold Rolled Close Annealed (CRCA) and profile size of 105 x 60 mm conforming to IS 4351 - 2003 including pre-treatment, Galvanized as per IS:277, zinc phosphating finished with hermosetting Polyurethane paint of Aliphatic Grade providing high levels of scratch resistance and durability/Epoxy polyester powder for powdercoating paint thickness 60 ? 65 microns(Dry filmthickness)Stainless Steel Ball Bearing Butt Hinges3 mm thick fixed flush to the frame with Hinges, Base Ties, Holdfast Lugs, Mortar Guards, shock absorbers and provision for Tower Bolts, Aldrops, Lock & Strike plates etc. for both single and dou ble shutter doors.
19.2
732
14054
... More
Construction of 2nd floor to Community Hall;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost and conveyance of all materials, seigniorage charges, including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
120
612
73524
... More
Construction of 2nd floor to Community Hall;Flush door shutters, solid bond wood block board type with teak ply on both faces.: 35 mm thick conforming to IS:2202 .including Cost and Conveyance of all materials,labour complete etc.
11.52
2300
26496
... More
Construction of 2nd floor to Community Hall;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, including cost of all materail like HYSD bars, binding wire and labour charges for cutting, bending, shifting to site, tying etc.. where they are not welded.
3531.4
58
207964
... More
Construction of 2nd floor to Community Hall;Plastering 12mm thick in two coats with base coat of 8mm thick in C.M. (1:6) and topcoat of 4mm thick in C.M (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand,. Water, etc., to site, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls {50% natural river sand + 50% rock sand}
388
554
215057
... More
Construction of 2nd floor to Community Hall;Plastering 20mm thick in two coats with base coat of 16mm thick in C.M. (1:6) and topcoat of 4mm thick in C.M (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand,. Water, etc., to site, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls {50% natural river sand + 50% rock sand}
528
573
302956
... More
Construction of 2nd floor to Community Hall;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site Cost of Seigniorage Charges on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. , per 1 Cum.
61.68
7789
480466
... More
Construction of 2nd floor to Community Hall;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal ----------Roof slab of 150mm thick WAITING HALL
100
1831
183191
... More
Construction of 2nd floor to Community Hall;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal ----------Lintels for windows
0.58
14574
8453
... More
Construction of 2nd floor to Community Hall;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal ---------Roof Beams( WAITING HALL )
6.21
13840
85948
... More
Construction of 2nd floor to Community Hall;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal------- Columns
3.65
14870
54205
... More
Construction of 2nd floor to Community Hall;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrating, centring curing etc.,complete but excluding cost of steel and its fabrication charges and shuttering charges for finished item of work. - Stair 150mm thick
28.2
1831
51660
... More
Construction of 2nd floor to Community Hall;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth
72
293
21097
... More
Construction of 2nd floor to Community Hall;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH
12
885
10626
... More
Construction of 2nd floor to Community Hall;Item Detailed Specification Description
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements