Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Civil And Construction
Building Construction
Opening Date22 Jul 2024
Closing Date25 Jul 2024
Tender Amount₹ 14,44,550
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
530156Tender No
NIT No. 04/DB/EE/Quthbullapur Circle-25/GHMC/2024-25 Dated: 18.06.2024 (Item No. 04)Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Civil works;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and overflow pipes but without fittings & base support for tanks (SSR 2023-24, Pg no: 291, Item no:TBSP-H.II-01, Sl. no: 537)
2000
10
20000
... More
Civil works;Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work (DATA - January 2024)
304.62
146
44511
... More
Civil works;Providing and applying synthetic plaster putty or equivalent putty such as birla wall care putty or texture paint or equivalent such as NCL/ Saicoat texture paint of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls - excluding cost of access scaffolding (DATA - January 2024)
144.21
437
63059
... More
Civil works;Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for Internal walls (DATA - January 2024)
144.21
242
34929
... More
Civil works;Plastering with CM (1:3), 20 mm thick including cost and conveyance of all materials etc complete for finished item of work (DATA - January 2024)
304.62
301
91898
... More
Civil works;Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23 x 11 x 7 cms including cost and conveyance of all materials etc complete for finished item of work (DATA - January 2024)
23.4
7624
178418
... More
Civil works;Supplying and fixing of 28/30 mm thick Wood Plastic Composite (WPC) Door shutter, comprising of 70% virgin polymer, 15% wood powder (fibre), and the remaining 15% additives, comprising of virgin PVC polymer of K value 58-60 (Suspension grade), Calcium carbonate and natural fibres (wood powder) and nontoxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650 kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws all as per direction of Engineer -in- Charge (SS butt hinges and SS screws shall be paid separately) (SSR 2023-24, Pg no: 144, Item no: TBSC-L.I-18, Sl. no: 552)
6.3
2138
13469
... More
Civil works;Providing and fixing factory-made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast. (SSR 2023-24, Pg no: 144, Item no: TBSC-L.I-17, Sl. no: 551)
14.4
777
11189
... More
Civil works;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work (DATA - January 2024)
60
589
35375
... More
Civil works;Plain Cement concrete Grade M20 - Nominal Mix using 20mm metal with hand mixing including cost and conveyance of all materials etc complete for finished item of work (DATA - January 2024)
6
6368
38213
... More
Civil works;Collection and supply and spreading of gravel including watering and rolling with Hand roller irresppective of thickness to achive the desired dencity as per Technical specification and excluding Seigniorage charges (DATA - January 2024)
54
442
23879
... More
Civil works;Flush Pointing with CM (1:3) to RR Masonry including cost and conveyance of all materials etc complete for finished item of work (DATA - January 2024)
28.5
111
3165
... More
Civil works;RR Masonry in CM (1:6) including cost and conveyance of all materials etc complete for finished item of work (DATA - January 2024)
17.1
4520
77302
... More
Civil works;Supply, Transportation of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM( tolerance as per IS:374-2019), THD less than 10%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete. Makes : Atomberg (Efficio ) / Havells / Orient / Halonix (SSR 2023-24, Pg no: 380, Item no: ELEC- 5.1.1 , Sl. no: 1016)
10
3084
30840
... More
Civil works;Supply and transportation of 22W +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS (SSR 2023-24, Pg no: 365, Item no: ELEC-3.5.16 , Sl. no: 776)
15
646
9690
... More
Civil works;Supplying, fitting and placing HYSD Fe 500 Grade steel for RCC works complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, including cost of all materail like HYSD bars, binding wire, chairs, space bars and all labour charges for cutting, bending, placing position, shifting to site, tying etc.. complete where they are not welded (DATA - January 2024)
1663.2
70
116590
... More
Civil works;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and encluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but inccluding centering, shuttering.Unsupported Height up to 3.66 M Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc., (DATA - January 2024) For Roof Slab
9
11440
102962
... More
Civil works;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and encluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but inccluding centering, shuttering.Unsupported Height up to 3.66 M Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc., (DATA - January 2024) For Roof Beams
5.13
12859
65967
... More
Civil works;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and encluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but inccluding centering, shuttering.Unsupported Height up to 3.66 M Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc., (DATA - January 2024) For Columns
2.92
13927
40613
... More
Civil works;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and encluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but inccluding centering, shuttering.Unsupported Height up to 3.66 M Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc., (DATA - January 2024) For Plinth Beams
5.13
12841
65876
... More
Civil works;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and encluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but inccluding centering, shuttering.Unsupported Height up to 3.66 M Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc., (DATA - January 2024) For Pedestals
2.88
10677
30751
... More
Civil works;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and encluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but inccluding centering, shuttering.Unsupported Height up to 3.66 M Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc., (DATA - January 2024) For Footings
8.1
9970
80761
... More
Civil works;Plain Cement concrete (1:4:8) using 40 mm metal with hand mixing upto Plinth level including cost and conveyance of all materials etc complete for finished item of work. (DATA - January 2024)
17.16
4904
84176
... More
Civil works;Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth (DATA - January 2024)
47.3
264
12533
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements