Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Building Construction
Opening Date9 Feb 2024
Closing Date13 Feb 2024
Tender Amount₹ 21,63,927 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of 1st floor on the existing building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering - Roof Beams

6.62

12669

83921

... More
Construction of 1st floor on the existing building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering - Slab (125 mm thick)

96

1516

145580

... More
Construction of 1st floor on the existing building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering - Steps

1.51

1516

2294

... More
Construction of 1st floor on the existing building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering - Lintels

1.21

13418

16244

... More
Construction of 1st floor on the existing building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering - Sunshades

0.89

13418

11951

... More
Construction of 1st floor on the existing building;Supply and fabrication of HYSD Fe 415 Grade steel including cost and conveyance to site and labour charges including cutting, bending, fabrication of reinforcement including cost of binding wire, etc complete for 1Kg.

10859.76

69

756925

... More
Construction of 1st floor on the existing building;NCL or Equivalent Sliding Windows and doors Providing and Fixing Sliding Window fabricated from Roll formed sections made of galvanized Steel colour coated/powder coated (Base Steel as per IS 513 ?D? quality galvanized as per IS 277 with zinc of 120 GM/Sq.mtr) with total coated thickness of 0.60mm. Primer coat with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with Alkyd backer of 5-7 microns or powder coated with pure polyester powder up to 50-60 microns thick. Section for external frame bottom should be of 79x44mm, external frame sides and top should be of 69x24mm, guide for top and bottom should be of 69x26mm (Stainless Steel). Section for shutter should be of 26x30mm. The windows should be panelled with 5mm thick plain float glass. Corner bracket for internal and external frame made of glass filled nylon. Gaskets are to be made of Ethyl Propylene Diamine Monomer (EPDM).The sections are to be cut to length, joined and assembled by means of corner bracket. The above frames should be fixed to the concrete/masonry walls by means of self expanding brackets & screws including 10mm square guard bars with 6? pitch (152_4mm) and all Taxes complete for finished item of work WINDOWS Double shutter 4? -6? x 4? -6? (1371_6 x 1371_6mm) outer frame section size of 46 x 52 mm shutter frame section size of 46 x 46mm Mullion section size of 46 x 70 mm BMTP39 as per SSR 2012-13

28.98

6273

181792

... More
Construction of 1st floor on the existing building;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site Cost of Seigniorage Charges on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. (S.S. No. 504), per 1 Cum.

38.02

7526

286167

... More
Construction of 1st floor on the existing building;Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site cost of seigniorage charges on all materials , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (As per S.S. 904) per 10 Sqm.

461.4

5216

240675

... More
Construction of 1st floor on the existing building;Flooring with 15 to 18 mm thick polished shabad stones set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

166

7561

125516

... More
Construction of 1st floor on the existing building;Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls on new plastered surface

461.4

2504

115579

... More
Construction of 1st floor on the existing building;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

96

5625

54008

... More
Construction of 1st floor on the existing building;S& F 15 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete

50

194

9700

... More
Construction of 1st floor on the existing building;S& F 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete

50

293

14650

... More
Construction of 1st floor on the existing building;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

1000

9

9000

... More
Construction of 1st floor on the existing building;Supply of ISI 20mm dia 1.5mm thickness PVC pipe of makes Sudhakar / Maco Plast / Modi.

65

23

1495

... More
Construction of 1st floor on the existing building;Supply of ISI 25mm dia 1.5mm thickness PVC pipe of makes Sudhakar / Maco Plast / Modi.

75

30

2250

... More
Construction of 1st floor on the existing building;Supply of 12 Module box vertical.

10

258

2580

... More
Construction of 1st floor on the existing building;Supply of 14/0.3mm (1.0 Sqmm) FR / FRLS PVC insulated ISI Copper cable of makes Pawancab / Star / Milltec / Fine Cab / Payal / Sunlight / Bentec / Gemscab.

400

21

8748

... More
Construction of 1st floor on the existing building;Supply of 36/0.3mm (2.5 Sqmm) FR / FRLS PVC insulated ISI Copper cable of makes Pawancab / Star / Milltec / Fine Cab / Payal / Sunlight / Bentec / Gemscab.

250

35

8838

... More
Construction of 1st floor on the existing building;Supply of 6A / 10A 1 Way Modular Switch of Crabtree / Feno Swtch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale.

20

116

2320

... More
Construction of 1st floor on the existing building;Supply of Electronic Regulator of Modular of Crabtree / Feno Swtch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale.

4

242

968

... More
Construction of 1st floor on the existing building;Supply of 6-32A 10KA SP MCB ISI Mark of make Legrand / L & T / GE / Siemens / Schneider/ ABB.

4

294

1176

... More
Construction of 1st floor on the existing building;Supply of 12 Way SPN DB with IP 20 Protection of makes Legrand / L & T / GE / Siemens / Schneider/ ABB.

1

1165

1165

... More
Construction of 1st floor on the existing building;Supply of 1 x 36/40W Box type tube light luminaire powder coated CRCA sheet steel housing with VPIT Chokes and all standard accessories of makes Crompton / Bajaj / HPL / Surya / Havells.

10

280

2800

... More
Construction of 1st floor on the existing building;Supply of 48" (1200mm) Sweep Ceiling Fan without Regulator.of makes Crompton / Bajaj / Orient /Usha with 5 Star rating.

8

2882

23056

... More
Construction of 1st floor on the existing building;Supply of 6 Sqmm 7/18 WPSC (Weather Proof Single Core ) ISI Alluminium Wire of makes Finolex / Polycab / Gold Medal / Million / Payal / Power Flex.

1000

17

17640



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.