Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
533019Tender No
SO.No R/1580/UB/23-24Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Avenue Plantation;Engaging of water tankers for watering through tankers of 5000 ltrs each trip capacity ( 5 trips per day- 25000 ltrs) 3350 x 20 ltrs x 43/25000=115.24tankers (July - November = 2x5 = (10) (December = 3 (Jan - Feb = 4x2 = (8) (March = 5 April-May= 6x2 = (12), June= 5
115.24
3352
386319.05
Avenue Plantation;Replacement of casualities to a maximum of 20% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (10"x16" / 14" x 15" Tall Plants) only after verification by the DUB for survivials replacements shall be taken up in the month of Oct. If any casualities during the year, the Contractor agency has to taken up the gap filling plantation to the extent of dead at his own cost and must show 100% survival
670
2261
15148.7
Avenue Plantation;Application of chemicals and fertilizers/Neem Cake etc (2 doses)
3350
293
9846.32
Avenue Plantation;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)
3350
-
6700
Avenue Plantation;Application of Folidol/Lindane dust (10%) @ 20 gms/pit/dose (2 doses)
3350
57
1912.85
Avenue Plantation;Cost of Folidol/Lindane dust (10%) @ 20 gms/pit
3350
-
3350
Avenue Plantation;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants
3350
28
93800
Avenue Plantation;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (10"x16" / 14" x 15" bag plants)
3350
2139
71663.2
Avenue Plantation;Internal transporation of Bag plants to planting site
3350
608
20382.74
Avenue Plantation;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (10"x16" / 14" x 15" bag size)
3350
861
28856.56
Avenue Plantation;Application of FYM including internal distribution in red soil areas 60 cm pit
3350
247
8290.04
Avenue Plantation;Cost and conveyance of well-decomposed Farmyard manure to planting site 60 cm cube (0.50 cft/pit)
3350
2558
85717.46
Avenue Plantation;Digging of pits 0.60 mt X 0.60 mt X 0.60 mt
3350
6761
226500.74
Avenue Plantation;Alignment and staking including cost of stakes
3350
97
3252.51