Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Civil And Construction
Building Construction
Opening Date17 Oct 2024
Closing Soon25 Oct 2024
Tender Amount₹ 2,80,057
Costs
EMD
₹ 2,801Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
551517Tender No
NIT No. 18/EE-30/SD Z/GHMC/2024-2025 (Item 4) Dt.16-10-2024Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Construction of New toilet room;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in T.G., F.O.R. destination including, loading, un-loading & stacking at site but excluding all taxes, as applicable. I.S.I Mark H.D.-20 with 500mm diaclear opening
2
2533
5066
Construction of New toilet room;Supply and placing of the Ready Mix Concrete (RMC) M20 grade Standard Design Mix Concretegrade as per IS4926- 2003 with minimum cement content as per IScode456- 2000 using 20mm graded metal, from standard suppliers approved by the department including pumping, laying concrete, centering, shuttering vibrating / screed / pan vibrating, curing etc. complete but excluding cost of steel and its fabrication charges, for finished item of work. (M20-300Kgs) {50% natural river sand + 50% rock sand}
2.52
4765
12009
Construction of New toilet room;Painting with synthetic enamel paint in all shades Grade-I two coats including cost and conveyance of Synthatic enamel paint ( at 20Sqm /Lr as per British paints(I) Ltd.,) , labour charges, etc., complete for new iron work Doors
3.78
126
478
Construction of New toilet room;Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, 2 Coats (All Colours) including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work
45.6
184
8427
Construction of New toilet room;Dadooing to internal walls with glazed red or white full body ceramic wall tiles of size 300 x 600 mm and thickness between 6-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs ,set over base coat of CM(1:3)12mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth,including cost of all materials like tiles,cement,sand and wateretc.,complete for finished item of work (data similar to Providing skirting to internal walls to 15cm height /risers of steps with ceramic tiles 7.30mm thick length equal to flooring stones,)
15.12
803
12148
Construction of New toilet room;Flooring with Non-skid red or white full body Ceramic floor tiles of size 400 x 400 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over base coat of cement mortar (1:8) ,12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished item of work,
12.2
937
11438
Construction of New toilet room;Supply of 9" (225mm +/ - 5%) Light duty exhaust fan with metal blades etc complete Makes : Crompton / Havells Ventilair-DB / Orient hill air ELEC-5.1.14
1
1555
1555
Construction of New toilet room;Supply of Pendent Holder / Adopter. Makes : GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL ELEC-1.7.1
3
25
75
Construction of New toilet room;Supply of 6A 1 Way flush type Swich. Makes : GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL. ELEC-1.7.1
5
20
100
Construction of New toilet room;Supply of 1.0 Sqmm FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI / LK (L&T) / V-Guard. ELEC-10.2.8
1
1343
1343
Construction of New toilet room;Manufacture, Supply and Delivery of Unplasticised PVCs Pipes for potable water supplies conforming to IS : 4985/2000 (3rd revision) with bell ends (Socket) as per specification in light Grey/Natural Ivory Grey/ Any other Color (except White) inclusive of transportation to the sub-divisional stores anywhere in TG excluding Taxes 110 MM dia 10.0 Kgs/cm2
8
413
3304
Construction of New toilet room;Supply of 25mm PPR Ball Valve conforming to DIN Standards 8077/8092 TBSP-J.III-185
2
267
534
Construction of New toilet room;S&F of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 years warranty TBSP-F.I-07
3
3528
10584
Construction of New toilet room;Supplying and fixing of 28/30 mm thick Wood Plastic Composite (WPC) Door shutter, comprising of 70% virgin polymer, 15% wood powder (fibre), and the remaining 15% additives, comprising of virgin PVC polymer of K value 58-60 (Suspension grade), Calcium carbonate and natural fibres (wood powder) and nontoxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650 kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws all as per direction of Engineer -in- Charge (SS butt hinges and SS screws shall be paid separately) TBSC-L.I-18
3.78
2138
8082
Construction of New toilet room;Providing and fixing factory-made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast. TBSC-L.I-17
4
777
3108
Construction of New toilet room;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 8931 TBSP-F.I-02
2
661
1322
Construction of New toilet room;S&F of 15 mm brass body CP finish two-way bib tap of not less than 400 grams weight with quarter turn spindle internal/ external threaded connection conforming to IS 8931 TBSP-F.I-05
2
944
1888
Construction of New toilet room;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 660 x 460 mm - Single C.P. Pillar cock TBSP-E.VI-0
2
3991
7982
Construction of New toilet room;Supplying & Fixing low-down porcelain flushing tank with lid 10 Lit Capacity with internal components TBSP-E.IV-01
1
3157
3157
Construction of New toilet room;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with 'S' trap TBSP-E.II-02
1
2102
2102
Construction of New toilet room;Supply of premium make CPVC Pipes of 22.20mm OD Pipe- SDR 13.5 (TBSP-J.III-02)
21
178
3738
Construction of New toilet room;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part- 1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3prop; ½?thickbothinsideand outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification (TBSP-B.I-02)
2
14087
28174
Construction of New toilet room;Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. Including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and refilling with watering and tamping. TBSP-A.I-01
28
617
17276
Construction of New toilet room;Plastering 20mm thick in two coats with base coat of 16mm thick in C.M. (1:6) and topcoat of 4mm thick in C.M (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand,. Water, etc., to site, cost of seigniorage charges on all materials, all taxes, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls
34.2
571
19539
Construction of New toilet room;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site Cost of Seigniorage Charges on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. , per 1 Cum.
3.93
7874
30946
Construction of New toilet room;Carting of excavated earth with a lead of about 14 KMts, including cost and conveyance of all materials and all labour charges, contractor profit and over head charges etc., complete for finished item of work as directed.
14.37
241
3466
Construction of New toilet room;Flush Pointing to RR Masonary in Cement Mortor 1:3 Prop . including cost & conveyance of all materials like cement, sand to site including cost of seignaiorage charges on all materials, all taxes, labour charges on all materials, curing etc., Complete for finished item of work.
5.4
115
626
Construction of New toilet room;Randum Rubble Masonry in Cement Mortor 1:6 Prop using hard granite (CR stone), Rough stone, Bond stones including Cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones,Rough stone, bond stone etc.,including Labour charges for cutting Stones to required size and shape at mixing of Cement Mortor Construction, Scaffolding, lift and curing Charges etc., Complete for Finished item of Work .Per 1 Cum {50% natural river sand + 50% rock sand}
2.43
4628
11247
Construction of New toilet room;Plain Cement Concrete (1:2:4) nominal mix using 20mm metal with hand mixing using 324kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, and Labour Charges , hire charges of macinery , laying Concrete tamping, lifting, curing, finishing but excluding Centering Shuttering Charges Etc., Complete for finished item of Work.1 Cum. For Benching Only
1.68
6025
10122
Construction of New toilet room;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth
10.98
293
3217
Construction of New toilet room;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH (cement concrete)
3.39
885
3002
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%