For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Civil And Construction
Drainage Work
Opening Date5 Mar 2025
Closing Soon19 Mar 2025
Tender Amount₹ 96,30,830
Costs
EMD
₹ 96,308Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
579589Tender No
NIT No.26/17/SE-M/LBNZ/GHMC/J2&J3/2024-25, date:01.03.2025Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
RCC Box Drain;Carting of dismantled material of CRS Wall and existing structures , silt and sludge from sullage drains to an initial lead 10 KM from site of work including loading, unloading, & conveyance charges etc., complete finished item of work
1318.8
204
269035.2
... More
RCC Box Drain;Filling with Crusher Stone dust finer than 3mm with not more than 10% passing 0.075 sieve, including supply and delivery of crusher stone dust finer than 3mm for filling, including cost of crusher stone dust, seinourage charges and conveyance to site, filling charges, watering, tamping and rammming and all labour charges and operational charges complete as directed by the Departmental officers.
99.75
1192
118966.84
... More
RCC Box Drain;Supply and placing of Ready Mix Concrete M10 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design
63
4958
312356.52
... More
RCC Box Drain;Supply and placing of RCC M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design -Bottom slab
113.92
5724
652169.36
... More
RCC Box Drain;Supply and placing of RCC M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design-Side walls
126
8494
1070346.06
... More
RCC Box Drain;Supply and placing of RCC M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design-Top slab
97.65
8273
807903.37
... More
RCC Box Drain;Supply and placing of RCC M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design-Bottom slab
75.95
5724
434779.57
... More
RCC Box Drain;Supply and placing of RCC M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design-Side walls
84
8494
713564.04
... More
RCC Box Drain;Supply and placing of RCC M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design-Top slab
65.1
8273
538602.25
... More
RCC Box Drain;Dewatering from pipe line trenches with oil engine drain pumpsets including hire charges fuel charges and wages for helper etc, complete (5 HP diesel)
120
377
45240
... More
RCC Box Drain;Supplying, fitting and placing HYSD Fe 500 Grade steel for RCC works complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, including cost of all materail like HYSD bars, binding wire, chairs, space bars and all labour charges for cutting, bending, placing position, shifting to site, tying etc.. complete where they are not welded
56262.5
66
3764523.88
... More
RCC Box Drain;Providing barricading arrangement with casurina ballies as per design duly excavating pits and its removal after the function is over including hire charges of the barricading materials as per the schedule given by the departmernt authorities complete for finished item of work.
210
200
42126
... More
RCC Box Drain;Filling with Earth filling (ordinary soil) useful excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
329.7
62
20480.96
... More
RCC Box Drain;Supply & Delivery of 750x750 mm DI Cover with frame - 130kgs i/c cost and conveyance of materials, labour charges etc..,
12
19800
237600
... More
RCC Box Drain;TBSP-A.II-05:- Supply & delivery of SWG (I.S) 651-1992 pipe including cost and conveyanceo of materials, loading unloading & stacking at site etc, complete (300mm dia pipes)
25
1579
39475
... More
RCC Box Drain;Lowering of 300 mm dia SWG pipe as per I.S. 651 of 1992 carefully into trenches and laying in ready made trenches true to alignment gradient jointing with cement mortar (1:1) prop: curing and testing of stone ware pipes for sewer lines including cost and conveyance of all materials, incidental charges etc., complete.
25
482
12070.25
... More
RCC Box Drain;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in A.P., F.O.R. destination including, loading, un-loading & stacking at site but excluding central excise duty, sales tax, octroi and other Govt levies etc., as applicable. I.S.I Mark H.D.-20 with 500mm dia clear opening
15
2533
37995
... More
RCC Box Drain;Construction of 0.90mt circular sewer manhole of 0.90 mts depth with cement bricks in CM 1:4 prop carbelling including CC bed ( 1:4:8 ) prop using 40 mm gauge HG Metal 0.23 mt thick and CC benching /chanelling in CM 1:2:4 prop with internal plastering 20 mm thick CM 1:3 and external plastering 12mm thick CM 1:3 with fine rendering including cost and fixing of Encapsulated Plastic steps 2 Nos and fixing of cover and frame but excluding the cost of cover and frame . including the cost and conveyance of all materials, all taxes, seigniorage charges and curing for 21 days etc., complete as per specification
5
12777
63886.95
... More
RCC Box Drain;Additional manhole 0.10 mt depth of 0.90mt.(Circular) sewer manhole internal plastering 20mm thick in CM 1:3 and external plastering 12mm thick in CM 1:3 with fine rendering including cost and fixing of Encapsulated Plastic steps 1 No including the cost and conveyance of all materials, all taxes, seigniorage charges and curing for 21 days etc., complete as per specification
25
1073
26839
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%