Municipal Administration Department Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Administration Department Tender

Works
Civil And Construction
Civil Works Others
Excavation
Opening Date5 May 2025
Closing Date8 May 2025
Tender Amount₹ 7,21,071 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Balance work of Park;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate : coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials , labour charges , for mixing , laying, concrete , remming 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work for foundation and under flooring bed

0.68

4683

3184.87

... More
Balance work of Park;Supply and Delivery of Kadamba plant

30

400

12000

... More
Balance work of Park;TBSP-G.I-12- S& F 50 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings &labour charges complete

108

621

67118.76

... More
Balance work of Park;Plain Cement Concrete (1:5:10) using 40 mm metal with Concrete Mixture. All work upto Plinth Level including cost and conveyance of all materials and labour charges etc., complete

8.1

4506

36506.17

... More
Balance work of Park;Supply and Delivery of Neel Mohar plant

30

500

15000

... More
Balance work of Park;BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS

0.5

13552

6776.44

... More
Balance work of Park;Earthwork in Excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 mm dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for Drain Foundations

43.95

285

12541.92

... More
Balance work of Park;TBSC-E.II-07- Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 4"x4" (102 mm x 102 mm) - 8 Gauge

135

345

46627.6

... More
Balance work of Park;TBSC-U.I-01 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar

18

720

12965.72

... More
Balance work of Park;BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS

0.86

10151

8730.53

... More
Balance work of Park;Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal angles horizontal supports at 0.50m c/c, 2.00mm MS sheet at bottom 0.30m height and 12mm MS square bars Vertically at 125mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting gate with one coat of red oxide primer including cost and conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.

200

126

25256

... More
Balance work of Park;BLD-CSTN-4-1- (34) ; Providing High Yield Strength Deformed (HYSD)/Thermo Mechanically Treated (TMT)/ Mild steel (MS) steel bars (Fe 415/Fe 500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting , bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and typing and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastges such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position , tying including sales and other taxes on all materials

127.44

77

9849.84

... More
Balance work of Park;Supply and Delivery of Indian Cork Tree

50

400

20000

... More
Balance work of Park;Supply and Delivery of golden Bougainvillea plant

30

150

4500

... More
Balance work of Park;Supply and Delivery of golden Justicia carnea plant

50

150

7500

... More
Balance work of Park;Supply and Delivery of Indian Champa (Arhata Ganneru)

30

500

15000

... More
Balance work of Park;Supply and Delivery of golden Shower tree plant

10

400

4000

... More
Balance work of Park;Supply and Delivery of golden Red-tip-photinia plant

50

150

7500

... More
Balance work of Park;RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

80

337

27027.2



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.