Municipal Administration Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Administration Department Tender

Works
Civil And Construction
Opening Date21 Sep 2024
Closing Date27 Sep 2024
Tender Amount₹ 7,98,626 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CONSTRUCTION OF COMMITTEE HALL;Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete as directed by the Engineer-in-Charge. Copper Cable Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI / L&T / V-Guard.

50

26

1335

... More
CONSTRUCTION OF COMMITTEE HALL;Supply and run of 2 of 22/0.3mm (1.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete as directed by the Engineer-in-Charge. Copper Cable Makes : Finolex / RR kabel / Havells /Polycab /Beljin (HFFR) /Ollvin(HFFR) / Finecab Gold (HFFR) / GM(HFFR) / Gold Medal(HFFR) / Million(HFFR) / KEI (HFFR) / V-Guard (HFFR)./ DEC (FRLS / HFFR) /Bonton (HFFR) and Avocab (HFFR) /Fortune Arrt (HFFR) / SPM (HFFR) /Sudhakar (HFFR) / Nakoda (HFFR) / HPL (HFFR) / GLOSTER (HFFR) / Rajnigandha (HFFR) / Pawancab (HFFR) / South King(HFFR)

50

74

3728

... More
CONSTRUCTION OF COMMITTEE HALL;Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete as directed by the Engineer-in-Charge. Copper Cable Makes : Finolex / RR kabel / Havells /Polycab /Beljin (HFFR) /Ollvin(HFFR) / Finecab Gold (HFFR) / GM(HFFR) / Gold Medal(HFFR) / Million(HFFR) / KEI (HFFR) / V-Guard (HFFR)./ DEC (FRLS / HFFR) /Bonton (HFFR) and Avocab (HFFR) /Fortune Arrt (HFFR) / SPM (HFFR) /Sudhakar (HFFR) / Nakoda (HFFR) / HPL (HFFR) / GLOSTER (HFFR) / Rajnigandha (HFFR) / Pawancab (HFFR) / South King(HFFR)

50

104

5218

... More
CONSTRUCTION OF COMMITTEE HALL;Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete as directed by the Engineer-in-Charge. Switch & Socket Makes: GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry /Great white Omega / HPL / Vimal / CPL. 2.1.4

2

158

317

... More
CONSTRUCTION OF COMMITTEE HALL;ELEC-3.4.6: Supply of 28W T5 \fluorescent tube Makes: Crompton/Bajaj/Philips/Surya/Havells

2

107

214

... More
CONSTRUCTION OF COMMITTEE HALL;Supply and Fixing of 20mm dia 1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete as directed by the Engineer-in-Charge. (Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast /Gold / Polycab / DEC / Beljin / Champion/ Austro)

57.5

106

6097

... More
CONSTRUCTION OF COMMITTEE HALL;Supply and Fixing of 25mm dia 1.5mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains. (Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast /Gold / Polycab / DEC / Beljin / Champion/ Austro) 1.3.2

55

92

5067

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

1780

80

143183

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-9-18-(116): Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work,including the cost and conveyance of all materials.

4.51

630

2845

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-9-1-(99) -A: Flooring with Polished Mable slabs of any variety and gang saw cut (such as Dongari/Adanga/Marodh/Rajgangpur etc) stones 1st class 16 to 20 mm thick average thick (0.610m width of any length set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.

16.96

2315

39266

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-9-5-(103) : Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc. including seigniorage charges, etc., complete for finished item of work, including the cost and conveyance of all materials.

37.42

1177

44066

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-8-2-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.

58.45

232

13618

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-8-10-(85) : Plastering 12mm thick in two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (Internal walls)

35.4

586

20776

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-8-9-(84) : Plastering 20mm thick in two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls)

56.26

615

34620

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

5.78

8470

48957

... More
CONSTRUCTION OF COMMITTEE HALL;Amendment 2021-22 BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

14.97

488

7310

... More
CONSTRUCTION OF COMMITTEE HALL;Amendment 2021-22 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

28.77

42

1214

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS (using Steel Scaffolding) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted. Stair Case Waist Slab 150 mm thick

2.16

12463

26920

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS (using Steel Scaffolding) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted. RCC Slab 125 mm thick

3.32

13362

44362

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS (using Steel Scaffolding) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted. RCC Beam

2.45

13914

34090

... More
CONSTRUCTION OF COMMITTEE HALL;RCC M20 for Sun Shades of 0.60m width, 75mm thick at fixed end and 50mm thick at free end

0.11

12022

1322

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted. Lintels

0.67

15273

10233

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted. Columns

2.42

15056

36437

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted Plnth Beam

1.71

14676

25097

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted Pedestals

0.73

12329

9001

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted Footings

8.53

11703

99831

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work

5.16

5210

26886

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work

6.76

5210

35222

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-3-5 (22) - Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

8.13

5452

44332

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-2-11 ; (New Item) : Earth work excavation Hard rock (blasting prohibited)-Up to 3 m depth using Hydraulic Excavator with Breaker Attachment for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage anf dewatering charges etc as per SS - 20 B (APSS 308)

4.86

1020

4962

... More
CONSTRUCTION OF COMMITTEE HALL;BLD-CSTN-2-2(10) : Earth work excavation in Ordinary soils by Mechcanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

43.72

129

5656



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.