Municipal Administration Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Administration Department Tender
Civil And Construction
Building Construction
Opening Date14 Aug 2023
Closing Date21 Aug 2023
Tender Amount₹ 8,21,170
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
448260Bid Award Id
ViewTender No
E1/07/ACPT/2023, Dt:14.08.2023Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
construction of Dudekula Bhavan;Supply and fixing of 6A ISI Mark 3/2 pin Modular socket with 6A 1way Module Switch with shutter on a commam switch board with earth continuty including wire leads, earth connections along with all lobour charges etc,.complete.Makes Switchs: leagrand arteor/Schneider zen/
4
337
1348
... More
construction of Dudekula Bhavan;supply and run of 22/0.3mm(1.5 sq.mm) FR P.V.C.insulated flexible copper cable in existing pipe for earth continuty including all labour charges etc.,complete (Makes:Sudhakar/Finolex/Modi/VIP/Precision/Universal/Million Plast/Polycab/DEC)
50
36
1824
... More
construction of Dudekula Bhavan;wiring with 2 runs of 22/0.3mm (1.5 sq.mm)fire Retardant (FR) P.V.C insulated flexible copper cable (ISI Mark) in existing pipe with including supply of 6 module box, cover frame ,6A/10A 1 way 1 module modular switch and 3 Plate jumbo ceiling rose .including all labour charges etc,.. completed for light,bell,fan and exhaust fan points in non-residential buildings and as per 2.2.2 of standard revised data of BLD-ELEC-2-1.1(Makes:Sudhakar/Finolex/Modi/VIP/Precision/Universal/Million Plast/Polycab/DEC)
10
880
8805
... More
construction of Dudekula Bhavan;Supply and Laying of ISI 25mm outer dia medium grade with IS:9537 part 3 regid PVC Pipe in Roof Slab with all required PVC /Metallic Junction Boxes including Masonry work and labour charges etc ,Makes:Sudhakar/Finolex/Modi/VIP/Precision/Universal/Million Plast/Polycab/DEC
20
90
1814
... More
construction of Dudekula Bhavan;Supply and Laying of ISI 25mm outer dia medium grade with IS:9537 part 3 regid PVC Pipe concealed in wall with all required PVC /Metallic Junction Boxes including Masonry work and labour charges etc,Makes:Sudhakar/Finolex/Modi/VIP/Precision/Universal/Million Plast/Polycab/DEC
20
111
2226
... More
construction of Dudekula Bhavan;Supply and fixing of Pre Laminated Cement Bonded Particle Board (as per IS-14276) WINDOWS with Pre-Painted Steel Sections fabricated from pre-painted Cold rolled formed sections made of galvanized steel color coated sections {Base steel as per 15-512 quality, galvanized as per IS-277 with Zinc of 120 gram/sqm) with total coated thickness of 0.58mm primer coated with epoxy primer of 5-7 microns thick, finish painted with polyester paint of 12-16 microns and back coated with alkyd backer of 5-7 microns), the sections for outer frame and centre mullion (duly filled with PU form of 40 kg/Cum) should be of 60mm x 50mm, with provision for fixing glazed shutter. The section for glazed/paneled shutter should be of size 48mm x 25 mm and another section of size 60mm x 23mm should be provided for separating glazed and paneled portion 5 mm thick colour pin headed glass is to be provided for glazing and providing guard bars of 10mm square rods duly welded at 150mm pitch to MS flat section of size 18mm and 3mm thick. Windows are to be fixed to wall by means of self expansion nylon Cap (75) and electroplated wooden screws of size 100mm, including aluminum powder coated fittings, A)75mm long grip handles 1 no per shutter, B) 75 mm long tower bolts 2 nos. per shutter, C) Heavy duty 55 Pivot hinges 2 nos per shutter, D) MS Powder coated telescopic stay 1no per shutter.including Fixing of all Fixtures etc.com
2.88
9116
26255
... More
construction of Dudekula Bhavan;Supply and fixing of Main door with Double leaf shutters, of size 1.2x1.2m Door with Sal wood Frame of Sections size 100mmx125mm with door Shutter 50mm thick Sal wood including cost of Fixtures such as brass Tower bolts 300mm long 4No's brass handles 150mmlong 4No;s 300mm long brass aldrops 2 nos ,150mm long long brass butt hinges 6no's brass doors stopper 2 No's Ms Hold fasts 8 nos 230mm long
2
12836
25674
... More
construction of Dudekula Bhavan;Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904).
111.58
524
58523
... More
construction of Dudekula Bhavan;Plastering 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including c/c of all materials like cement, sand,water etc., to site, other taxes on all materials, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, etc., complete for for finished item of work . (APSS 1001,1003 & 1004) (CSSR)
119.96
511
61373
... More
construction of Dudekula Bhavan;Plastering 12mm thick in CM (1:4) Prop including Cost and Conveyance of all materials like cement, sand, water etc., to site, including other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, finishing, scaffolding, lift charges, including cutting of Grooves wherever necessary as directed by Engineer-in-charge, curing, etc., complete for finished item of work.(APSS 901& 903 ) for ceiling
145.4
176
25689
... More
construction of Dudekula Bhavan;Brick Masonry in superstructure with CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand(50% of Natural sand +50% of Manufactured sand(Rock Sand), bricks, water etc., to site, excluding seignorage charges, including, Sales & other taxes on all materials, all operational, incidental and labor charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504)
26.35
7866
207290
... More
construction of Dudekula Bhavan;Providing high yield strength deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and Countryes & other taxes,on cost of all materials and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) for finished item of work (APSS No.126) in all floors.
1473
89
131598
... More
construction of Dudekula Bhavan;Plain Cement concrete (1:3:6) using 20 mm metal proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size HBG (SS5) metal from from approved quarry including cost and conveyance of all materials like cement, sand(50% of Natural sand +50% of Manufactured sand(Rock Sand), coarse aggregate, water etc. to site, excluding seignorage charges, including, Sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402)
0.16
4632
741
... More
construction of Dudekula Bhavan;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for sill slabs)
0.18
9350
1683
... More
construction of Dudekula Bhavan;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Platforms&Shelves 50 mm thick)
0.18
9350
1683
... More
construction of Dudekula Bhavan;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Sun Shades)
3
641
1926
... More
construction of Dudekula Bhavan;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Roof slab 125mm thick)
8.24
11438
94253
... More
construction of Dudekula Bhavan;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Roof Beams)
1.58
11948
18879
... More
construction of Dudekula Bhavan;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Lintels)
0.22
12722
2799
... More
construction of Dudekula Bhavan;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Columns)
0.89
12559
11178
... More
construction of Dudekula Bhavan;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Plinth Beam)
1.58
12099
19118
... More
construction of Dudekula Bhavan;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Pedastals)
0.26
9938
2584
... More
construction of Dudekula Bhavan;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for footings)
0.82
9350
7667
... More
construction of Dudekula Bhavan;Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310).
43.12
419
18110
... More
construction of Dudekula Bhavan;CRS Masonry in CM (1:6) 2nd Sort (Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand(50% of Natural sand +50% of Manufactured sand(Rock Sand), water, etc., to site including Sales & other taxes on all materials, all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615) Above Ground level
4.53
4712
21348
... More
construction of Dudekula Bhavan;RR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand(50% of Natural sand +50% of Manufactured sand(Rock Sand), water, etc., to site including Sales & other taxes on all materials, all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615)
4.53
4242
19219
... More
construction of Dudekula Bhavan;Plain Cement concrete (1:5:10) using 40 mm metal with Concrete mixture. using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, sand(50% of Natural sand +50% of Manufactured sand(Rock Sand), coarse aggregate, water etc. to site, including Countryes & other taxes on all materials, all operational, incidental, and labor charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)
6.8
4125
28051
... More
construction of Dudekula Bhavan;Plain Cement concrete (1:4:8) using 40 mm metal with Concrete mixture. using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, sand(50% of Natural sand +50% of Manufactured sand(Rock Sand), coarse aggregate, water etc. to site, including Countryes & other taxes on all materials, all operational, incidental, and labor charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)
0.51
4316
2201
... More
construction of Dudekula Bhavan;Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B (APSS 308)
13.77
270
3724