Municipal Administration Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
527264Bid Award Id
ViewTender No
E1/28/2024-25Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Construction of CC Road and Drain;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical trawelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work.
136
75
10200
Construction of CC Road and Drain;Providing Curing compound, including Spraying at 0.25 ltr/sqm including cost and conveyance of all material and all labour charges etc, complete as directed by the Engineer in Charge
136
42
5794.96
Construction of CC Road and Drain;TBSC-T.I-15 : Saw cut joints for freshly laid concrete pavement including all material and labour charges
45.33
97
4429.19
Construction of CC Road and Drain;BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) Side Berms
6.8
199
1354.08
Construction of CC Road and Drain;BLD-CSTN-2-1(9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308). for Drain (0.35m x 0.5m)
-
-
-
Construction of CC Road and Drain;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipeline trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete
20.27
258
5230.88
Construction of CC Road and Drain;BLD-CSTN-2-2(10) : Earthwork excavation for structures in all types of soil as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification for footings, Sumps,Thrust blocks, Chambers and Man Holes etc. by mechanical means.
47.3
125
5924.32
Construction of CC Road and Drain;RBR-FNDN-2: Collection ,Supply and filling of Coarsed sand from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications.
9.01
1245
11224.84
Construction of CC Road and Drain;RBR-FNDN-4 I(i) -Providing PCC Grade M10 concrete using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH -
9.01
5251
47318.36
Construction of CC Road and Drain;BLD-CSTN-3-11-(28): Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-15 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , s on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement
-
-
-
Construction of CC Road and Drain;Drain base
2.23
5255
11718.9
Construction of CC Road and Drain;Drain walls
23.76
5255
124861.41
Construction of CC Road and Drain;Carting of surplus excavated earth and other material from the site to a distance suitable with a lead of 5 Kms including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete. (70% of excavated earth)
6.76
67
455.62
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements