Municipal Administration Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Administration Department Tender
Civil And Construction
Civil Works Others
Opening Date15 Jan 2025
Closing Date22 Jan 2025
Tender Amount₹ 4,03,507
Costs
EMD
₹ 4,035Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
568083Bid Award Id
ViewTender No
E1/620/2/2024-25Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Development of Park in ward no.7;Supply, delivery and fixing of MS Clamp with nut bolts.
2
284
568
... More
Development of Park in ward no.7;MS MS FLANGES OD 110 mm SSR
2
186
372
... More
Development of Park in ward no.7;Manufacture, Supply, & Delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to anywhere in T.S. Excluding excise duty, sale tax and specials etc., complete MS MS FLANGES OD 50 mm SSR
2
102
204
... More
Development of Park in ward no.7;MS Bore cover Galvanised Bore Cover 150mm dia
1
204
204
... More
Development of Park in ward no.7;Supply of (5.6/0.3) PVC insulated 3 core 4.0 Sqmm sheathed flexible copper cable for voltage up to 1100V as per IS 694/1990 of makes Finolex / RR Kable. (Elec.-1.5.6, SI.163)
40
168
6720
... More
Development of Park in ward no.7;Manufacture, supply, & delivery of Polyethylene pipes (PE-100 Grade) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete. (Supply upto 90 mm dia in coil & above 90 mm dia stright length in6 M.) OD 40 mm 16KG SSR 2021-22
80
103
8271.2
... More
Development of Park in ward no.7;Supply and Transportation of star rated 1.50HP 21 Stage Stage Three phase ISI submersible motor pumpset suitable for 6" Bore well. Makes: Texmo / CRI / KSB / Aryan Varsha / Lubi(ELEC-5.5.1 (D))
1
36356
36356.8
... More
Development of Park in ward no.7;Supply and fixing of PVC casing pipes of 180 mm dia 6 Kg/Sqm pressure of ISI make
30
723
21711.6
... More
Development of Park in ward no.7;DRILLING OF BORE WELL Drilling of 6 1/2" dia bore well with power rig to the extent of required depth of 210 mtrs or as per geophysics recommendation in Quthbullapur Circle, including drilling with mounted rig to high compressor, flushing, airing, including drilling to the all kind of soil strata like rock, gravel, fracture rock etc., to depth of required and including fixing of suitable casing of suitable size of 6 Kg pressure resistible to pass the submersible pump set of dia 6'' to the depth of drilled bore including fuel, oil, transportation, labour etc., complete as per the direction of departmental officer required. (Rate as per Distric Collector Ranga Reddy district Pro.No.TO/07/Drilling of BWs/RR/2011-12, Dated: 30-07-2011) TS No.487/2015-16, Dt:14.09.2015. 0-90 Mtrs
80
305
24400
... More
Development of Park in ward no.7;Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, 2 Coats (All Colours) to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912
159.84
183
29311.46
... More
Development of Park in ward no.7;Plastering with CM 2coats,12mm thick, base coat in CM(1:5),8mm thick and top coat in CM(1:3), 4mm thick with sponze finishing including cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc. incl. cutting grooves whereever necessary etc., complete for finished item of work (As per SS 903).
159.84
566
90488.62
... More
Development of Park in ward no.7;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work
14.03
8374
117488.66
... More
Development of Park in ward no.7;BLD-CSTN-3-10- ( 27 ) Hand mixing: Plain Cement concrete nominal mix (1:3:6) prop (Cement : fine aggregate: coarse aggregate) using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.el
0.27
6137
1657.24
... More
Development of Park in ward no.7;Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work BELOW GROUND LEVEL
10.38
4901
50881
... More
Development of Park in ward no.7;Plain Cement concrete (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work. BLD-CSTN-2-7 for foundation and under flooring bed.
1.92
5231
10044.73
... More
Development of Park in ward no.7;Earth work excavation in Ordinary soils by Mechcanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B
10.57
128
1355.39
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements