Municipal Administration Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
520055Tender No
E1/121/3/2024Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
cc drain in ward number 12th;0.0
102.6
157
16129.75
... More
cc drain in ward number 12th;BLD-CSTN-2-8 (16) : Filling with HBG Stone Chips 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
-
-
-
... More
cc drain in ward number 12th;for drain
5.15
-
-
... More
cc drain in ward number 12th;for culvert
0.9
-
-
... More
cc drain in ward number 12th;0.0
6.05
1038
6285.71
... More
cc drain in ward number 12th;BLD-CSTN-3-4 (21) -Hand mixing up to Plinth Level : Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
-
-
-
... More
cc drain in ward number 12th;for drain
10.3
-
-
... More
cc drain in ward number 12th;for culvert
1.12
-
-
... More
cc drain in ward number 12th;0.0
11.43
4946
56515.13
... More
cc drain in ward number 12th;BLD-CSTN-3-12-(29) Using Concrete mixture up to Plinth Level : Plain Cement concrete (M 15) Nominal Mix 1:2.5:5 (Cement : fine aggregate: coarse aggregate ) using 40, 20 & 10mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.
-
-
-
... More
cc drain in ward number 12th;drain walls
24.72
-
-
... More
cc drain in ward number 12th;culvert walls
1.8
-
-
... More
cc drain in ward number 12th;0.0
26.52
5690
150903.31
... More
cc drain in ward number 12th;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars ( Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126
-
-
-
... More
cc drain in ward number 12th;on culvet portion double mat per 1 cum 110 kgs
198
89
17683.38
... More
cc drain in ward number 12th;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement
-
-
-
... More
cc drain in ward number 12th;on vent portion
2.32
-
-
... More
cc drain in ward number 12th;oon culvert vent portion
0.18
-
-
... More
cc drain in ward number 12th;for slab culvert
2.25
-
-
... More
cc drain in ward number 12th;0.0
4.75
6294
29883.14
... More
cc drain in ward number 12th;BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
-
-
-
... More
cc drain in ward number 12th;foe available earth
18.54
-
-
... More
cc drain in ward number 12th;for culvert
1.62
-
-
... More
cc drain in ward number 12th;0.0
20.16
38
773.94
... More
cc drain in ward number 12th;BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
-
-
-
... More
cc drain in ward number 12th;0.0
18.54
-
-
... More
cc drain in ward number 12th;0.0
1.62
-
-
... More
cc drain in ward number 12th;0.0
20.16
304
6129.04