Municipal Administration Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Administration Department Tender

Works
Civil And Construction
Building Construction
Opening Date20 Dec 2024
Closing Soon24 Dec 2024
Tender Amount₹ 4,09,058 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Community Hall;BLD-CSTN-12-4-(171) Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, 2 Coats (A Colours) to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all matenals to work site and all operational, incidental, labour charges etc. complete for finished tem of work as per SS 912

220.29

190

41859.51

... More
Construction of Community Hall;BLD-CSTN-0-10-(85) Plastening 12mm thick two coats with base coat of 8mm thick in CM (15) and top coat of 4mm thick in C.M. (14) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand, Water, etc., to sito, al operational subour charges for moxing mortar, finishing, scaffolding ift charges, cuing, including cutting grooves where ever necessary etc, complete for finished item of work Ground floor-celling plastering

93.75

586

54965.62

... More
Construction of Community Hall;BLD-CSTN-8-9-(84) Plastening 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1.6) and top coat of 4mm thick in CM (14) with dubara sponge finishing inauding cost and conveyance of all maternals like cement, sand, water etc to site excluding seigniorage charges but including sales & other taxes on all materials, and all operationst, incidental charges on matenals and including cost of all labour charges for mixing mortar, finishing, scaffolding ift charges, curing, including cutting grooves as directed by Engineerin 901.903 & 004) (External walls) charge etc, and overheads & contractors profit complete for finisher for finished item of work. (SS 901,903 &904) (External walls)

126.54

614

77784.14

... More
Construction of Community Hall;Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal angles horizontal supports at 0.50m c/c 2.00mm MS sheet at bottom 0.30m height and 16mm MS square bars Vertically at 100mm centre to centre including foong with 4 Nos of MS 2 holdfasts (2 on each side) duly making cutting brick masonry, fong and making to original surface neatly and including cost and conveyance of all matenals, Locking arrangment, Omamental pieces etc cutting bending, welding including all operational charges and all labour charges etc, complete for finished tem of work for 3.00m & abov above 3m span gates

196

121

23827.72

... More
Construction of Community Hall;Supply and Fixing of single leaf shutter, Door Size 0 90x2.10 mtrs with Sall Country wood Frame of sections size 75mm.x 100mm and with Flush Door Shutter Solid Bond Wood block board type with commercial ply on both faces of 35mm thick including cost of fatures such as MS Powder coated Tower Bolts 250mm long 2 Nos, MS Powder coated Handles 150mm long 2 Nos. 300mm long MS Powder coated Aldrops No. 125mm long MS Powder Coated butt hinges 6Nos, 300 mm lang MS Powder coated Flat latch No. Door stopper 2 Nos, MS Hold fasts 4Nos 230mm long cost and convenyance of all maternals to site all Labour charges such as Foxing of Door Frame and shutter Fixing in position, with Hardware fixtures etc, complete for finsihed item of work

2.21

8321

18349.57

... More
Construction of Community Hall;BLD-CSTN-5-4-(42) Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1.6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks Water, etc., to site including all labour charges like moong Cement Mortor, scaffoding charges ift charges, cunng charges etc. complete for finished item of work

13.23

8464

111986.13

... More
Construction of Community Hall;BLD-CSTN-10-25-(148) Providing impervious coat to exposed RCC roof slab surface with CM(13), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, all operational, incidental and labour charges for moing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and siab etc,, complete for finished item of work

35.08

662

23231.73



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.