Municipal Administration Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Administration Department Tender

Works
Civil And Construction
Drainage Work
Opening Date16 Mar 2024
Closing Date3 Apr 2024
Tender Amount₹ 2,35,84,864 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars ( Fe 500/550/550D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors.( APSS No.126)

4560

77

352989.6

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including centering, shuttering, curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH M25 Concrete for Side walls

1.5

5861

8791.86

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including centering, shuttering, curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH M25 Concrete for Side walls

54

5861

316506.96

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including centering, shuttering, curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH M25 Concrete for Base Slab

58.5

5541

324179.51

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;Providing concrete for plain/reinforced concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for foundation and flooring bed.

45

4488

201988.35

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;PHE-BHLW-26 : Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches of depths upto 6?-0? (2 Meter) below G.L as directed by the departmental officers

300

218

65517

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;Bailing out water from pipeline trenches with oil engine driven pumpsets of 5 HP capacity including hire charges, fuel charges and wages for driver and helper etc. complete as directed by the Engineer in charge

1200

68

82512

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;BLD-CSTN- 2-8 modified in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

67.5

1065

71901.68

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for structures by manual means.

63

270

17039.61

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;RBR-FNDN-1 - In ordinary soils by Mechanical means : Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for structures including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for structures by mechanical means. For structures upto 3m depth below GL by Mechanical Means.

252

127

32051.88

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;RBR-CCPV-5: Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

122.67

5955

730606.57

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;BLD-CSTN- 2-8 modified in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

245.34

1065

261338.62

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.

368.01

270

99535.66

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;Carting of surplus excavated earth/soils/ rock/ debris or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

2739.76

72

198906.58

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;Construction of sewer conical manhole as per type design using Flyash Cement Solid Blocks of size 225x 100 x 60 Cum and brick masonary in CM (1:5) prop; including PCC M10 grade using 20mm graded for bed in foundation and PCC M15 grade concrete using 20mm graded HG metal for benching and channels, inside plastering 20mm thick in single coat of CM (1:3) prop. with Sulphate Resistant Cement; and outside plastering 20mm thick in single coat of CM (1:3) prop with Ordinary Portland Cement; and supporting incoming pipes with concrete block / masonry wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) 560mm dia and Encapsulated Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as per drawings and specifications and as directed by the Engineer in Charge.. 1.50 m dia manhole extra lift of 0.1 m depth up to 3.00 m

205

2992

613370.25

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;Construction of sewer conical manhole as per type design using Flyash Cement Solid Blocks of size 225x 100 x 60 Cum and brick masonary in CM (1:5) prop; including PCC M10 grade using 20mm graded for bed in foundation and PCC M15 grade concrete using 20mm graded HG metal for benching and channels, inside plastering 20mm thick in single coat of CM (1:3) prop. with Sulphate Resistant Cement; and outside plastering 20mm thick in single coat of CM (1:3) prop with Ordinary Portland Cement; and supporting incoming pipes with concrete block / masonry wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) 560mm dia and Encapsulated Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as per drawings and specifications and as directed by the Engineer in Charge.. 1.50 m dia manhole 2.40 m depth

41

59502

2439609.88

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;Construction of sewer conical manhole as per type design using Flyash Cement Solid Blocks of size 225x 100 x 60 Cum and brick masonary in CM (1:5) prop; including PCC M10 grade using 20mm graded for bed in foundation and PCC M15 grade concrete using 20mm graded HG metal for benching and channels, inside plastering 20mm thick in single coat of CM (1:3) prop. with Sulphate Resistant Cement; and outside plastering 20mm thick in single coat of CM (1:3) prop with Ordinary Portland Cement; and supporting incoming pipes with concrete block / masonry wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) 560mm dia and Encapsulated Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as per drawings and specifications and as directed by the Engineer in Charge.. 0.90 m dia manhole extra lifts of 1.20m dia manhole extra lift of 0.1m depth up to 2.30 m

160

2576

412160

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;Construction of sewer conical manhole as per type design using Flyash Cement Solid Blocks of size 225x 100 x 60 Cum and brick masonary in CM (1:5) prop; including PCC M10 grade using 20mm graded for bed in foundation and PCC M15 grade concrete using 20mm graded HG metal for benching and channels, inside plastering 20mm thick in single coat of CM (1:3) prop. with Sulphate Resistant Cement; and outside plastering 20mm thick in single coat of CM (1:3) prop with Ordinary Portland Cement; and supporting incoming pipes with concrete block / masonry wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) 560mm dia and Encapsulated Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as per drawings and specifications and as directed by the Engineer in Charge.. 0.90 m dia manhole extra lifts of 0.2m dia manhole 1.65m depth

32

30904

988956.8

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;Construction of sewer conical manhole as per type design using Flyash Cement Solid Blocks of size 225x 100 x 60 Cum and brick masonary in CM (1:5) prop; including PCC M10 grade using 20mm graded for bed in foundation and PCC M15 grade concrete using 20mm graded HG metal for benching and channels, inside plastering 20mm thick in single coat of CM (1:3) prop. with Sulphate Resistant Cement; and outside plastering 20mm thick in single coat of CM (1:3) prop with Ordinary Portland Cement; and supporting incoming pipes with concrete block / masonry wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) 560mm dia and Encapsulated Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as per drawings and specifications and as directed by the Engineer in Charge.. 0.90 m dia manhole extra lifts of 0.1m depth up to 1.60 m depth

72

1340

96499.44

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;Construction of sewer conical manhole as per type design using Flyash Cement Solid Blocks of size 225x 100 x 60 Cum and brick masonary in CM (1:5) prop; including PCC M10 grade using 20mm graded for bed in foundation and PCC M15 grade concrete using 20mm graded HG metal for benching and channels, inside plastering 20mm thick in single coat of CM (1:3) prop. with Sulphate Resistant Cement; and outside plastering 20mm thick in single coat of CM (1:3) prop with Ordinary Portland Cement; and supporting incoming pipes with concrete block / masonry wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) 560mm dia and Encapsulated Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as per drawings and specifications and as directed by the Engineer in Charge.. 0.90 m dia manhole up to 1.10 m

18

17119

308154.06

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;PHE-LRCS-6 : Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985 600 mm dia RCC NP3 Sewer Lines

1800

469

845640

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;PHE-LRCS-6 : Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985 450 mm dia RCC NP3 Sewer Lines

200

354

70804

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;PHE-LRCS-6 : Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985 300 mm dia RCC NP3 Sewer Lines

250

254

63692.5

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;Manufacture, Supply and Delivery of Reinforced Cement Concrete Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes with High Alumina Cement Mortar Lining conforming to B.I.S. 458/2003 at site (rate per meter of effective length) Including transportation & Excluding taxes. 600 mm dia RCC NP3 Sewer Lines

1800

5076

9137646

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;Manufacture, Supply and Delivery of Reinforced Cement Concrete Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes with High Alumina Cement Mortar Lining conforming to B.I.S. 458/2003 at site (rate per meter of effective length) Including transportation & Excluding taxes. 450 mm dia RCC NP3 Sewer Lines

200

3191

638344

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;Manufacture, Supply and Delivery of Reinforced Cement Concrete Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes with High Alumina Cement Mortar Lining conforming to B.I.S. 458/2003 at site (rate per meter of effective length) Including transportation & Excluding taxes. 300 mm dia RCC NP3 Sewer Lines

250

1948

487150

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;BLD-CSTN- 2-8 modified in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

408.9

1065

435564.37

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;PHE-BHLW-26 : Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches of depths upto 6?-0? (2 Meter) below G.L as directed by the departmental officers

1125

218

245688.75

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;PHE-SHST-25: Providing shoring and shrutting for excavation of trenches for laying pipe lines including cost and conveyance of all materials, labour charges and removal of shoring and shuttering at appropriate places as directed by the departmental officers with all incidental and operational charges etc, complete. Single Staging for up to 2.50 to 4.50 Mts

2362.5

53

126157.5

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;PHE-SHST-25: Providing shoring and shrutting for excavation of trenches for laying pipe lines including cost and conveyance of all materials, labour charges and removal of shoring and shuttering at appropriate places as directed by the departmental officers with all incidental and operational charges etc, complete. Single Staging for up to 2.50 Mts

2362.5

49

116872.88

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;Bailing out water from pipeline trenches with oil engine driven pumpsets of 5 HP capacity including hire charges, fuel charges and wages for driver and helper etc. complete as directed by the Engineer in charge

280

68

19252.8

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) : (Using Air Compressor and Jack Hammers) : Excavation in Hard Rock in habitant areas where conventional blasting can not be done for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including diversion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete as directed by the Engineer in charge.

88.37

2268

200446.14

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;BLD-CSTN-2-11 - (Amendment as per SOR 2021-22) - Earth work excavation in hard rock (blasting prohibited) (Using Hydraulic Excavator with breaker attachment) using hydraulic brakers for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including diversion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete

88.37

1001

88496.37

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;RBR-FNDN-1- ( I-A-ii ) In ordinary soils, 3.00 Mts to 6.00Mts. depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.

176.74

765

135213.17

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;RBR-FNDN-1- ( I-A-ii ) In ordinary soils, 3.00 Mts to 6.00Mts. depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.

176.74

608

107555.13

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;RBR-FNDN-1 - In ordinary soils by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by mechanical means. For pipeline trenches from 3m to 6m depth below GL by Mechanical Means

1237.21

145

179840.85

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) : (Using Air Compressor and Jack Hammers) : Excavation in Hard Rock in habitant areas where conventional blasting can not be done for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including diversion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete as directed by the Engineer in charge.

353.49

2268

801807.23

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;BLD-CSTN-2-11 - (Amendment as per SOR 2021-22) - Earth work excavation in hard rock (blasting prohibited) (Using Hydraulic Excavator with breaker attachment) using hydraulic brakers for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including diversion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete

353.49

1001

353995.49

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.

706.98

595

420674.31

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.

706.98

473

334627.77

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.

4948.83

127

629441.69

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;Cutting Open CC Road Surface including stacking of excavated material for pipe line trench including all operational, incidental, labour charges, taking all precautionary measures in the restricted areas, diversion of the traffic etc. as directed by Engineer-In Charge

20.45

2664

54484.32

... More
Construction of Pipe drain from confluence point of Kattukaluva into Gudi Cheruvu to existing drain;Cutting Open BT Road Surface including stacking of excavated material for pipe line trench including all operational, incidental, labour charges, taking all precautionary measures in the restricted areas, diversion of the traffic etc., as directed by Engineer-In Charge

68.15

327

22299.36



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.