Municipal Administration Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Administration Department Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date29 Aug 2024
Closing Date4 Sep 2024
Tender Amount₹ 30,40,476 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Repair of water supply Net work;Manufacture, Supply and Delivery of Cast Iron Fittings (spls.) Conforming to IS. No. 7181/1986, 5531/1988, 3950/1979 and C.I.D Joints conforming to IS o.8794/1988 at site of work anywhere in T.G. Including, loading, unloading, transportation to site of work stacking at site transit risk and package,excluding all taxes.

450

79

35681

... More
Repair of water supply Net work;100 mm Gate valve P-10

4

10045

40183

... More
Repair of water supply Net work;Manufacture, supply and delivery of DI (Ductile Iron) Wafer Butterfly valves conforming to IS 13095 (and its amendments).With hand lever below 150 mm, with Worm gear for 200 mm and above.80 mm Gate valve P-10

4

7145

28581

... More
Repair of water supply Net work;110mm Ø (PE-100 Grade) 8.0 kg/ sqcm Pipe

1320

80

106480

... More
Repair of water supply Net work;Laying and jointing of HDPE pipes in ready made trench by butt fusion welding as per IS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure.90mm Ø (PE-100 Grade) 8.0 kg/ sqcm Pipe

2760

65

181875

... More
Repair of water supply Net work;Earth Wrok Excavation for Pipe Line Trench and alighnment of Trench and Re-Filling of Trench etc as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification As per SS -20B (APSS 308) for Pipe Line Trench (90mm Ø (PE-100 Grade) 8.0 kg/ sqcm Pipe) ,(110mm Ø (PE-100 Grade) 8.0 kg/ sqcm Pipe)

2203.2

251

553356

... More
Repair of water supply Net work;Open C.C. Road Surface Cutting, Concrete including Disposal of unserviceable materials within 1.00 km lead radius from the site including all labour charges and all materials etc complete. C.C.Surface Road Cutting For Pipe Line

58.2

2664

155061

... More
Repair of water supply Net work;110mm Ø (PE-100 Grade) 8.0 kg/ sqcm Pipe

1320

440

581891

... More
Repair of water supply Net work;Manufacture, supply, & delivery of High Density Polyethylene pipes (PE-100 Grade) 8.0 kg/ sqcm Pipe for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete. (Supply upto 90 mm dia in coil & above 90 mm dia stright length in6 M.)(in Ward no.1 to 20)90mm Ø (PE-100 Grade) 8.0 kg/ sqcm Pipe

2760

293

809030

... More
Repair of water supply Net work;(5.00 HP)-Rewinding of Submersible pums Above 5.00 HP up to 25.00 HP , 3 Phase up to 1400 RPM of all types and makes with copper wire including minor repairs, lubrication of ball bearings, bush bearings and replacing condencer, screws etc testing of motor for original speed.

1

10500

10500

... More
Repair of water supply Net work;(7.50 HP)-Rewinding of Submersible pums Above 5.00 HP up to 25.00 HP , 3 Phase up to 1400 RPM of all types and makes with copper wire including minor repairs, lubrication of ball bearings, bush bearings and replacing condencer, screws etc testing of motor for original speed.

1

21750

21750

... More
Repair of water supply Net work;(10.00 HP)-Rewinding of Submersible pums Above 5.00 HP up to 25.00 HP , 3 Phase up to 1400 RPM of all types and makes with copper wire including minor repairs, lubrication of ball bearings, bush bearings and replacing condencer, screws etc testing of motor for original speed.

1

29000

29000

... More
Repair of water supply Net work;leakage proof for Existing 160mm Ø PVC Pipe Line including Labour charges for earth work Excavation, Bedding with Stone dust, cutting and uprooting the PVC Pipe Piece, Lowering and Jointing the PVC Pipe with , refilling with excavated soil, Barricading Bailing out water carting the excess earth etc. complete for finished item of work as directed by the Engineer in charge (160mm Ø PVC Pipe Line, W.No.01 to Ward No.20)

1

8673

8672.8

... More
Repair of water supply Net work;leakage proof for Existing 110mm Ø PVC Pipe Line including Labour charges for earth work Excavation, Bedding with Stone dust, cutting and uprooting the PVC Pipe Piece, Lowering and Jointing the PVC Pipe with , refilling with excavated soil, Barricading Bailing out water carting the excess earth etc. complete for finished item of work as directed by the Engineer in charge(110mm Ø PVC Pipe Line, W.No.01 to Ward No.20)

2

6372

12745

... More
Repair of water supply Net work;leakage proof for Existing 90mm Ø PVC Pipe Line including Labour charges for earth work Excavation, Bedding with Stone dust, cutting and uprooting the PVC Pipe Piece, Lowering and Jointing the PVC Pipe with , refilling with excavated soil, Barricading Bailing out water carting the excess earth etc. complete for finished item of work as directed by the Engineer in charge (90mm Ø PVC Pipe Line, W.No.01 to Ward No.20)

4

5763

23054

... More
Repair of water supply Net work;160 mm Dia HDPE pipe PE-100 PN(6 -10 KG)

1

5942

5942

... More
Repair of water supply Net work;110 mm Dia HDPE pipe PE-100 PN(6 -10 KG)

1

4178

4179

... More
Repair of water supply Net work;Arresting leakage in HDPE pipe line with Butt Fusion Welding and Fittings for the following diameters including necessary excavation, dewatering, removing of mud,cleaning of pipe and leakage portion of pipe from trench with including providing jointing material i.e. collars, flanges etc., hiring of Diesel generator, pumps, welding machine as required, refilling back the trench & all incidental charges complete for finished job of work (Public Health Items (Part ?IV) SoR 2023-24 42. ARRESTING OF LEAKAGES IN DI PIPELINE SSR 2023-24 Soft Page 534 of 537) 90 mm Dia HDPE pipe PE-100 PN(6 -10 KG)

2

3764

7528

... More
Repair of water supply Net work;Arresting Joint leakages in DI pipe line 400 mm dia

2

13079

26159

... More
Repair of water supply Net work;Arresting Joint leakages in DI pipe line 300 mm dia

1

10958

10958

... More
Repair of water supply Net work;Arresting Joint leakages in DI pipe line 250 mm dia

1

9193

9194

... More
Repair of water supply Net work;Arresting Joint leakages in DI pipe line 200 mm dia

1

8440

8440

... More
Repair of water supply Net work;Arresting Joint leakages in DI pipe line 150mm dia

2

7707

15415

... More
Repair of water supply Net work;Arresting Joint leakages in DI pipe line at socket and spigot ends (S/S) by replacing the rubber gaskets for following diameters including necessary excavation, dewatering, removing of mud, lifting and removal of pipe, cleaning of pipe at leakage portion, jointing with rubber gasket & placing in position including hire charges of of hydra or crane, pumps, DG set and necessary equipments, refilling back the trench & all incidental charges complete for finished job of work.Public Health Items (Part ?IV) SoR 2023-24 42. ARRESTING OF LEAKAGES IN DI PIPELINE SSR 2023-24 Soft Page No.535 of 537(ward no 1 to 20) Arresting Joint leakages in DI pipe line 100 mm dia

4

6755

27022



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.