Municipal Administration Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
195173Bid Award Id
ViewTender No
06/EE/MRDCL/2020-21Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
BOQ;Supply and Fixing of CPVC Pipes ( 28.60 mm OD Pipe - SDR 13.5 )and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) of Ashirvad / Ajay Flowguard .
85
-
18638.8
... More
BOQ;Supply and Fixing of CPVC Pipes ( 22.20mm OD Pipe - SDR 13.5 )and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) of Ashirvad / Ajay Flowguard including cost and conveyance of all material, labour charges etc.,
80
-
13270.4
... More
BOQ;Supply and fixing of 50mm nominal bore G.I pipe medium grade properities and weight as per IS 1239-ISI mark with GI fittings including the cost of pipe and its fittings and labour charges etc.,
100
-
51354
... More
BOQ;Supply and transportation of 5.00Hp Star rated 12-16 stage 3 phase ISI submersible motor pump set sutiable for 6" bore well including cost & conveyance charges, labour charges etc., complete Makes: Kirloskar / Crompton / Texmo / CRI / KSB / Aryan Varsha
1
-
42766.96
... More
BOQ;Cost supply and fixing of casing pipe 180mm dia pvc 6kg/cm2 including cost and conveyance of all materials,labour charges etc., complete
30
-
21780
... More
BOQ;Drilling of Bore well by down the hole hammer (DTH) drilling to finished dia of 163 mm in all formations to the depth specified and reaming the bores to the required dia flushing the bore walls at an average pressure of 7 kg/cm2 (100 PSI) conducting yield test, inclusive of transportation from point to point, crew charges, cost of consumables, shifting of Rig and all other charges etc,.The bore wells should be true & vertical and work should be carried out to the satisfaction of the department and carried out as per IS 2800 I & II / 1979 and amendments if any from time to time, complete as applicable.
60
-
20130
... More
BOQ;Drilling of Bore well by down the hole hammer (DTH) drilling to finished dia of 163 mm in all formations to the depth specified and reaming the bores to the required dia flushing the bore walls at an average pressure of 7 kg/cm2 (100 PSI) conducting yield test, inclusive of transportation from point to point, crew charges, cost of consumables, shifting of Rig and all other charges etc,.The bore wells should be true & vertical and work should be carried out to the satisfaction of the department and carried out as per IS 2800 I & II / 1979 and amendments if any from time to time, complete as applicable.
90
-
27450
... More
BOQ;Maintenance of landscape development for a period of 12 months from the date of completion of work including watering the plants, replacement of causalities,weeding soilworking,fertilizers,pesticides etc.
3839
-
52405.04
... More
BOQ;Supply and fixing of sadarali grey colour granite benches with three line dressing including cost and conveyance of all materials, transportation, loading, unloading, erection at site including all taxes complete etc., complete. (Model No.3 Gray colour granite bench of size 5'-0"x2'-0"x3")
10
-
80000
... More
BOQ;Bed Preparation for FISCUE / Shade grass (Dribbling) Dressing the surface to the desired shape, laying 6" layer of fine red soil, covered with thin layer of sand, watering, rolling with hand roller(4" thickness after rolling), . Includes cost of red earth, sand and labour charges etc complete but including the cost of fertilizers, chemicals & grass
2300
-
729238
... More
BOQ;Jute: Supply and transportation and installation of 1 layer of oven coir geo-textile with hydroseeding to protect the bund errosion & for beautification. Cost includes cost and conveyance of all materials, welding charges, anchoring charges etc.
1500
-
49500
... More
BOQ;Bed Preparation for Ground cover 4"layer of soil mixture 3:1:1 ratio redsoil, farm manure and River sand and application of fertilizer (@20gns/pit/sqmt) smooth surface as per design including cost of soil mixture , filling of soil mixture and internal transportation
300
-
59628
... More
BOQ;Hedge / shrub planting :- Digging the trench of size 30 cms depth refiling the trench with redsoil including cost of redsoil and farmyard manure at 4:1 ratio internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc (@20gns/pit/sqmt) complete but excluding thecost of the fertilizers(@20gns/pit/sqmt) and plant material
3689
-
2651173.63
... More
BOQ;Topiary/ Palms/ Garden tree planting:-Digging in ordinary soils size of 60x60x60 cms pit. Filling with soil mixture of redsoil, farmyard manure at 3:1:1 ratio including internal transport ,application fertilizers and chemicals (@20gms/pit/sqm) internal transportation of plants and planting the plants etc. for complete item of work excluding cost of plant material fertilizers and chemicals (@20gms/pit/sqmt)
150
-
54957
... More
BOQ;wet slush & debries Cleaning in nala and carting away the waste to the unobjectionable place as directed by EIC.
100
-
16500
... More
BOQ;Preperation of Earther mounds to required slope in any kind of soil .job including the excavtion and placing the soil to the desired slope as directed by the architect. Job to be done with hydralic excavator including dosing.
60
-
57000
... More
BOQ;Earth filling by manual compaction in filling in plinth,pit or other areas wherever required and as directed with available selected soil/murrum and excavated earth other than black cotton soil ,rocks & other foreign matters.whithin the yard or site with all leads & lifts Job includes with initial leads,watering charges, all operational,incidental and labour charges etc. Filling shall be done in 150mm thick layers and watered,rammed,and consolidated.Ramming shall be done with iron rammers of 25Kg where possible.filling should be done to the line and level at top as required at site.Job includes all labour,tools,transportation and water etc.complete.
2000
-
113280
... More
BOQ;Cleaning the light jungle,small plants,bushes, and ,vegetation (dia less than 4") and making surface levelled and disposal of rubbish outside Site's premises to an unobjectionable place, as directed by the Engineer in Charge.
400
-
188
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements