Municipal Administration Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Administration Department Tender
Civil And Construction
Drainage Work
Opening Date28 Jul 2023
Closing Date14 Aug 2023
Tender Amount₹ 4,05,134
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
443074Bid Award Id
ViewTender No
E1/CC Drain/SDF/KLKY/2023-24/002Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Storm Water CC Drain;BLD-CSTN-4-1- (34) ; Providing High Yield Strength Deformed (HYSD)/Thermo Mechanically Treated (TMT)/ Mild steel (MS) steel bars (Fe 415/Fe 500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting , bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and typing and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastges such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position , tying including sales and other taxes on all materials -(2 no's Slabs (6*1.2*0.20M)
374.4
88
33130.72
... More
Construction of Storm Water CC Drain;Plain Cement Concrete - Nominal Mix (1:2.5:5) Prop with 20 mm metal hand mixing including cost and conveyance of all materials and labour charges etc., complete for Concrete Bed.
4.28
5458
23361.78
... More
Construction of Storm Water CC Drain;Plain Cement Concrete - Nominal Mix (1:3:6) Prop with 20mm metal hand/machine mixing including cost and conveyance of all materials and labour charges etc., complete - for Side Walls.
26.22
8609
225752.52
... More
Construction of Storm Water CC Drain;Plain Cement Concrete (1:5:10) using 40 mm metal with Concrete Mixture. All work upto Plinth Level including cost and conveyance of all materials and labour charges etc., complete
11.4
4357
49673.11
... More
Construction of Storm Water CC Drain;Supply and Filling with Crusher Stone Dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH including cost and conveyance of all materials and labour charges etc., complete for finished items of work.
11.4
977
11145.21
... More
Construction of Storm Water CC Drain;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
65.55
258
16916.61
... More
Construction of Storm Water CC Drain;RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar
25.65
648
16640.22