Municipal Administration Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Administration Department Tender

Civil And Construction
Drainage Work
Opening Date3 Jun 2023
Closing Date9 Jun 2023
Tender Amount₹ 12,94,234 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Storm water Drain;Manufacture, Supply and Delivery of R.C.C. Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes conforming to B.I.S. 458/2003 at ex-factory (rate per meter of effective length) Including transportation & taxes.page no: 467 in SSR 2022-23/ 300dia/ NP-3Class

230

1638

376815.51

... More
Construction of Storm water Drain;Earthwork in Excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 mm dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for Drain Foundations

83.1

258

21445.78

... More
Construction of Storm water Drain;Carting excavated earth from the site or work within a distance of 6 km. Including loading and unloading directed by the Municipal Engineer

32.4

88

2851.2

... More
Construction of Storm water Drain;Collection ,Supply and filling of Gravel from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications.[RBR-FNDN-2]

10.8

315

3405.56

... More
Construction of Storm water Drain;BLD-CSTN-3-13- (30) -A-Design mix: RCC M-20 Design mix (Cement : fine aggregate : coarse aggregate ) corresponding to Table 9 0f IS 456 using 20mm size graded Machine Crushed hard granite Metal (coarse aggregate ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate water etc., to site and seigniorage charges, sales & other taxes on all materials inculding all operational ,incidental and labour charges such as machine mixing , laying, concrete , curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work , but inciuding centering and shuttering charges for foundations plinth pedestals

2.88

9678

27874.97

... More
Construction of Storm water Drain;BLD-CSTN-4-1- (34) ; Providing High Yield Strength Deformed (HYSD)/Thermo Mechanically Treated (TMT)/ Mild steel (MS) steel bars (Fe 415/Fe 500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting , bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and typing and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastges such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position , tying including sales and other taxes on all materials -(2 no's Slabs (6*1.2*0.20M)

374.4

88

33130.72

... More
Construction of Storm water Drain;Plain Cement Concrete - Nominal Mix (1:2.5:5) Prop with 20 mm metal hand mixing including cost and conveyance of all materials and labour charges etc., complete for Concrete Bed.

5.4

5458

29475.14

... More
Construction of Storm water Drain;Plain Cement Concrete - Nominal Mix (1:3:6) Prop with 20mm metal hand/machine mixing including cost and conveyance of all materials and labour charges etc., complete - for Side Walls.

33.12

8609

285161.21

... More
Construction of Storm water Drain;Plain Cement Concrete (1:5:10) using 40 mm metal with Concrete Mixture. All work upto Plinth Level including cost and conveyance of all materials and labour charges etc., complete

14.4

4357

62744.98

... More
Construction of Storm water Drain;Supply and Filling with Crusher Stone Dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH including cost and conveyance of all materials and labour charges etc., complete for finished items of work.

14.4

977

14078.16

... More
Construction of Storm water Drain;Earthwork in Excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 mm dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for Drain Foundations

82.8

258

21368.36

... More
Construction of Storm water Drain;RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar

32.4

648

21019.23



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.