Municipal Administration Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Administration Department Tender
Civil And Construction
Building Construction
Opening Date9 Jan 2025
Closing Soon15 Jan 2025
Tender Amount₹ 15,64,089
Costs
EMD
₹ 15,641Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
567072Tender No
E1/2064/185/2024-25Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of Community Hall at Udyoganagar;BLD-ELEC-6-1-3 : Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains.( Makes : Polycab / GM / Million / V-Guard / Gold Medal / Kundancab / HPL / RPG / Nandicab / Nakoda / Payal / Finecab / Gemini / Vimal / Suncab / Stanjo / Rajnigandha / Orbit / Airson / Beljin / Savera Champion / Rhino )
30
94
2834
... More
Construction of Community Hall at Udyoganagar;ELEC-3.5.8 Supply and transportation of 10W LED Bulk head fitting with milky diffuser heat sink integrated with housing with all accessories etc complete with 5 years warranty warranty. LUMINAIRE MAKE : PHILIPS / OSRAM / GE / CROMPTON / BAJAJ / Keselec / Fortune Arrt / HALONIX / HAVELLS / HPL/ SYSKA / SURYA / Arraystorm / GM / Goldmedal / Jaquar / Panasonic / Leksa / Orient, LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.
2
820
1640
... More
Construction of Community Hall at Udyoganagar;ELEC-SoR -3.4.1 : Supply of 18.0 W LED lamps with input voltage 90 to 300V, Colour temparature 3000k - 6500k, Beam angle 170 - 220 degrees, B22 base. Makes: Phillips / OSRAM / Crompton / Eveready / Bajaj / Havells / Pharox / Halonix / Greenlites / IB LED/ Jaquar / C&S / GM / / FIEM / Gold Medal / Million/ Syska.
10
250
2500
... More
Construction of Community Hall at Udyoganagar;Elec-SoR- 3.3.16 : Supply , transportation, and fixing of 22W +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS Certification with BIS Certification.LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton/ Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec/ FIEM / Arraystorm / GM / Goldmedal, LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA / OSRAM / SAMSUNG / LG LEDs..
8
615
4920
... More
Construction of Community Hall at Udyoganagar;BLD-ELEC -3.1.2 : Supply and run of 1 of 22 /0.3mm (1.5 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete.( Makes : Finolex / RR kabel / Havells / Beljin(HFFR)/Ollivin(HFFR) / Finecab (HFFR) / GM(HFFR) / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / V-Guard (HFFR)./ DEC(HFFR) / Bonton (HFFR) and Avocab (HFFR) / Southking (HFFR) / Fortune Arrt (HFFR))
80
37
2989
... More
Construction of Community Hall at Udyoganagar;BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete. ( Makes : Finolex / RR kabel / Havells / Beljin (HFFR) /Ollivin (HFFR) / Finecab (HFFR) / GM(HFFR) / Gold Medal (HFFR) /Million (HFFR) / KEI (HFFR) / Polycab (HFFR) / V-Guard (HFFR)./ DEC(HFFR) / Bonton (HFFR) and Avocab (HFFR) /Southking (HFFR) / Fortune Arrt (HFFR))
60
104
6261
... More
Construction of Community Hall at Udyoganagar;BLD-ELEC-2-1-5 : Supply and fixing of 16A 3pin / 6A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (5 in one) on decolam sheet covered board including earth connection and all labour charges etc., complete on wall. ( Socket & Switch Makes : GM G Home / Gold Medal Olive / Million Zoom /Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.)
2
283
568
... More
Construction of Community Hall at Udyoganagar;BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. ( Socket & Switch Makes : GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.)
4
158
635
... More
Construction of Community Hall at Udyoganagar;Supply and fixing of batten/ CFL holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 40W bulb (for new installation) complete as directed by the Engineer-in-Charge. CFL holder makes: Phillips /Crompton / Bajaj / Surya. & CFL Lamp makes: Phillips /Crompton / Bajaj / Surya / Style Lamp /Mahita Electro / Capart.
6
113
683
... More
Construction of Community Hall at Udyoganagar;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings. ( Cable Makes : Finolex / RR kabel / Havells / Beljin(HFFR) /Ollivin (HFFR) / Finecab (HFFR) / GM (HFFR) / Gold Medal (HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / V-Guard (HFFR)./ DEC(HFFR) / Bonton (HFFR) and Avocab (HFFR) / Southking (HFFR) / Fortune Arrt (HFFR) (Switch, Ceiling Rose Makes : GM G Home / Gold Medal Olive / Million Zoom /Anchor Penta Cherry /Great white Omega / HPL / Vimal / CPL.)
24
777
18650
... More
Construction of Community Hall at Udyoganagar;Supply and Fixing of 20mm dia 2mm thick P.V.C. pipe (Heavy grade,FRLS with IS:9537 part 3) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete. ( Pipe Makes :Sudhakar / Finolex / Modi / VIP / Precision / Universal / Million Plast / Gold / Polycab / DEC / Beljin / Champion / Austro ).
38.1
105
4038
... More
Construction of Community Hall at Udyoganagar;Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. ( Pipe Makes :Sudhakar / Finolex / Modi / VIP / Precision / Universal / Million Plast / Gold / Polycab / DEC / Beljin / Champion / Austro )
59.4
92
5487
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-9-1-(99) :Flooring with polished shahabad / Tandur stone slabs of 15mm to 18mm thick set over a base coat of CM (1:8) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including sales & other taxes on all materials including all labour charges like dressing of flooring stones to the required size, mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and overheads & contractors profit complete for finished item of work. (APSS No.703 & 701)
30.9
881
27225
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-9-5-(103) :Flooring with soluble salt porcelain vitrified tiles screen printed and polised of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15)of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand , water, tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707)
65.2
1176
76735
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-7-1-(72): Flush Pointing to RR/CRS Masonry in CM(1:3) Prop: including cost and conveyance of all materials like cement,sand, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS 901,906)
32.4
122
3980
... More
Construction of Community Hall at Udyoganagar;TBSC-R.I-22 :Supply and fixing of pre-cast RCC Grills of any design of 50 mm thick manufactured with M-30 grade of concrete using vibrocompaction process using joint less FRP moulds to achieve shuttering finish and adequately reinforced for long use and to prevent damage during handling,transportation & erection etc., as approved by the Engineer-in-Charge including cost and conveyance of materials to site and labour charges etc., overheads & contractors profit complete for finished item of work in all floors.
0.54
755
408
... More
Construction of Community Hall at Udyoganagar;TBSC-M.II-15 : Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 2 Track?2 Panel Sliding windows with mesh duly manufactured using UPVC reinforced profiles of 91 mm x 49 mm x 2.20 mm for outer frames, 62 mm x 41 mm x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with 30 mm 15 mm x 1.5 mm with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm and the shutter of fly screen with fibre mesh shall be made of size 21mm x 58mm extruded uPVC window profile section of white colour having outer wall thickness of 2.2mm (± 0.3mm) provided with reinforcement of minimum 1.5mm thick G/J/U/S/O type GI section duly mitred cut and thermal welded at all corners and prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.
9
9223
83009
... More
Construction of Community Hall at Udyoganagar;Supplying and fixing of MS Grill for windows using 25mm x 6mm MS flat alround and 10mm MS square bars horizontally at 125mm centre to centre and vertically at 30cm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting grill with one coat of red oxide primer including and conveyance of all materials ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.
268.92
121
32693
... More
Construction of Community Hall at Udyoganagar;TBSC-L.I-18 :Supplying and fixing of 30mm thick Wood Plastic Composite (WPC) Door shutter, comprising of 70% virgin polymer, 15% wood powder (fiber), and the remaining 15% additives, the door shutter shall be water resistant, fire resistant and termite resistant, with Tensile Strength not less than 170 Kgf/cm2 and the door shutters surface finished deco paint etc., complete excluding cost of hinges, latches, aldrops etc., fitted with Hinges, 2 Nos of 250 mm long MS Aldrop, 2 Nos of 125 mm lond Aluminium door handle, 1 No.of 250 mm long Aluminium tower bolt, 1 no. 250 mm long Aluminium door latch & 1 No.baby lock including cost and conveyance of all material , all fixtures and all labour charges etc, for fixing etc, complete.
5.04
3710
18701
... More
Construction of Community Hall at Udyoganagar;TBSC-L.I-17 :Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast.
6.6
882
5826
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126
3039.2
78
237210
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-3-21 ( 33 ) Damp proof course 50mm thick with 1:2:4 cement concrete Nominal mix, using 12mm hard broken stone aggregate from approved quarry including cost and conveyance charges of all materials, cost of machinery, labour charges for mixing, placing in position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)
5.93
280
1661
... More
Construction of Community Hall at Udyoganagar;TBSCQ. II-12 : Providing and applying Brushbond ( two component acrylic polymer modified elastomeric waterproofing membrane which consists of Brushbond powder and Brushbond liquid acrylic emulsion) for a minimum 2mm thickness coating. (Work shall be executed as per manufacturer?s specification and instructions.
90.65
297
26984
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-11-8-(164) : Colour washing two coats with approved Colour and quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.
146.31
78
11556
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-11-5-(162) : White washing two coats with white cement to ceiling to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., and overheads & contractors profit complete for finished item of work in all floors
234.66
52
12355
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904) Ceiling plastering
90.65
232
21045
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)
144.01
221
31962
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)
146.31
245
35928
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 112/100 x 140 mm ( for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust) from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work. (APSS No. 501 & 504).
4.06
7146
29015
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN 5-17- (55) : Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm ( for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust) from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work. (APSS No. 501 & 504).
18.49
7371
136299
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-3-11-(28) : Plain Cement Concrete M 20 nominal mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work
0.55
6810
3746
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN- 2-9 ( 17 ) - (Modification) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
97.94
42
4132
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-6-13-(68) : Construction of Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., to site and excluding seigniorage charges but including sales & other taxes on all materials including labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing etc.,and overheads & contractors profit complete for finished item of work for foundations and basement. (APSS No. 601 & 615)
22.85
5203
118903
... More
Construction of Community Hall at Udyoganagar;(BLD-CSTN-3-16) : Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials , centering using Steel scaffolding pipes, jack props, wallers, Foot plates, brackets, steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903) for Sun shades, platforms, Lofts and shelves.
0.27
12008
3242
... More
Construction of Community Hall at Udyoganagar;Roof Beams
3.4
13700
46582
... More
Construction of Community Hall at Udyoganagar;Staircase Slab 175mm thick
1.38
11710
16161
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , centering using Steel scaffolding pipes, jack props, wallers, Foot plates, brackets, steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, curing , overheads & contractors profit etc., complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) for RCC SLABS, BEAMS. Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted. Roof slab - 125mm Thick
10.45
13148
137402
... More
Construction of Community Hall at Udyoganagar;Lintels
0.3
15059
4518
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using steel scaffolding pipes, jack props, steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, curing , overheads & contractors profit etc., complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted. Columns
3.45
14842
51208
... More
Construction of Community Hall at Udyoganagar;Plinth beams
3.51
14463
50766
... More
Construction of Community Hall at Udyoganagar;Pedastals
2.59
12115
31380
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-3-14-(31) - A : Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate sand, coarse aggregate, water etc., to site and sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props, wallers, Foot plates, brackets, steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only. The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted. Footings
11.2
11489
128686
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-3-5 (22) - Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
12.23
5438
66509
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-2-11 - (Amendment as per SoR 2021-22) - Earth work excavation in hard rock (blasting prohibited) (Using Hydraulic Excavator with breaker attachment) i.e, Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
4.4
1020
4492
... More
Construction of Community Hall at Udyoganagar;BLD-CSTN-2-1 (9) : Earth work excavation for foundations (Manual Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding seigniorage and dewatering charges etc., complete as per SS 20 B (APSS 308)
83.53
297
24829
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%