Municipal Administration Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Administration Department Tender

Works
Civil And Construction
Civil Works Others
Opening Date4 Jan 2025
Closing Date9 Jan 2025
Tender Amount₹ 2,40,111 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Compound wall youth Club in W.6;Amendment 2021-22 BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

6.57

387

2548.77

... More
Construction of Compound wall youth Club in W.6;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

118

88

10441.82

... More
Construction of Compound wall youth Club in W.6;For Coloumns

0.58

13485

7821.61

... More
Construction of Compound wall youth Club in W.6;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. For Footings

0.6

10498

6299.39

... More
Construction of Compound wall youth Club in W.6;BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - Two Coats - for New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

55.08

70

3889.75

... More
Construction of Compound wall youth Club in W.6;Supply and Fixing in position of steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows etc, including cost and conveyance of all material, labour charges for fabrication and fixing in postion etc,. Complete.

833.64

127

106647.57

... More
Construction of Compound wall youth Club in W.6;BLD-CSTN-12-4-(171): Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, 2 Coats (All Colours) to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912.

11.51

169

1949.45

... More
Construction of Compound wall youth Club in W.6;Flush Pointing with CM (1:3) to CRS Masonry including all charges etc. complete

35.1

108

3809.4

... More
Construction of Compound wall youth Club in W.6;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm. For Brick Pillars [ 2(0.6+0.30)] = 1.8m]

11.51

213

2451.98

... More
Construction of Compound wall youth Club in W.6;BLD-CSTN-5-4(42): Brick Masonary 2nd class Ground moulded or traditional size 23 x 11 x 7 cm in Cement Mortor 1:4 prop including Cost & Conveyance of all Materials like Cement, Sand, Bricks Water, etc., to site cost of Seigniorage charges on all materials including all labour charges like mixing Cement Mortor, scaffolding charges lift chagres, curing charges etc., complete for finished item of work.

1.08

6402

6914.72

... More
Construction of Compound wall youth Club in W.6;BLD-CSTN-3-7 Plain Cement concrete nominal mix (M15) prop (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work for foundation and under flooring Bed.

0.88

6050

5324.35

... More
Construction of Compound wall youth Club in W.6;BLD-CSTN-6-6-(61): Construction of CRS Masonary 2nd sort in Cement Mortaor (1:3) Prop using hard granite stone including cost and conveyance of all maerials like cement, sand, Water, Granite, required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of work.

5.27

5117

26967.28

... More
Construction of Compound wall youth Club in W.6;BLD-CSTN-6-12-(67): Construction of RR Masonary in Cement Mortaor (1:6) Prop using hard granite stone including cost and conveyance of all maerials like cement, sand, Water, Granite, required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of work.

5.27

4577

24123.69

... More
Construction of Compound wall youth Club in W.6;BLD-CSTN-3-7 Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.

2.54

5032

12782.02

... More
Construction of Compound wall youth Club in W.6;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308)

16.04

258

4139.28



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.