Municipal Administration Department Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Administration Department Tender

Opening Date30 Mar 2021
Closing Date3 Apr 2021
Tender Amount₹ 3,16,752 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Compound Wall in W.No.12;BLD-CSTN-7-1-(72) : Providing Flush Cement Pointing to CRS Masonary in Cement Mortor (1:3) Prop . for including cost & conveyance of all materials to site, labour charges on all materials, curing etc., Complete for finished item of work

44

-

4308.48

... More
Construction of Compound Wall in W.No.12;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work. Brick Masonry in GF Brick pillar 3m palcing

17.2

-

110037.28

... More
Construction of Compound Wall in W.No.12;BLD-CSTN-3-3: Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M15 (1:2.5:5) using coarse and fine aggregates including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges, for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement.

0.99

-

5611.3

... More
Construction of Compound Wall in W.No.12;Above Ground Level

11.88

-

54538.94

... More
Construction of Compound Wall in W.No.12;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work. Below Ground Level

8.91

-

40904.21

... More
Construction of Compound Wall in W.No.12;Plain Cement concrete (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work. BLD-CSTN-2-7 for foundation and under flooring bed.

2.64

-

11660.43

... More
Construction of Compound Wall in W.No.12;Earthwork excavation for structures as per drawing and technical specification clause 305.1 including setteing out, construction of shoring and bracing, removal of stumps and other deletrious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD/304 MORTH (RBR-FNDN-1) Manual means).(Ordinary soil) For Wall

15.84

-

3655.4



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.