Municipal Administration Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Administration Department Tender

Works
Civil And Construction
Civil Works Others
Building Construction
Opening Date20 Jan 2025
Closing Date27 Jan 2025
Tender Amount₹ 3,23,313 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Compound Wall at Prashanth Nagar Colony at Ward No.08;Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / of size 290mm x 225mm x 140mm for manufacturing fly ash solid blocks using fly ash of 80kgs, cement of 50 kgs, Gypsum of 5 kgs and stone dust from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes except GST on all materials and labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete all taxes except GST for finished item of work. (APSS No. 501 & 504).

8.19

6867

56247.94

... More
Construction of Compound Wall at Prashanth Nagar Colony at Ward No.08;Supplying fitting and placing THERMO Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) using primary producers like TATA , SAIL , VSP ,Jindhal , Shyam steel etc.. , of bar reinforcements below 36mm dia for RCC works , including labour charges.

200

77

15458

... More
Construction of Compound Wall at Prashanth Nagar Colony at Ward No.08;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and Using wooden centering, including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, for gate Columns

0.81

11317

9167.15

... More
Construction of Compound Wall at Prashanth Nagar Colony at Ward No.08;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and Using wooden centering, including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, for gate Fottings.

1.35

9498

12823.58

... More
Construction of Compound Wall at Prashanth Nagar Colony at Ward No.08;Construction of CRS Masonary 2nd Sort in Cement Mortor (1:6) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

10.23

4869

49814.68

... More
Construction of Compound Wall at Prashanth Nagar Colony at Ward No.08;Plain Cement Concrete (1:4:8) prop (cement : fine aggregate: Coarse aggregate) using 40mm size hard granite m/c metal including cost and conveyance of all materials like cement, sand,coarse aggregate water etc., to site seigniorage charges on all materials. and labours charges, for mixing laying concrete ramming in 15 CM layers, finishing top surface to the required level curing etc., Complete for finished item of work as per (SS .402).(with hand mixing)

3.6

4590

16526.05

... More
Construction of Compound Wall at Prashanth Nagar Colony at Ward No.08;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20B (APSS 308) in ordinary Soil- Mechanical Means up to 0M to 3M depth.

10.46

285

3021.87



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.