Municipal Administration Department Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Administration Department Tender
Civil And Construction
Drainage Work
Opening Date29 Jan 2025
Closing Date1 Feb 2025
Tender Amount₹ 8,04,652
Costs
EMD
₹ 8,047Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
572786Tender No
E1/IBPMC/04/41/MGF/2024-25Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Storm water drain 450mm dia RCC Np3 Pipe line;Lowering the RCC S/S pipes carefully into the trench laying them true to alignment and gradient, jointing RCC Pipes with Cement joints including curing, the cost of jointing materials, i.e., Cement Mortar (1:1:5), hemp yarn tec., and testing including filling with water with a water lead upto 500 metres excluding cost of rubber rings as per BIS No. 783/85.
138
242
33449.82
... More
Construction of Storm water drain 450mm dia RCC Np3 Pipe line;BLD-CSTN-2-7 - (15) ; Earth work excavation in Hard rock (blasting prohibited)-Upto 3 m depth for pipeline trench and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
6.21
2323
14430.86
... More
Construction of Storm water drain 450mm dia RCC Np3 Pipe line;RBR-FNDN-1- (i-A) In ordinary soils, by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines by manual means.
117.99
128
15130
... More
Construction of Storm water drain 450mm dia RCC Np3 Pipe line;Manufacture,Supply and Delivery of R.C.C Socket and Spigot pipes conforming to B.I.S 458/2003 AT ex-factory (rate per meter of effcetive length) including transporation,taxes &duties.
138
2319
320099
... More
Construction of Storm water drain 450mm dia RCC Np3 Pipe line;Cutting CC road suface including stacking of excavatd materials for pipe line trench work.
20.7
2345
48542
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements