Municipal Administration Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
515978Tender No
E1/Tender/Kyathanpally/Mplty/2024-25/1, Dated: 07-06-2024Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Construction of CC Drain;PCC M- 20 Nominal mix, CC (1:2:4) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work and including centering, shuttering.
0.89
6336
5655.03
Construction of CC Drain;Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).
95.2
1846
17580.01
Construction of CC Drain;VCC M- 20 Nominal mix, CC (1:2:4) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work and including centering, shuttering.
1.35
6824
9212.62
Construction of CC Drain;Laying of VCC(1:3:6)using 20mm (SS-5) graded HBG m/c metal and OPC coarse and fine aggregate confirming to IS:383 including cost and conveyance of all materials, labour charges, machine mixing, vibration, centring laying in position curing for 21 days etc., complete.
10.71
5658
60597.72
Construction of CC Drain;Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
5.1
4907
25027.63
Construction of CC Drain;Supply and Filling of Sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH.
5.1
1132
5774.67
Construction of CC Drain;Earthwork in excavation for Foundation of Buildings as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH.
35.7
270
9655.68