Municipal Administration Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Administration Department Tender
Civil And Construction
Excavation
Opening Date9 Aug 2023
Closing Date12 Aug 2023
Tender Amount₹ 4,95,179
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
446570Bid Award Id
ViewTender No
E/MCM/2023-24/15Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Fabrication and Installation of Earth Globe Hands Sculpture at Narayanpet Junction;Colour washing two coats with approved Colour and quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.
16
78
1248
Fabrication and Installation of Earth Globe Hands Sculpture at Narayanpet Junction;White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, including the cost and conveyance of all materials.
16
52
832
Fabrication and Installation of Earth Globe Hands Sculpture at Narayanpet Junction;Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, , finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work.
16
178
2863.36
Fabrication and Installation of Earth Globe Hands Sculpture at Narayanpet Junction;11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, but excluding conveyance charges of materials.
16
984
15756
Fabrication and Installation of Earth Globe Hands Sculpture at Narayanpet Junction;Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , ,on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
0.24
4783
1148.03
Fabrication and Installation of Earth Globe Hands Sculpture at Narayanpet Junction;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work.
9
382
3439.8
Fabrication and Installation of Earth Globe Hands Sculpture at Narayanpet Junction;Earth work Excavation for Foundation Ordinary Soil-Manual Means-Upto 3 m depth: Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B.
0.48
270
129.83
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements