Municipal Administration Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Administration Department Tender

Works
Civil And Construction
Civil Works Others
Building Construction
Opening Date3 Jan 2025
Closing Date7 Jan 2025
Tender Amount₹ 2,32,272 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Compound wall;Plain Cement Concrete - Nominal Mix (1:3:6) Prop with 20mm metal hand/machine mixing including cost and conveyance of all materials and labour charges etc., complete for Walls.

6.75

7972

53814.75

... More
Construction of Compound wall;Observed data based on IRR-CCDW1-8 : Providing and fixing 1.50 m long 16mm dia cold twisted deformed steel Anchor rods with 0.75m length driven in to the hole drilled in bed rock and remaining length embedded in concrete/ masonry including cost of all materials, machinary, labour, drilling and cleaning hole, driving Anchore rod, grouting hole with thick cement slurry etc, with intial lead up to 50m and all lifts.

44.44

474

21064.56

... More
Construction of Compound wall;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and With an initial lead of 10m including all operational,incidenatl ,labour charges such as shoring , sheeting, planking, struting, etc. complete for finished item of work inculding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

4.8

285

1369.77



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.