Municipal Administration Department Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Administration Department Tender

Works
Civil And Construction
Building Construction
Opening Date4 Sep 2024
Closing Date12 Sep 2024
Tender Amount₹ 3,53,013 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
development of the grave yard in dhamaka peta grave yard;S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 13.5 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-incharge

68

434

29512.63

... More
development of the grave yard in dhamaka peta grave yard;BLD-CSTN-10-3-(126) : Roofing with corrugated G.I sheets 0.80mm thick fixed with G.I ?J? bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including a coat of approved steel primer and two coats of approved paint on over lapping of sheets complete (upto a pitch of 600) and seigniorage charges, turnover tax etc., complete, excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials.

28

1212

33961.23

... More
development of the grave yard in dhamaka peta grave yard;0.0

150

127

19164.01

... More
development of the grave yard in dhamaka peta grave yard;Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works, Roof Trusses by using square / rectangular MS hollow section as per IS 4923 including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials including wastage to site with all taxes and duties etc complete for finished item of work

-

-

-

... More
development of the grave yard in dhamaka peta grave yard;Flooring with vitrified tiles of 1st quality, size 400 x 400 mmset over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

26.25

968

25412.6

... More
development of the grave yard in dhamaka peta grave yard;0.0

5.76

4989

28736.71

... More
development of the grave yard in dhamaka peta grave yard;Observed data : Providing and fixing 30/28 mm thick WPC ( Wood Plastic Composition ) Door Shutters as per manufacture specification fitted with Hinges, 2 Nos of 200 mm long MS Aldrop, 2 Nos of 125 mm lond M s door handle, 1 No.of 1 no. 250 mm long steel door latch including cost and conveyance of all material , all fixtures and all labour charges etc, for fixing etc, complete.

-

-

-

... More
development of the grave yard in dhamaka peta grave yard;TBSP-E.I-01:Providing and fixing 23" (584.2mm) long white glazed Indian WC Orissa pan of parry/Neycer/HSW make with P or S trap with brick masonry seat, CC squatting plate as approved by Engineer-in-charge, W.C. shall be encased on CC (1:2:4) 6? alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges and segniorage charges etc., complete for finished item of work.

2

2966

5932.98

... More
development of the grave yard in dhamaka peta grave yard;for welcome arch

40

127

5088

... More
development of the grave yard in dhamaka peta grave yard;BLD-CSTN-12-17-9 7 Amendment: Painting to new internal walls with 2 coats of Acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over existing base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912.

-

-

-

... More
development of the grave yard in dhamaka peta grave yard;0.0

141.4

188

26720.36

... More
development of the grave yard in dhamaka peta grave yard;dress changing room

10.8

-

-

... More
development of the grave yard in dhamaka peta grave yard;toilet walls

21.6

-

-

... More
development of the grave yard in dhamaka peta grave yard;long inside

21

-

-

... More
development of the grave yard in dhamaka peta grave yard;mideel inside

18

-

-

... More
development of the grave yard in dhamaka peta grave yard;sides

21

-

-

... More
development of the grave yard in dhamaka peta grave yard;long walls

49

-

-

... More
development of the grave yard in dhamaka peta grave yard;BLD-CSTN-8-4-(79): Plastering with 12mm thick in single coat in CM (1:6) finished smooth including cost and conveyance of all materials to site, charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

-

-

-

... More
development of the grave yard in dhamaka peta grave yard;0.0

11.84

6182

73219.84

... More
development of the grave yard in dhamaka peta grave yard;0.0

0.76

-

-

... More
development of the grave yard in dhamaka peta grave yard;drees change room

0.22

-

-

... More
development of the grave yard in dhamaka peta grave yard;wash room doors

0.22

-

-

... More
development of the grave yard in dhamaka peta grave yard;entrance door

0.32

-

-

... More
development of the grave yard in dhamaka peta grave yard;deductions

12.6

-

-

... More
development of the grave yard in dhamaka peta grave yard;dress change room for ladies

0.56

-

-

... More
development of the grave yard in dhamaka peta grave yard;for wash room walls

1.69

-

-

... More
development of the grave yard in dhamaka peta grave yard;short side

4.05

-

-

... More
development of the grave yard in dhamaka peta grave yard;cc plot form

6.3

-

-

... More
development of the grave yard in dhamaka peta grave yard;BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.

-

-

-

... More
development of the grave yard in dhamaka peta grave yard;0.0

10.35

4544

47031.75

... More
development of the grave yard in dhamaka peta grave yard;short walls bottom

4.05

-

-

... More
development of the grave yard in dhamaka peta grave yard;long walls bottombelow ground0.5+above ground 0.5

6.3

-

-

... More
development of the grave yard in dhamaka peta grave yard;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

-

-

-

... More
development of the grave yard in dhamaka peta grave yard;RCC Beams up to 3.66 Mts height

0.16

11378

1805.69

... More
development of the grave yard in dhamaka peta grave yard;for roof slab

0.28

14038

3948.43

... More
development of the grave yard in dhamaka peta grave yard;BLD-CSTN-3-13- ( 30 ) - C - Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for RCC SLABS, BEAMS -WOODEN SCAFFOLDING

-

-

-

... More
development of the grave yard in dhamaka peta grave yard;0.0

0.35

13633

4785.37

... More
development of the grave yard in dhamaka peta grave yard;above ground level

0.27

-

-

... More
development of the grave yard in dhamaka peta grave yard;up to ground level

0.08

-

-

... More
development of the grave yard in dhamaka peta grave yard;BLD-CSTN-2-13- (21) - B- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS - WOODEN SCAFFOLDING

-

-

-

... More
development of the grave yard in dhamaka peta grave yard;footing

0.24

7846

1906.78

... More
development of the grave yard in dhamaka peta grave yard;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement

-

-

-

... More
development of the grave yard in dhamaka peta grave yard;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars ( Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126

70

78

5490.1

... More
development of the grave yard in dhamaka peta grave yard;0.0

3.74

4689

17537.12

... More
development of the grave yard in dhamaka peta grave yard;0.0

0.15

-

-

... More
development of the grave yard in dhamaka peta grave yard;on the top of the rr srone

2.59

-

-

... More
development of the grave yard in dhamaka peta grave yard;short walls bottom

0.3

-

-

... More
development of the grave yard in dhamaka peta grave yard;long walls bottom

0.7

-

-

... More
development of the grave yard in dhamaka peta grave yard;BLD-CSTN-3-4 (21) -Hand mixing up to Plinth Level : Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

-

-

-

... More
development of the grave yard in dhamaka peta grave yard;0.0

7.2

342

2465.5

... More
development of the grave yard in dhamaka peta grave yard;for tank storing piller

1.2

-

-

... More
development of the grave yard in dhamaka peta grave yard;short walls

1.8

-

-

... More
development of the grave yard in dhamaka peta grave yard;long walls

4.2

-

-

... More
development of the grave yard in dhamaka peta grave yard;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including excluding dewatering charges etc as per SS - 20 B (APSS 308).

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.