Municipal Administration Department Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
258691Bid Award Id
ViewTender No
E1/86/9/MCP/2021-22Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
COMPOUND WALL;Flush Pointing to C.R.S masonry in C.M (1:3) prop using sand and cement including all labour charges etc.,complete for finished item of work.
29.49
-
2779
... More
COMPOUND WALL;Plastering to brick masonry in 20 mm thick to walls, base coat in C.M (1:5) prop including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.
110.99
-
27214
... More
COMPOUND WALL;Plain Cement concrete - Nominal Mix (1:2:4) using 40mm metal with hand mixing including cost and conveience of all the materials, labour charges etc. completed for finished item of work
0.6
-
3168
... More
COMPOUND WALL;Brick Masonry in C.M (1:6) prop with 2nd class Bricks traditional size 23 x 11 x 7 cms including cost and conveyance of all materials and all labour charges etc., complete for finished item of work as per S.S.
11.31
-
69522
... More
COMPOUND WALL;CRS Masonry in C.M.(1:6) prop. mix using 2nd sort stone including cost and conveyance charges of all the matetials, labour charges etc., complete for finished item of work.
6.64
-
27920
... More
COMPOUND WALL;R R Masonry in C.M.(1:6) prop. mix using 2nd sort stone including cost and conveyance charges of all the matetials, labour charges etc., complete for finished item of work.
8.85
-
33761
... More
COMPOUND WALL;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work and including centering, shuttering. PLINTH BEAM
1.9
-
21607
... More
COMPOUND WALL;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work and including centering, shuttering. COLUMNS
1.89
-
22619
... More
COMPOUND WALL;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work and including centering, shuttering. PEDESTALS
1.43
-
13430
... More
COMPOUND WALL;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work and including centering, shuttering.FOUNDATIONS:
0.94
-
8262
... More
COMPOUND WALL;Laying C.C Bed Plain Cement concrete (1:5:10) using 40 mm metal with Concrete mixture. All work upto plinth level. incudind labour charges cost and conveyance charges of all the materials etc., complete for finished item of work.
3.15
-
11391
... More
COMPOUND WALL;Filling(Quarry Rubbish) in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH
3.15
-
702
... More
COMPOUND WALL;Earthwork in excavation for Foundation of Buildings as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
24.26
-
5598
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements