Municipal Administration Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 1,599Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
567132Tender No
E1/2064/178/2024-25Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Balance Work of Buildings;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)
3.04
5203
15819
... More
Balance Work of Buildings;RBR-FNDN-1-A-I-manual means: Earthwork excavation for structures in all types of soils up to 3.00 Mts depth below GL by manual means as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD /304 MORTH. for Sumps, Thrust blocks, Chambers and Man Holes etc. by manual means,
1.35
5622
7590
... More
Balance Work of Buildings;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for structures in all types of soil as per drawing and technical specifications and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS-20 B (APSS 308).
5.4
297
1605
... More
Balance Work of Buildings;Construction of 457.20mmx457.20mm inspection chamber with brick masonry using 2nd class modular size (19x9x9cm) in CM (1:6) prop, upto a depth of 914.40mm including excavation in all types of soils laying 100mm thick plain CC (1:5:10) prop. bed making channel in plain CC (1:2:4) prop. 12mm thick plastering in CM (1:4) prop. to inside & outside walls & fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg including cost, seignarage, sales tax royalties of all materials, conveyance complete as per special specification and as directed by Engineer-in-charge for finished item of work.
1
4854
4855
... More
Balance Work of Buildings;Providing independent earthing for important equipment with 40 mm dia. B class 2.5 m long GI pipe and 19 mm dia B class G1 pipe of 0.3 m long connected with reducer providing GI funnel with mesh enclosed in CC chamber of 400 x 400 x 400 mm with RCC slab covered duly providing staggered holes filling with salt and charcoal from bottom of the pipe, giving earth connection from electrode through G1 strip of 25 x 6 mm length with all accessories and labor charges complete as per IS specifications 732/1982(Part-II) with latest amendment. for Main Panel
1
5525
5525
... More
Balance Work of Buildings;Supply and Fixing of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W. BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation:B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle' kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM( tolerance as per IS:374-2019), THD less than 10%. with remote or with all standard accessoriesand 400W Mini Modular Stepped type Electronic Regulator with Cover Frame including providing fan hook of 12/15mm dia M.S. rod/bar grouted in RCC slab with making the slab as original and 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching colour of fan etc,, complete
6
3389
20334
... More
Balance Work of Buildings;Painting and Writing of Building Name Board With Approved colours, letter sizes etc 6 coplete for a size of 1.80 x 0.60 Mtrs
1
5000
5000
... More
Balance Work of Buildings;Supply and fixing of Granite Inauguration Stone of Size 0.90x1.50 Mtrs including inaugural Matter Leter chisiling fixing On Wall including Cost, conveyence and All Labour charges etc complete.
1
18000
18000
... More
Balance Work of Buildings;Amendment 2021-22 BLD-CSTN-2-8 (16): Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
120
433
52046
... More
Balance Work of Buildings;S&F RCC pre castSlab of 1.20 Mtrs Dia for Septic
1
850
850
... More
Balance Work of Buildings;S&F RCC pre cast Rings of 1 20 Mtrs Dia for Septic tank
12
500
6000
... More
Balance Work of Buildings;BLD-CSTN-2-1 (9) Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for structures in all types of soil as per drawing and technical specifications and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS-20 B (APSS 308).
3.53
297
1049
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements