Municipal Administration Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Administration Department Tender

Works
Civil And Construction
Building Construction
Opening Date26 Jul 2024
Closing Date5 Aug 2024
Tender Amount₹ 1,58,536 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Toilet Construction;Supply of premium make CPVC Pipes of 22.20mm OD Pipe- SDR 13.5

15

202

3033

... More
Toilet Construction;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 450 x 300 mm - Single C.P. Pillar cock

1

1754

1754

... More
Toilet Construction;Supplying & fixing approved make Indian pattern white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-2004 with "P" or "S" trap: 580 mm long, Providing Brick masonry seat for Orissa pan/ Indian W.C. using traditional common burnt clay bricks as per standard practice and Providing Cement Concrete Squatting plate for Orissa pan/ Indian W.C. in P.C.C. 1:2:4 as per standard practice

2

2368

4738

... More
Toilet Construction;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

38.58

87

3371

... More
Toilet Construction;Plastering 20 mm thick in two coats with base coat of 16 mm thick in C.M.(1:6) top coat of 4 mm thick in C.M. ( 1 : 4 ) prop with dubara sponge finishing including cost and conveyance of all materials and water to work site and all operational incidental labour charges such as scaffolding, mixing mortar, lift charges, curing etc., complete. For exterior wall faces and for uneven faces other than plumb side

38.58

566

21872

... More
Toilet Construction;Brick masonry in C.M. ( 1:6 ) using 2nd class bricks of traditinal size 23 x 11 x 7 cm having a crushing strength of not less than 35 kgs / sqcm including cost and conveyance of all materials and water to work site and all operational incidental, labour charges such as scaffolding, mixing mortar constructing masonry, lift charges, curing etc. complete for finished item of work.

4.81

8072

38829

... More
Toilet Construction;Providing of Murum l, spreading Murum in uniform layers with consolidating each deposited layer by watering and ramming including cost and conveyance of gravel and water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work.

2.7

536

1448

... More
Toilet Construction;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

135.69

90

12268

... More
Toilet Construction;Construction of un-reinforced, un-reinforced, dowel jointed at expansion and construction joint only VCC M30 using, plain cement concrete pavement (Cement, fine aggregate, coarse aggregate) corresponding to table 9 of IS 456 using 20 mm to 10 mm),150mm thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than Concrete mixer 0.28 / 0.4 cum capacity cum capacity and using approved mix design, laid in approved fixed side formwork (steel channel, laying including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. FOR RAMP

1.35

6772

9143

... More
Toilet Construction;V.R.C.C. M-20 grade nominal mix (Cement, fine aggregate, coarse aggregate) corresponding to table 9 of IS 456 using 20 mm to 10 mm size graded machine crushed hard granite metal ( coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centring,shuttering FOR ROOF SLAB

5.94

1955

11616

... More
Toilet Construction;V.R.C.C. M-20 grade nominal mix (Cement, fine aggregate, coarse aggregate) corresponding to table 9 of IS 456 using 20 mm to 10 mm size graded machine crushed hard granite metal ( coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centring,shuttering FOR PLINTH BEAM

0.65

14408

9365

... More
Toilet Construction;(BLD-CSTN-6-12) RR Masonry in C.M.(1:6) prop.Using Randam Rabbul Stone hard granite Stone from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) RR Ston, water,mixing of Cement Mortor for Construction, etc., to Work site and Seigniorage charges, sales & other taxes, on all materials all operational, incidental and labour charges curing Etc., Complete for Finished item of Work.

4.12

4514

18598

... More
Toilet Construction;P.C.C. ( 1:4:8 ) using 40 mm nominal size H.B.G metal brought from approved quarry laid in position in layers not exceeding 15 cm in thickness including cost and conveyance of all materials and water to work site and all operational incidental, labour charges such as Machine mixing,laying, curing etc., complete for finished item of work

1.42

4798

6813

... More
Toilet Construction;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

5.15

285

1470



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.