Municipal Administration Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Administration Department Tender
Civil And Construction
Opening Date21 Sep 2024
Closing Date27 Sep 2024
Tender Amount₹ 3,88,189
Costs
EMD
₹ 3,882Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
545553Bid Award Id
ViewTender No
E1/2057/31/2024-25Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Laying of Piped Drain;Construction of sewer circular conical manhole as per type design using flyash Bricks of size 290x225x140mmmm Havingminimum crushing strength 75Kgs per Sqm as per Sqm as per IS:12894-1990 CLASS-7.5 in CM(1:6) Prop including CC (1:4:8) bed for foundation and of M15 (1:2.5:5) Prop using 20mm HG Metal for benching and chanels,inside palstering with 20mm thick using Sulphate resisit cement in CM(1:3) Prop and outside plastering with 20mm thick using OPC in CM(1:3) Prop The foundation concrete in CC (1:4:8) Prop using 40mm nominal size Hard broken granite stone for supporting incomming pipes with concrete block/ Masonary Whereever necessary including finishing the gap with CM(1:3) Prop on both sidses exavating pits upto requried depth in all types of soils and supply and fixing of 560mm dia Manhole frame and cover ( HD-20) and PVC encapsulated steps including cost and convyance of all materilas lobour charges and all other incidental and operational charges etc complete. 0.90m dia x 0.90m depth
10
13075
130760
Laying of Piped Drain;PHE-LJSW-13: Supply, Lowering and laying in ready made trench true to alignment and gradient, jointing, and testing of stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion and Spun yarn including cost and conveyance of pipe. (Reference to specifications BIS No. 6530/72) 200 mm dia
150
1024
153692
Laying of Piped Drain;RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) - up to 3.00Mts. below GL: Excavation in Hard Rock in habitant areas where conventional blasting can not be done for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete
6.08
2284
13877
Laying of Piped Drain;Earthwork in excavation for pipeline trenches as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (RBR-FNDN-1 Machanical Means)
121.5
128
15584