Municipal Administration Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Administration Department Tender
Civil And Construction
Building Construction
Opening Date31 Aug 2023
Closing Date14 Sep 2023
Tender Amount₹ 4,09,347
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
454221Bid Award Id
ViewTender No
E1/06/ACPT/2023(2nd call), Dt:31.08.2023Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
construction of Peerla Chavidi;Plain Cement concrete (1:5:10) using 40 mm metal with Concrete mixture. using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, sand(50% of Natural sand +50% of Manufactured sand(Rock Sand), coarse aggregate, water etc. to site, including Countryes & other taxes on all materials, all operational, incidental, and labor charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)
2.88
4125
11880
... More
construction of Peerla Chavidi;RR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand(50% of Natural sand +50% of Manufactured sand(Rock Sand), water, etc., to site including Sales & other taxes on all materials, all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615)
3.41
4242
14467
... More
construction of Peerla Chavidi;CRS Masonry in CM (1:6) 2nd Sort (Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand(50% of Natural sand +50% of Manufactured sand(Rock Sand), water, etc., to site including Sales & other taxes on all materials, all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615) Above Ground level
3.41
4712
16070
... More
construction of Peerla Chavidi;Flush Pointing with CM (1:3) to Brick / CRS Masonry
8.37
107
901
... More
construction of Peerla Chavidi;Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310).
13.23
432
5722
... More
construction of Peerla Chavidi;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for footings)
1.09
9350
10192
... More
construction of Peerla Chavidi;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Pedastals)
0.35
9938
3479
... More
construction of Peerla Chavidi;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Plinth Beam)
0.93
12099
11253
... More
construction of Peerla Chavidi;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Columns)
0.91
12559
11429
... More
construction of Peerla Chavidi;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Roof Beams)
0.93
11948
11112
... More
construction of Peerla Chavidi;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Roof slab 125mm thick)
2.65
11438
30312
... More
construction of Peerla Chavidi;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Platforms&Shelves 50 mm thick)
0.4
9350
3740
... More
construction of Peerla Chavidi;Providing high yield strength deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and Countryes & other taxes,on cost of all materials and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) for finished item of work (APSS No.126) in all floors.
633.4
89
56588
... More
construction of Peerla Chavidi;Brick Masonry in superstructure with CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand(50% of Natural sand +50% of Manufactured sand(Rock Sand), bricks, water etc., to site, excluding seignorage charges, including, Sales & other taxes on all materials, all operational, incidental and labor charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504)
11.27
7866
88659
... More
construction of Peerla Chavidi;Plastering 12mm thick in CM (1:4) Prop including Cost and Conveyance of all materials like cement, sand, water etc., to site, including other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, finishing, scaffolding, lift charges, including cutting of Grooves wherever necessary as directed by Engineer-in-charge, curing, etc., complete for finished item of work.(APSS 901& 903 ) for ceiling
29.95
176
5292
... More
construction of Peerla Chavidi;Plastering 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including c/c of all materials like cement, sand,water etc., to site, other taxes on all materials, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, etc., complete for for finished item of work . (APSS 1001,1003 & 1004) (CSSR)
39.9
511
20413
... More
construction of Peerla Chavidi;Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904).
48.6
524
25490
... More
construction of Peerla Chavidi;Flooring with double charged/ multi charged stain free full body porrcelain vitrifed tiles with double layea pigment of size 600x600mm and thickness between 8-10 mm 1st quality conforming to IS:15622-2017,IS 13630(Parts 1 to 15 )of any color and finish in all shades and design set over base coat of cement motor (1:8) ,12 mm thick over cc bed already laid or RCC roof slab, including neat cement slurry of hony like consistency spread @3.3kgs per sq.m & jointed neatly with white cement paste to full depth mixid with white cement paste mixed with pigment of matching shade to full depth, including cost of all materiials lke tiles, cement and water etc.,complete including seignorage charges ,etc complete for finished item of work.
21.2
1077
22836
... More
construction of Peerla Chavidi;Providing skirting to internal walls to15 cm height /risers of steps with double charged / multi charged stain free full body porrcelain vitrifed tiles with double layea pigment of size 600x600mm and thickness between 8-10 mm 1st quality conforming to IS:15622-2017,IS 13630(Parts 1 to 15 )of any color and finish in all shades and design set over base coat of cement motor (1:8) ,12 mm thick over cc bed already laid or RCC roof slab, including neat cement slurry of hony like consistency spread @3.3kgs per sq.m & jointed neatly with white cement paste to full depth mixid with white cement paste mixed with pigment of matching shade to full depth, including cost of all materiials lke tiles, cement and water etc.,complete including seignorage charges ,etc complete for finished item of work.
1.35
1254
1694
... More
construction of Peerla Chavidi;Painting , Priming Coat on New Plastered Surface for interior walls using water based cement primer of interior Grade-1 including cost and conveyance of all material to work site and all operational , incidental labour charges etc.complete for finished item of work
69.85
76
5342
... More
construction of Peerla Chavidi;Painting , Priming Coat on New Plastered Surface for interior walls using water based cement primer of exterior Grade-2 including cost and conveyance of all material to work site and all operational , incidental labour charges etc.complete for finished item of work
48.59
81
3951
... More
construction of Peerla Chavidi;painting walls with Snowcem or other equal and approved water proof cement paint over priming coat , two coat as per SS 911 for internal walls
48.6
269
13119
... More
construction of Peerla Chavidi;Supply and Laying of ISI 25mm outer dia medium grade with IS:9537 part 3 regid PVC Pipe concealed in wall with all required PVC /Metallic Junction Boxes including Masonry work and labour charges etc,Makes:Sudhakar/Finolex/Modi/VIP/Precision/Universal/Million Plast/Polycab/DEC
10
111
1113
... More
construction of Peerla Chavidi;Supply and Laying of ISI 25mm outer dia medium grade with IS:9537 part 3 regid PVC Pipe in Roof Slab with all required PVC /Metallic Junction Boxes including Masonry work and labour charges etc ,Makes:Sudhakar/Finolex/Modi/VIP/Precision/Universal/Million Plast/Polycab/DEC
10
90
907
... More
construction of Peerla Chavidi;wiring with 2 runs of 22/0.3mm (1.5 sq.mm)fire Retardant (FR) P.V.C insulated flexible copper cable (ISI Mark) in existing pipe with including supply of 6 module box, cover frame ,6A/10A 1 way 1 module modular switch and 3 Plate jumbo ceiling rose .including all labour charges etc,.. completed for light,bell,fan and exhaust fan points in non-residential buildings and as per 2.2.2 of standard revised data of BLD-ELEC-2-1.1(Makes:Sudhakar/Finolex/Modi/VIP/Precision/Universal/Million Plast/Polycab/DEC)
3
880
2642
... More
construction of Peerla Chavidi;supply and run of 22/0.3mm(1.5 sq.mm) FR P.V.C.insulated flexible copper cable in existing pipe for earth continuty including all labour charges etc.,complete (Makes:Sudhakar/Finolex/Modi/VIP/Precision/Universal/Million Plast/Polycab/DEC)
20
36
729
... More
construction of Peerla Chavidi;Supply and fixing of 6A ISI Mark 3/2 pin Modular socket with 6A 1way Module Switch with shutter on a commam switch board with earth continuty including wire leads, earth connections along with all lobour charges etc,.complete.Makes Switchs: leagrand arteor/Schneider zen/
3
337
1011
... More
construction of Peerla Chavidi;Supply and fixing of 16A 3pin / 6A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (5 in one) on decolam sheet covered board including earth connection and all labour charges etc., complete on wall.and as per 2.1.5 of Sta revised data of BLD -ELEC-2.1.5
1
432
433
... More
construction of Peerla Chavidi;Supply and run of 3 (Phase, Neutral and Earth ) of 2.5 sq.mm (36/0.3mm)FRLS/HFFR PVC insulated flexible copper cable in existing conduit pipe for individual lighting circuits including labour charges etc.,complete as required for switch boards.Makes of wires :RPG/Anchor/power flex/sun cab/delton /benlo/Gloster/Gemini/Nandicab/savera Champion/rhino/Unistar/windsor/Payal/Pawancab
20
138
2762
... More
construction of Peerla Chavidi;Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth Leakage Circute Braker (ELCB) / Residual Current Circute Braker (RCCB) / Double Pole (DP) Isolator as incomer and 10kA SP MCBs as out going including internal connections and labour charges for surface / flush mounting etc., complete.4.4.1 (SPN 4way D.B with IP-20 Protection suitable for single phase ECCB / RCCB/ DP Isolator of Make Legrand / Schneider / Siemens / L&T, 40A D.P.Isolator / ECCB / RCCB-1No and 10 kA - 6-32A range SP MCBs - 4Nos)
1
4193
4194
... More
construction of Peerla Chavidi;Providing independent earthing for important equipment with 40mm dia B class 2.5m long G.I pipe and 19mm dia B class G.I Pipe of 0.3mtr .long connected with reducer providing G.I funnel with mesh enclosed in CC/brick masonry chamber 450mx450mx450mm with R.C.C slab cover duly providing ..etc completed
1
6630
6631