Municipal Administration Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Administration Department Tender

Civil And Construction
Building Construction
Opening Date16 Feb 2023
Closing Date23 Feb 2023
Tender Amount₹ 7,90,122 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix M7.5 grade using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

4.81

-

25073.28

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-6-12-(67) : Construction of Random Rubble stone Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

4.52

-

21343.08

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-6-6-(61) : Construction of Coursed Rubble Stone Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

3.78

-

19460.99

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted-footings

2.37

-

25937.66

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted-pedestrals

0.54

-

6267.41

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted-plinth beams

1.46

-

20172.86

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted-xolumns

1.14

-

16391.84

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted-lintels

0.26

-

3734.24

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted-roof beams

2.24

-

29623.75

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted-roof slabs

4.13

-

52393.72

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted-sun shades

3.53

-

4133.63

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

973.14

-

89597

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-5-4-(42): Brick Masonry 2nd Class Ground moulded or traditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work.

10.6

-

85459.43

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-5-4-(42): Brick Masonry 2nd Class Ground moulded or traditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work.-parapet wall

4.55

-

40375.34

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls).

65.76

-

35248.68

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls).

44.66

-

26521.79

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work. (For Internal walls).

57.17

-

29260.18

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-8-1-(76) : Ornamental Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm.(for Ceiling)

28.45

-

5930.97

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-7-4-(75) : Providing raised / Cut Pointing on coursed or Ashlar stone Masonary or concrete block walling in White Cement Mortor (1:3) Prop, ( 1 cement : 3 Marble dust). including cost & conveyance of all materials to site and all labour charges etc., Complete for finished item of work

21.42

-

6281.63

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

65.76

-

5319.33

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Interior Gr-1 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

85.62

-

6459.17

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-12-3-(170) & amendment; Painting to walls with two coats of acrylic emulsion paint exterior grade having VOC (Volatile Organic Compound) content less than 50 grams/ liter and shade over existing base coat of water based primer of exterior grade-2 of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls.

65.76

-

12072.22

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-12-17-9 7 Amendment: Painting to new internal walls with 2 coats of Acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over existing base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912.

85.62

-

9938.77

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-CSTN-9-1-(99) : Flooring with Polished Shahabad/Tandur stones slab of all sizes between 15-18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones and labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.

25.15

-

20414

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;Providing skirting to internal walls to 15 cm height/risers of steps with 15 mm thick polished Shahabad stone length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Cuddapah stone, cement, sand and water etc., complete including charges, etc., complete for finished item of work

2.84

-

2505.87

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;Supply and Fixing of Main Door with Double leaf shutters, of size1.20x2.10m Door with Sal wood Frame of sections size 100mm x 125mm with Door Shutter 50mm thick Sal wood including cost of fixtures such as Brass Tower Bolts 300mm long 4 Nos, ,Brass Handles 150mm long 4 Nos, 300mm long Brass Aldrops 2No, 150mm long Brass butt hinges 6Nos, Brass Door stopper 2 Nos, MS Hold fasts 8Nos 230mm long , including cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

2.52

-

31127.54

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;Supply and fixing of Pre Laminated Cement Bonded Particle Board (as per IS-14276) WINDOWS with Pre-Painted Steel Sections fabricated from pre-painted Cold rolled formed sections made of galvanized steel color coated sections {Base steel as per 15-512 quality, galvanized as per IS-277 with Zinc of 120 gram/sqm) with total coated thickness of 0.58mm primer coated with epoxy primer of 5-7 microns thick, finish painted with polyester paint of 12-16 microns and back coated with alkyd backer of 5-7 microns), the sections for outer frame and centre mullion (duly filled with PU form of 40 kg/Cum) should be of 60mm x 50mm, with provision for fixing glazed shutter. The section for glazed/paneled shutter should be of size 48mm x 25 mm and another section of size 60mm x 23mm should be provided for separating glazed and paneled portion 5 mm thick colour pin headed glass is to be provided for glazing and providing guard bars of 10mm square rods duly welded at 150mm pitch to MS flat section of size 18mm and 3mm thick. Windows are to be fixed to wall by means of self expansion nylon Cap (75) and electroplated wooden screws of size 100mm, including aluminum powder coated fittings, A)75mm long grip handles 1 no per shutter, B) 75 mm long tower bolts 2 nos. per shutter, C) Heavy duty 55 Pivot hinges 2 nos per shutter, D) MS Powder coated telescopic stay 1no per shutter.

4.32

-

38003.95

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, , including conveyance charges of materials and all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

33

-

19294.44

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-ELEC-1-4-2C :Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

52.5

-

5346.6

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-ELEC-1-3-2 : Supply and Fixing of 25mm dia 1.5mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains. Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro.

52.5

-

5951.93

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

40

-

31147.6

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

20

-

3324

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-ELEC-2-1-5 : Supply and fixing of 16A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (2 in one) on decolam sheet covered board including earth connection and all labour charges etc., complete on wall. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

10

-

2854

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Earth Continuity including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

180

-

4975.2

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Mains including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

120

-

12765.6

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;Supply and run of 2 of 56/0.3mm (4 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Mains including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

60

-

9696.6

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

2

-

13261.14

... More
CONSTRUCTION OF PUSALA COMMUNITY HALL;ELEC data -4-1-1: Supply and erection of Panel mounting cubical type 30 / 32A TPN 415V, 50 Hz. switch disconnector fuse unit complete with front drive mechanism with door inter lock, padlocking arrangement etc., complete with fuse links on existing control panel. ( Fuse unit makes : L&T / SCHNEIDER / C&S / ABB / SIEMENS- Fuse Links : Makes : L & T / C & S / Standard / HPL / Havells / Siemens / Indo Asian.

4

-

8008.76



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.