Municipal Administration Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Administration Department Tender
Civil And Construction
Civil Works Others
Opening Date18 Oct 2024
Closing Date25 Oct 2024
Tender Amount₹ 49,65,188
Costs
EMD
₹ 49,652Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
551703Tender No
E1/546/VMD/15th FC/2021-22Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Construction of Sanitation Vehicle Parking area place;Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. For Columns
22.47
14339
322198
Construction of Sanitation Vehicle Parking area place;Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Footings
24.3
10517
255571
Construction of Sanitation Vehicle Parking area place;Plain cement concrete in M10 using 20 mm graded size hard broken machine crushed granite metal as per SS including cost and conveyance of all materials and labour charges such as mixing concrete, laying, tamping, curing all operational, incidental charges etc., complete as per SS for finished item of work for building foundation concrete.
18.94
4821
91328
Construction of Sanitation Vehicle Parking area place;RBR-FNDN-1: B i: Earthwork excavation in ordinary soil by mechanical means up to 3 mts depth for structures as per drawing and technical specifications Clause 305.1 including disposal upto a lead of 50 m, dressing of sides and bottom as per Technical Specification 305 MORD / 304 MORTH.
124.85
128
16010
Construction of Sanitation Vehicle Parking area place;Carting of surplus excavated earth /rock/ soil or any debris for a lead of 5kms from the site to suitable place including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.
45
72
3276
Construction of Sanitation Vehicle Parking area place;Saw cut joints for freshly laid concrete pavement including all material and labour charges (Grooves 2-3 mm)
1140
99
113977
Construction of Sanitation Vehicle Parking area place;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical trawelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work.
880
85
74985
Construction of Sanitation Vehicle Parking area place;RBR-CCPV-5-Construction of M30 grade plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement @ 350 kg per cum or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
158.4
6223
985798
Construction of Sanitation Vehicle Parking area place;RBR-SBBS-11 B: Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
89.32
1973
176308
Construction of Sanitation Vehicle Parking area place;RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MORTH specification No.301 and as directed by the Engineer-in-Charge.
89.32
76
6827
Construction of Sanitation Vehicle Parking area place;Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade II making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912.
603.59
273
164967
Construction of Sanitation Vehicle Parking area place;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls)
603.59
543
328256
Construction of Sanitation Vehicle Parking area place;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work
46.12
7913
364984
Construction of Sanitation Vehicle Parking area place;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500/500D/550D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work.( APSS No.126).
2031.5
78
159432
Construction of Sanitation Vehicle Parking area place;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code For Lintels
1.51
14357
21679
Construction of Sanitation Vehicle Parking area place;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code For entrance arch roof beams
0.61
13175
8037
Construction of Sanitation Vehicle Parking area place;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code For RCC Columns
7.88
14339
112992
Construction of Sanitation Vehicle Parking area place;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code For Plinth Beam
5.29
13762
72802
Construction of Sanitation Vehicle Parking area place;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code For Footings
10.4
10517
109380
Construction of Sanitation Vehicle Parking area place;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .
47.08
4689
220779
Construction of Sanitation Vehicle Parking area place;Plain cement concrete in M10 using 20 mm graded size hard broken machine crushed granite metal as per SS including cost and conveyance of all materials and labour charges such as mixing concrete, laying, tamping, curing all operational, incidental charges etc., complete as per SS for finished item of work for building foundation concrete.
14.53
4821
70063
Construction of Sanitation Vehicle Parking area place;RBR-FNDN-1: B i: Earthwork excavation in ordinary soil by mechanical means up to 3 mts depth for structures as per drawing and technical specifications Clause 305.1 including disposal upto a lead of 50 m, dressing of sides and bottom as per Technical Specification 305 MORD / 304 MORTH.
103.76
128
13305