Municipal Administration Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Administration Department Tender

Civil And Construction
Building Construction
Opening Date14 Aug 2023
Closing Date21 Aug 2023
Tender Amount₹ 20,40,150 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of building;Supply and run of 3 (Phase, Neutral and Earth) of 2.5 sq.mm (36/0.3mm) FRLS / HFFR PVC insulated flexible copper cable in existing conduit pipe for individual lighting circuits including labour charges etc., complete as required for switch boards. Makes of wires : RPG / Anchor / Power Flex / Sun Cab / Delton / Benlo / Gloster / Gemini / Nandicab / Savera Champion / Rhino / Unistar / Windsor / Payal / Pawancab

20

138

2762

... More
Construction of building;Supply and fixing of 6A 3/2 pin flush type Socket with shutter with 6A 1 Way flush type Swich control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete..and as per 2.1.4 of Sta revised data of BLD -ELEC-2.1.4

6

168

1014

... More
Construction of building;Supply and fixing of 6A ISI Mark 3/2 pin Modular socket with 6A 1Way Module switch, 2 Module socket with shutter on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes of switches: Legrand Arteor / Schneider Zen celo /Honeywell Blenge Plus / Cabtree Amare / Logus Platina / GM-Zenova / L&T- Englaze / Million mway / Goldmedal Curve / Anchor Roma viola / Havells Fabio / Panasonic Vision / Hager Insista /C&S Primo / Polycab Levana.

6

337

2023

... More
Construction of building;supply and run of 22/0.3mm(1.5 sq.mm) FR P.V.C.insulated flexible copper cable in existing pipe for earth continuty including all labour charges etc.,complete (Makes:Sudhakar/Finolex/Modi/VIP/Precision/Universal/Million Plast/Polycab/DEC)

50

36

1824

... More
Construction of building;wiring with 2 runs of 22/0.3mm (1.5 sq.mm)fire Retardant (FR) P.V.C insulated flexible copper cable (ISI Mark) in existing pipe with including supply of 6 module box, cover frame ,6A/10A 1 way 1 module modular switch and 3 Plate jumbo ceiling rose .including all labour charges etc,.. completed for light,bell,fan and exhaust fan points in non-residential buildings and as per 2.2.2 of standard revised data of BLD-ELEC-2-1.1(Makes:Sudhakar/Finolex/Modi/VIP/Precision/Universal/Million Plast/Polycab/DEC)

12

880

10566

... More
Construction of building;Supply and Laying of ISI 25mm outer dia medium grade with IS:9537 part 3 regid PVC Pipe in Roof Slab with all required PVC /Metallic Junction Boxes including Masonry work and labour charges etc ,Makes:Sudhakar/Finolex/Modi/VIP/Precision/Universal/Million Plast/Polycab/DEC

30

90

2721

... More
Construction of building;Supply and Laying of ISI 25mm outer dia medium grade with IS:9537 part 3 regid PVC Pipe concealed in wall with all required PVC /Metallic Junction Boxes including Masonry work and labour charges etc,Makes:Sudhakar/Finolex/Modi/VIP/Precision/Universal/Million Plast/Polycab/DEC

30

111

3339

... More
Construction of building;Supply and fixing of fully panelled Window frame and shutters of size 1.20 x 1.20 M with Salwood frame of size 75x100mm and S/F of 4 Nos. MS Hold fasts, incl. all labour charges such as making window frame and shutters and fiXing 10 Nos.of 12 mm square safety bars in to the frame etc,including applying primory coat, cost and conveyance of all materials .

8

9542

76339

... More
Construction of building;Supply & fixing of Rolling shutter made of 80 x1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm Diameter nominal bore MS B class pipe with brackets,plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special Spec: 1108

15.05

5217

78519

... More
Construction of building;Supply and fixing of Salwood Door double shutter fully panelled door of size 0.90 x 2.1mt with frame made of well seasoned Sal Wood scantlings of size 75 x 125 mm and shutter made of side rails 100mm X 32mm, top rail 100 mmX32 mm, bottom rail 100mmX 32 mm and intermediate rails of 100mm x 32 mm and planks s - 5 no's of 25mm thick as per approved design with fixtures of 6 nos of 9" ' z" holdfasts, 300 mm long MS Iron coted aldrop-1 no, 125mm long MS iron butt hinges 6 No's, Door stoppers-2 no, 150mm long MS coated Tower bolts 3- no's MS iron coated fancy handles 150 mm -2nos with necessary screws complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS NO.1001 & 1002)

2

12139

24280

... More
Construction of building;Supply and fixing of Salwood Door Single shutter fully panelled door of size 1.05 x 2.1mt with frame made of well seasoned Sal Wood scantlings of size 75 x 125 mm and shutter made of side rails 100mm X 32mm, top rail 100 mmX32 mm, bottom rail 100mmX 32 mm and intermediate rails of 100mm x 32 mm and planks s - 5 no's of 25mm thick as per approved design with fixtures of 6 nos of 9" ' z" holdfasts, 300 mm long MS Iron coted aldrop-1 no, 125mm long MS iron butt hinges 6 No's, Door stoppers-2 no, 150mm long MS coated Tower bolts 3- no's MS iron coated fancy handles 150 mm -2nos with necessary screws complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS NO.1001 & 1002)

2

12583

25167

... More
Construction of building;Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904).

167.83

524

88025

... More
Construction of building;Plastering 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including c/c of all materials like cement, sand,water etc., to site, other taxes on all materials, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, etc., complete for for finished item of work . (APSS 1001,1003 & 1004) (CSSR)

293.04

511

149922

... More
Construction of building;Plastering 12mm thick in CM (1:4) Prop including Cost and Conveyance of all materials like cement, sand, water etc., to site, including other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, finishing, scaffolding, lift charges, including cutting of Grooves wherever necessary as directed by Engineer-in-charge, curing, etc., complete for finished item of work.(APSS 901& 903 ) for ceiling

226.34

176

39990

... More
Construction of building;Reinforced Brick Masonry for partition walls (115 mm thick) in CM (1:4) prop.(Cement:Sand) using Bricks second class or ground moulded (Non-Modular or traditional size) of size 23 x 11 x 7 cm from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls wherever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, excluding cost of seigniorage charges on all materials, but including cost of scaffolding charges and all labour charges like mixing cement mortar, lift charges, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 509)

45.84

897

41122

... More
Construction of building;Brick Masonry in superstructure with CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand(50% of Natural sand +50% of Manufactured sand(Rock Sand), bricks, water etc., to site, excluding seignorage charges, including, Sales & other taxes on all materials, all operational, incidental and labor charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504)

39.77

7866

312862

... More
Construction of building;Providing high yield strength deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and Countryes & other taxes,on cost of all materials and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) for finished item of work (APSS No.126) in all floors.

4738

89

423293

... More
Construction of building;Plain Cement concrete (1:3:6) using 20 mm metal proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size HBG (SS5) metal from from approved quarry including cost and conveyance of all materials like cement, sand(50% of Natural sand +50% of Manufactured sand(Rock Sand), coarse aggregate, water etc. to site, excluding seignorage charges, including, Sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402)

0.5

4632

2316

... More
Construction of building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for sill slabs)

0.1

9350

935

... More
Construction of building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Platforms&Shelves 50 mm thick)

0.33

9350

3086

... More
Construction of building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for sun shades)

12

641

7704

... More
Construction of building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for stair case waist slab 200mm thick)

3.66

10577

38713

... More
Construction of building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Roof slab 150mm thick)

18.68

11808

220576

... More
Construction of building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Roof Beams)

5.68

11948

67868

... More
Construction of building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Lintels)

0.62

12722

7888

... More
Construction of building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Columns)

3.85

12559

48355

... More
Construction of building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Plingth beam)

5.66

12099

68485

... More
Construction of building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for Pedastals)

1.13

9938

11231

... More
Construction of building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate(50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) (for footings)

3.54

9350

33100

... More
Construction of building;Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310).

74.71

419

31377

... More
Construction of building;Flush Pointing with CM (1:3) to Brick / CRS Masonry

22.94

107

2471

... More
Construction of building;CRS Masonry in CM (1:6) 2nd Sort (Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand(50% of Natural sand +50% of Manufactured sand(Rock Sand), water, etc., to site including Sales & other taxes on all materials, all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615) Above Ground level

9.14

4712

43074

... More
Construction of building;RR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand(50% of Natural sand +50% of Manufactured sand(Rock Sand), water, etc., to site including Sales & other taxes on all materials, all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615)

9.14

4242

38777

... More
Construction of building;Plain Cement concrete (1:5:10) using 40 mm metal with Concrete mixture. using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, sand(50% of Natural sand +50% of Manufactured sand(Rock Sand), coarse aggregate, water etc. to site, including Countryes & other taxes on all materials, all operational, incidental, and labor charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)

13.07

4125

53915

... More
Construction of building;Plain Cement concrete (1:4:8) using 40 mm metal with Concrete mixture. using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, sand(50% of Natural sand +50% of Manufactured sand(Rock Sand), coarse aggregate, water etc. to site, including Countryes & other taxes on all materials, all operational, incidental, and labor charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)

2.2

4316

9496

... More
Construction of building;Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B (APSS 308)

45.66

270

12350



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.