For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Administration Department Tender
Civil And Construction
Opening Date20 Sep 2024
Closing Date27 Sep 2024
Tender Amount₹ 23,56,976
Costs
EMD
₹ 23,570Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
545443Tender No
E1/2057/4/2024-25Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Construction of Compound wall;Wiring with run of 2 of 1.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990,IS 17048 specification for Copper cable. in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for light, Fan, Exhaust fan and bell points in N.R.B.14Makes of wires: Finolex / RR kabel / Havells / Polycab / Finecab Gold (HFFR)/GM(HFFR) / Gold Medal (HFFR) / Million (HFFR) / KEI (HFFR) /V-Guard (HFFR) / DEC (FRLS / HFFR) / Avocab (HFFR) / Fortune Arrt (HFFR)/Nakoda (HFFR) / HPL (HFFR). Makes of switches: Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T- Englaze. Ground Floor
250
777
194270
Construction of Compound wall;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted.
1.19
14882
17710.44
Construction of Compound wall;Supply and transportation of 24 W +/-10% (>= 2400 Lumens back lit LED Down Light Recessed / Surface mounting round / square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 5 years warranty with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix / HPL / Eveready / Surya / Keselec / Arraystorm / GM / Goldmedal / Goldwyn / Fortune Arrt / Lighting Technologies LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.
15
1920
28801.35
Construction of Compound wall;Pedastals
3.38
12155
41086.1
Construction of Compound wall;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted for footings
2.59
11529
29861.74
Construction of Compound wall;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
775.5
80
62381.22
Construction of Compound wall;BLD-CSTN-12-5(172): Painting to new walls with 2coats of waterproof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remain soft loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.complete for finished item of work as per SS 912 for internal walls
505
285
144172.45
Construction of Compound wall;Supply and Fixing in position of steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows etc, including cost and conveyance of all material, labour charges for fabrication and fixing in postion etc.. Complete as per IS 2062-2011 E 250 BR.
3500
121
425495
Construction of Compound wall;BLD-CSTN-8-10-(85) : Plastering 12mm thick in two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (Internal walls)
505
586
296379.45
Construction of Compound wall;BLD-CSTN-5-17-(55): Masonry work in CM (1:4) prop with Flyash Cement solid blocks of size 145x225x140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.
67.54
9000
607878.91
Construction of Compound wall;BLD-CSTN-3-21 ( 33 ) Damp proof course 50mm thick with 1:2:4 cement concrete Nominal mix, using 12mm hard broken stone aggregate including cost of all materials, including conveyance charges of materials cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)
29.25
281
8237.68
Construction of Compound wall;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work
36.56
5210
190491.49
Construction of Compound wall;BLD-CSTN-3-5 (22) - Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
6.23
5452
33971.75
Construction of Compound wall;BLD-CSTN-2-2(10) : Earth work excavation in Ordinary soils by Mechcanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
56.81
129
7348.94